The decommissioning of a nuclear power plant requires not only the management of manyresources but also the execution and management of many tasks according to the decommissioningprocess. Therefore, prior to decommissioning a nuclear power plant, a cost estimate process isessential through a reasonable decommissioning cost evaluation through sufficient research and review. Considering the domestic decommissioning situations which have only experience in decommissioning tworesearch reactors, there are many difficulties in performing detailed and accurate decommissioning costassessments. In this study, in order to develop the work difficulty factors suitable for the decommissioningsituation of a domestic nuclear power plant, the work difficulty factors previously used in overseasdecommissioning were improved by utilizing the premium labor cost factors of standard costing usedin domestic other industries. It was confirmed that the premium labor cost factors of standard costinghave the same addition method as the work difficulty factor and contain similar factors. Also, throughanalyzing the premium labor cost factors, the factors applicable to the existing work difficulty factors werederived. It is expected that the improved work difficulty factor through this study can be used as basic datain the domestic nuclear power plants decommissioning in the future by performing the evaluation of thefeasibility of the selected items and the suitability of premium labor cost.
Abstract
The decommissioning of a nuclear power plant requires not only the management of manyresources but also the execution and management of many tasks according to the decommissioningprocess. Therefore, prior to decommissioning a nuclear power plant, a cost estimate process isessential through a reasonable decommissioning cost evaluation through sufficient research and review. Considering the domestic decommissioning situations which have only experience in decommissioning tworesearch reactors, there are many difficulties in performing detailed and accurate decommissioning costassessments. In this study, in order to develop the work difficulty factors suitable for the decommissioningsituation of a domestic nuclear power plant, the work difficulty factors previously used in overseasdecommissioning were improved by utilizing the premium labor cost factors of standard costing usedin domestic other industries. It was confirmed that the premium labor cost factors of standard costinghave the same addition method as the work difficulty factor and contain similar factors. Also, throughanalyzing the premium labor cost factors, the factors applicable to the existing work difficulty factors werederived. It is expected that the improved work difficulty factor through this study can be used as basic datain the domestic nuclear power plants decommissioning in the future by performing the evaluation of thefeasibility of the selected items and the suitability of premium labor cost.
참고문헌 (9)
- 원자력안전위원회, "원자력안전법 제28조", ~ (2021)
- 석수동, "중수로 원전해체를 위한 방사선원항 특성 고찰", 방사선산업학회지, 15(4), pp.319~327 (2021), (사)한국방사선산업학회[DOI]
- 정관성, "연구용원자로 해체비용 산정을 위한 단위비용인자 산출", Journal of Nuclear Fuel Cycle and Waste Technology, 4(4), pp.385~391 (2006), 한국방사성폐기물학회
- LaGuardia TS, "Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates", pp.5.9~5.13 (1986), Atomic Industrial Forum, Inc
- IAEA, "Data Analysis and Collection for Costing of Research Reactor Decommissioning" (2017)
- 한국원자력연구원, "예비 해체계획서(아라 연구동)" (2019)
- 한국정보통신공사협회, "2021년 정보통신공사 표준품셈해설서" (2021)
- Park W-S, "A study on application method of “Result unit cost” to Nuclear Power Plant (NPP) construction cost estimating", Proc. Korean Inst. Build. Constr. Conf, 14(1), pp.46~47 (2014)
- 한국건설기술연구원, "2021 건설공사 표준품셈" (2021)