The purpose of this study is to develop a risk breakdown structure by deriving structural and job risks that may occur during the dismantling of radiated concrete structures in nuclear power plants. In order to achieve the purpose, the similarity between nuclear power plant dismantling and construction demolition work was analyzed, and a work breakdown structure was established to derive risk factors for each cutting work type and structural and job risks based on expert interviews. As a result, this study developed a practical risk breakdown structure that can be used when dismantling nuclear power plants.

Abstract

The purpose of this study is to develop a risk breakdown structure by deriving structural and job risks that may occur during the dismantling of radiated concrete structures in nuclear power plants. In order to achieve the purpose, the similarity between nuclear power plant dismantling and construction demolition work was analyzed, and a work breakdown structure was established to derive risk factors for each cutting work type and structural and job risks based on expert interviews. As a result, this study developed a practical risk breakdown structure that can be used when dismantling nuclear power plants.

참고문헌 (13)

  1. 안상현, "건설사업의 리스크 식별에 관한 사례연구", 한국건설관리학회 논문집, 16(1), pp.15~23 (2015), 한국건설관리학회[DOI]
  2. 김별, "원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적", 작업 리스크를 중심으로, 2018, pp.22(3), 38~45[DOI]
  3. H.S.Moon, "Developing risk breakdown structure for nuclear power plant decommissioning projects in Korea focusing on radioactive concrete dismantle", International Journal of Sustainable Building Technology and Urban Development, pp.269~280 (2020)
  4. Status of the Decommissioning of Nuclear Facilities around the World, "IAEA", ~ (2004)
  5. Decommissioning of Facilities using Radioactive Material, "IAEA", IAEA, 1~, pp.IAEA Safety Requirement WS-R-5 (2006)
  6. Safety Assessment for Decommissioning, "IAEA", IAEA, ~, pp.IAEA Safety Reports Series No.77 (2013)
  7. Annual Research Report on Technological Development of Experimental Dismantling Test for Activated Concrete Structures in N.P.P, "Korean Institute of Energy Technology Evaluation and Planning(KETEP)", KETEP, ~ (2019)
  8. Research Report on the Development of a Risk Factor Profile for Construction Works, Korea, "Ministry of Land, Infrastructure and Transport", 1~241 (2014)
  9. A Guide to the Project Management Body of Knowledge(PMBOK® guide), 5th edition, Project Management, "Project Management Institute(PMI)", Project Management Institute, ~ (2013)
  10. Construction Risk Management, "S, K.", Kimoondang Project Management Institute, ~ (2010)
  11. 홍성욱, "국내 건설기업의 리스크 관리의 실태분석 및 개선방향에 관한 연구", 대한건축학회논문집 구조계, 19(5), pp.153~160 (2003), 대한건축학회
  12. Song, J. S., "Korea Energy Economics Institute", World Nuclear Power Market Insight, 9, pp.7~8 (2017)
  13. Wan, I. J., "Development of Work Breakdown Structure for Decommissioning Project of Korean Nuclear Power Plant", Journal of nuclear fuel cycle and waste technology, pp.305~306 (2014)

관련 논문AI추천

이 간행물의 다른 논문 (8건)