국내 고정식 해상풍력발전단지의 LCOE의 범위 추정과 비용구성요소 분석

Estimation of LCOE Ranges and Analysis of Cost Components for Korean Fixed-Bottom Offshore Wind Farms

2

조회

0

다운로드

2

인용

0

참고문헌

키워드

주제분류기타공학

초록

The levelized cost of energy (LCOE) was estimated for Korean fixed-bottom offshore windfarms. The actual financial data of the two offshore wind farms were collected from the DataAnalysis, Retrieval and Transfer System (DART) of the Korean Financial Supervisory Serviceand categorized to calculate capital expenditure (CapEx) and operational expenditure (OpEx). The CapExs of the three offshore wind farms in the planning stage were added to those of thetwo actual wind farms. A capacity factor (CF) of 30% was assumed for this study, and adiscount rate of 4.5% was used, which is the Korean social discount rate. Two cases wereconsidered for estimating the LCOE using the actual OpEx data of the two Korean offshorewind farms (Case 1) and the ratio of OpEx to CapEx of the world (Case 2). A Monte Carlosimulation (MCS) was performed to estimate the LCOEs, because the financial data were notsufficient to compute the real data. CapEx, OpEx, and the ratio were extracted as randomnumbers for MCS. To clarify the features of the cost components of offshore wind farms, theLCOE was divided into levelized fixed costs (LFC) and levelized variable costs (LVC). Consequently, the LCOEs for Cases 1 and 2 are 189 and 193 USD/MWh, respectively. TheLVC for the two cases were 65 and 57 USD/MWh, respectively. The LCOE of Korean offshorewind farms was higher than that worldwide, except for that of Japan.

Abstract

The levelized cost of energy (LCOE) was estimated for Korean fixed-bottom offshore windfarms. The actual financial data of the two offshore wind farms were collected from the DataAnalysis, Retrieval and Transfer System (DART) of the Korean Financial Supervisory Serviceand categorized to calculate capital expenditure (CapEx) and operational expenditure (OpEx). The CapExs of the three offshore wind farms in the planning stage were added to those of thetwo actual wind farms. A capacity factor (CF) of 30% was assumed for this study, and adiscount rate of 4.5% was used, which is the Korean social discount rate. Two cases wereconsidered for estimating the LCOE using the actual OpEx data of the two Korean offshorewind farms (Case 1) and the ratio of OpEx to CapEx of the world (Case 2). A Monte Carlosimulation (MCS) was performed to estimate the LCOEs, because the financial data were notsufficient to compute the real data. CapEx, OpEx, and the ratio were extracted as randomnumbers for MCS. To clarify the features of the cost components of offshore wind farms, theLCOE was divided into levelized fixed costs (LFC) and levelized variable costs (LVC). Consequently, the LCOEs for Cases 1 and 2 are 189 and 193 USD/MWh, respectively. TheLVC for the two cases were 65 and 57 USD/MWh, respectively. The LCOE of Korean offshorewind farms was higher than that worldwide, except for that of Japan.

참고문헌 (19)

  1. The 10th Basic Plan of Long-Term Electricity Supply and Demand, "Ministry of Trade, Industry and Energy", ~ (2023)
  2. Renewable Energy 3020 Implementation Plan, "Ministry of Trade, Industry and Energy", ~ (2017)
  3. The 5th Basic plan on New and Renewable Energy, "Ministry of Trade, Industry and Energy", ~ (2020)
  4. "2018", ~
  5. 고경호, "신재생 에너지와 기존 발전기술과의 투자리스크 요인별 민감도 비교", 신재생에너지, 7(4), pp.10~17 (2011), 한국신·재생에너지학회
  6. "Financial Supervisory Service DART"[URL]
  7. 이건우, "사회적 할인율을 고려한 국내육상풍력발전 단지의 LCOE 분석", 한국태양에너지학회 논문집, 40(1), pp.1~13 (2020), 한국태양에너지학회[DOI]
  8. Jongmin Lee, "Is Zero Subsidy in Fixed-Bottom Offshore Wind Farms Feasible? The Case of Incheon, South Korea", Wind, 2(2), pp.210~220 (2022), MDPI AG[DOI]
  9. 이준영, "국내 동해지역 20 MW급 초대용량 풍력발전시스템 사전 경제성 분석", 풍력에너지저널, 13(4), pp.50~57 (2022), 한국풍력에너지학회[DOI]
  10. 팜티큔마이, "Prospects and Economics of Offshore Wind Turbine Systems", 한국해양공학회지, 35(5), pp.382~392 (2021), 한국해양공학회[DOI]
  11. Accelerating South Korean Offshore Wind Through Partnerships: A Scenario-Based Study of Supply Chain, "AEGIR", Levelized Cost of Energy and Employment Effects, ~ (2021)
  12. Renewable Power Generation Costs in 2021, "IRENA", International Renewable Energy Agency, ~ (2022)
  13. IEA, "Projected Costs of Generating Electricity-2020Edition" (2020)
  14. 2020 Cost of Wind Energy Review, No. NREL, "TP-5000-81209", Stehly, T., 2021
  15. Establishment and Operation of Mid- to Long-term Levelized Cost of Energy(LCOE) Forecast System to Expand Renewable Energy Supply (2, "5)", Korea Energy Economics Institute, 2022
  16. Nathaniel Heck, "A Monte Carlo approach to integrating uncertainty into the levelized cost of electricity", The Electricity Journal, 29(3), pp.21~30 (2016), Elsevier BV[DOI]
  17. Alsubal, S., "Life Cycle Cost Assessment of Offshore Wind Farm : Kudat Malaysia Case", Sustainability, 13(14), pp.7943~ (2021)[DOI]
  18. Jonathan Bosch, "Global levelised cost of electricity from offshore wind", Energy, 189, pp.116357~ (2019), Elsevier BV[DOI]
  19. C. Maienza, "A life cycle cost model for floating offshore wind farms", Applied Energy, 266, pp.114716~ (2020), Elsevier BV[DOI]

관련 논문AI추천

이 간행물의 다른 논문 (6건)