To estimate design floods for hydraulic structures, statistical methods has been used in the analysis of rainfall data. However, due to the lack of rainfalldata in some regions, it is difficult to apply the statistical methods for estimation of design rainfall. In addition, increased uncertainty of design rainfallarising from the limited rainfall data can become an important factor for determining the design floods. The main objective of this study was to assess theuncertainty of the future design floods under RCP (representative concentration pathways) scenarios using a bootstrap technique. The technique was usedin this study to quantify the uncertainty in the estimation of the future design floods. The Yongdang watershed in South Korea, 2,873 ha in size, wasselected as the study area. The study results showed that the standard errors of the basin of Yongdang reservoir were calculated as 2.0~6.9 % of probablerainfall. The standard errors of RCP4.5 scenario were higher than the standard errors of RCP8.5 scenario. As the results of estimation of design flood, theranges of peak flows considered uncertainty were 2.3~7.1 %, and were different each duration and scenario. This study might be expected to be used asone of guidelines to consider when designing hydraulic structures.
Abstract
To estimate design floods for hydraulic structures, statistical methods has been used in the analysis of rainfall data. However, due to the lack of rainfalldata in some regions, it is difficult to apply the statistical methods for estimation of design rainfall. In addition, increased uncertainty of design rainfallarising from the limited rainfall data can become an important factor for determining the design floods. The main objective of this study was to assess theuncertainty of the future design floods under RCP (representative concentration pathways) scenarios using a bootstrap technique. The technique was usedin this study to quantify the uncertainty in the estimation of the future design floods. The Yongdang watershed in South Korea, 2,873 ha in size, wasselected as the study area. The study results showed that the standard errors of the basin of Yongdang reservoir were calculated as 2.0~6.9 % of probablerainfall. The standard errors of RCP4.5 scenario were higher than the standard errors of RCP8.5 scenario. As the results of estimation of design flood, theranges of peak flows considered uncertainty were 2.3~7.1 %, and were different each duration and scenario. This study might be expected to be used asone of guidelines to consider when designing hydraulic structures.
참고문헌 (18)
- Efron, B, "Bootstrap methods : another look at the jackknife", Annals of Statistics, 7, pp.1~26 (1979)
- Efron, B, "An Introduction to the Bootstrap", pp.1993, Chapman & Hall
- Efron, B, "Second Thoughts on the Bootstrap", Statistical Science, 18(2), pp.135~140 (2003)
- Summary for policymakers. In: Climate change 2013: The physical science basis. Contribution of working group I to the fifth assessment report of the Intergovernmental Panel on Climate Change. Cambridge University Press, "Intergovernmental Panel on Climate Change (IPCC)", ~ (2013)
- Iwashima, T, "A statistical analysis of the extreme events: long-term trend of heavy daily precipitation", Journal of the Meteorological Society of Japan, 71, pp.637~640 (1993)
- Jeong, J. H, "Water Resource Design Practice" (2007), Goomibook
- 조덕준, "확률강우량을 초과하는 호우사상의 발생특성 분석", 한국방재학회논문집, 12(2), pp.309~313 (2012), 한국방재학회[DOI]
- Karl, T. R, "Secular trends of precipitation amount, frequency, and intensity in the United States", Bull. Am. Meteorol. Soc, 79, pp.231~241 (1998)
- 김종호, "불확실성을 고려한 기후변화 예측: 1. GCM과 RCP 불확실성", 한국방재학회논문집, 14(5), pp.317~327 (2014), 한국방재학회
- General plan of heightening business for irrigation dam in Yongdang district, "Korea Rural Community Corporation (KRC)", ~ (2010)
- Lee, J. S, "Runoff analysis of reservoir basin using HEC-HMS", Hanbat University Journal, 24, pp.39~48 (2007)
- 이건행, "강우-유출 모형의 불확실성을 고려한 돌발홍수기준", 한국습지학회지, 12(3), pp.155~163 (2010), 한국습지학회
- Ministry of Land, Infrastructure, and Transport (MOLIT), "Design flood estimation guidelines", ~ (2012)
- Climate change scenario report corresponding IPCC 5th assessment report, "National Institute of Meteorological Research (NIMR)", ~ (2012)
- 류정훈, "RCP 시나리오에 따른 계룡저수지 유역의 설계홍수량 산정", 한국농공학회논문집, 57(1), pp.47~57 (2015), 한국농공학회
- Seo, Y. M, "Flood risk analysis in water resources planning -flood risk analysis with consideration of rainfall uncertainty", Ph.D, pp.2011
- Wagener, T, "Towards reduced uncertainty in conceptual rainfall-runoff modelling: Dynamic identifiability analysis, Hydrol", Process, 17, pp.455~476 (2003)
- Yun, Y. N, "Plan of flood damage mitigation considered uncertainty analysis", Journal of Korea Water Resources Association, 33(1), pp.382~387 (2000)