There is no case of decommissioning the Pressurized Heavy Water Reactor (PHWR) inthe world, and a similar cases related to the decommissioning of the PHWR Reactor assembly are theexperiences of replacing the pressure tube (fuel channel assembly) and the calandria tube. In Korea,there is a case of replacing the pressure tube (fuel channel assembly) and the calandria tube for theWolsong Unit 1. This paper examines the standard work and process for decommissioning of thePHWR Reactor assembly with reference to this case. For the decommissioning of the PHWR Reactorassembly, the standard work and process are prepared based on the description of the structure of theReactor assembly and the order of dismantling the structure in consideration of the specific structureof the Reactor assembly. In order to standardize the decommissioning standard work and process, it isnecessary to set the dismantling area and the work difficulty factor. The unit decommissioning areasare set by including the information such as major SSCs, radiation zone classification and building namefor each zone. The work difficulty factors are to consider additional time that is unavoidably caused bythe radiation environment and work environment during dismantling work. The work difficulty factorsinclude work accessibility, wearing protective equipments, work permit and approval in the radiationcontrol area, and work break time, etc.
Abstract
There is no case of decommissioning the Pressurized Heavy Water Reactor (PHWR) inthe world, and a similar cases related to the decommissioning of the PHWR Reactor assembly are theexperiences of replacing the pressure tube (fuel channel assembly) and the calandria tube. In Korea,there is a case of replacing the pressure tube (fuel channel assembly) and the calandria tube for theWolsong Unit 1. This paper examines the standard work and process for decommissioning of thePHWR Reactor assembly with reference to this case. For the decommissioning of the PHWR Reactorassembly, the standard work and process are prepared based on the description of the structure of theReactor assembly and the order of dismantling the structure in consideration of the specific structureof the Reactor assembly. In order to standardize the decommissioning standard work and process, it isnecessary to set the dismantling area and the work difficulty factor. The unit decommissioning areasare set by including the information such as major SSCs, radiation zone classification and building namefor each zone. The work difficulty factors are to consider additional time that is unavoidably caused bythe radiation environment and work environment during dismantling work. The work difficulty factorsinclude work accessibility, wearing protective equipments, work permit and approval in the radiationcontrol area, and work break time, etc.
참고문헌 (23)
- Yeo JS, "KISTEP Technology Trend Brief - Decommissioning of nuclear power plants", pp.7~ (2019), Korea Institute of Science and Technology Opportunity Assessment
- Korea Hydro & Nuclear Power Co., Ltd, "Current status of KHNP’s nuclear power plant decommissioning project. The basic course of decommissioning a nuclear power plant", The Korea Atomic Industrial Forum (2021)
- Nuclear decommissioning industry advancement task, "Korea Atomic Energy Research Institute", ~ (2018)
- Ministry of Trade, Industry and Energy, "Nuclear Power Generation White Paper", pp.228~230 (2016), Korea Hydro & Nuclear Power Co., Ltd
- IAEA, "Assessment and Management of Ageing of Major Nuclear Power Plant Components Important to Safety: CANDU reactor assemblies", pp.7~9 (2001), pp
- 최성남, "중수로 연료관 검사시스템 개발", 비파괴검사학회지, 36(1), pp.60~67 (2016), 한국비파괴검사학회[DOI]
- Final safety analysis report for public release of Wolsong Unit 1 Chapter 4 reactor, Chapter 5 reactor process system, "Korea Hydro & Nuclear Power Co., Ltd", ~ (2021)
- 정관성, "연구용원자로 해체비용 산정을 위한 단위비용인자 산출", Journal of Nuclear Fuel Cycle and Waste Technology, 4(4), pp.385~391 (2006), 한국방사성폐기물학회
- TLG Services, Inc, "Decommissioning Cost Analysis for the Zion Nuclear Station", pp.2~ (2007)
- Ministry of Trade, Industry and Energy, "Ministry of Trade, Industry and Energy Notice No. 2021-137, Standards for compensation for engineering projects", ~
- LaGuardia TS, "Guidelines for producing commercial nuclear power plant decommissioning cost estimates", pp.5-9~5-13 (1986)
- TLG Services, Inc, "Decommissioning Cost Analysis for the Monticello Nuclear Station", pp.2~ (2014)
- LG Services, Inc, "Decommissioning Cost Analysis for the Vermont Yankee Nuclear Station", pp.2~ (2007)
- TLG Services, Inc, "Decommissioning Cost Analysis for the Crystal River Unit 3 Nuclear Station", pp.2~ (2018)
- TLG Services, Inc, "Decommissioning Cost Analysis for the Oconee Nuclear Station", pp.2~ (2013)
- TLG Services, Inc, "Decommissioning Cost Study for the Point Lepreau Generation Station", pp.2~ (2010)
- Hansson T, "An assessment of the decommissioning cost for the Ringhals site", pp.25~ (2013)
- Cost Estimating for Decommissioning Nuclear Reactors in Sweden, "LaGuardia TS", 22~, pp.Report No. 2014:01 (2013)
- "Engineering Total Information System"[URL]
- Korea Institute of Civil Engineering and Building Technology, "2020 Construction Standard Estimating System (civil engineering, construction, mechanical equipment)", pp.76~77 (2020)
- Kim JH, "Development of safety analysis methodology for moderator system failure of CANDU-6 reactor by thermal-hydraulics", physics coupling, 2013, pp.263, 241~254
- ENEA, "mplementation of a cross sections evaluation methodology for safety margin analysis: application to gadolinium odd isotopes", pp.5~ (2016)
- IAEA, "Assessment and management of ageing of major nuclear power plant components important to safety: CANDU pressure tubes", pp.11~ (1998)