본문 바로가기
KERD
논문KCI 등재

반도체 설비의 효율성 제고를 위한 설비 할당 스케줄링 규칙에 관한 연구

A Study on Deterministic Utilization of Facilities for Allocation in the Semiconductor Manufacturing

1

조회

0

다운로드

6

인용

0

참고문헌

키워드

주제분류산업공학

초록

Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.

Abstract

Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.

참고문헌 (17)

  1. Carrasco, J., "Mixed Integer Programming Applied to Atepper Scheduling", Proceedings of the International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, pp.62~66 (1999)
  2. Chang, S., "Heuristic PAC Model from Hybrid MTO and MTS Production Environment", International Journal of Production Economics, 85, pp.347~358 (2003)
  3. 최성우, "반도체 포토공정에서 총 가중작업흐름시간을 최소화하기 위한 스케쥴링 방법론에 관한 연구", 산업경영시스템학회지, 35(1), pp.79~86 (2012), 한국산업경영시스템학회
  4. Glassey, C. R., "A Scheduling Rule for Job Release in Demiconductor Fabrication", Operations Research Letters, 7, pp.213~217 (1998)
  5. Glassey, C.R., "Closed-loop Job Release Control for VLSI Circuit Manufacturing", IEEE Transactions on Semiconductor Manufacturing, 1(1), pp.36~46 (1998)
  6. Kang, K. H., "Make-to-order Scheduling in Foundry Semiconductor Fabrication", International Journal of Production Research, 45(3), pp.615~630 (2007)
  7. 김창현, "연속적인 감시하에 있는 생산시스템의 최적 생산량 결정", 대한설비관리학회지, 18(1), pp.19~26 (2013), 대한설비관리학회
  8. Kim, S., "Shift Scheduling for Stepper in the Semiconductor Wafer Fabrication Process", IIE Transactions, 34, pp.167~177 (2002)
  9. Kim, S. H., "Simulation-Based Optimal Production Planning Model Using Dynamic Lead Time Estimation", International Journal of Advanced Manufacturing Technology, 75, pp.1381~1391 (2014)
  10. Leachman R. C., "SLIM : Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics", Interfaces, 32, pp.61~77 (2002)
  11. Lee, Y. H., "Daily Stepper Scheduling Rule in the Semiconductor Manufacturing for MTO Products", International Journal of Advanced Manufacturing Technology, 54(1-4), pp.323~336 (2011)
  12. Lee, Y. H., "Manufacturing Cycle Time Reduction Using Balance Control in the Semiconductor Fabrication Line", Production Planning and Control, 13, pp.529~540 (2001)
  13. Lee, Y. H., "Scheduling Simulator for Semiconductor Fabrication Line", IE Interfaces, 12, pp.437~447 (1999)
  14. Lee, Y. H., "Experimental Study on Input and Bttleneck Scheduling for the Semiconductor Fabrication line", IIE Transactions, 34(2), pp.179~190 (2001)
  15. Sigrid L. N., "Optimal and Heuristic Solutions for a Scheduling Problem Arising in an Foundry", Computer and Operations Research, 32, pp.2351~2382 (2005)
  16. Spearman, M. L., "CONWIP : A Pull Alternative to Kanban", International Journal of Prouction Research, 28(5), pp.879~894 (1990)
  17. Wein, L. M., "Shceduing Semiconductor Wafer Fabrication", IEEE Transactions on Semiconductor Manufacturing, 1(3), pp.115~129 (1998)

관련 논문AI추천

이 간행물의 다른 논문 (18건)