RPS제도가 PF방식 LNG복합발전프로젝트의 사업성에 미치는 영향

Impact of Renewable Portfolio Standard System on the Feasibility of LNG Combined-cycle Power Projects based on Project Finance

0

조회

0

다운로드

5

인용

0

참고문헌

키워드

초록

This study was to investigate to what extent RPS system affected the feasibility of LNG combined-cycle power project based on the PF. As a result, this study found out that the reflection of present carrying charge was applied as degradation factors offeasibility to such an extent that the business promotion became acutely difficult. It was reviewed as the secure strategy of REC through the self-construction of renewable energy facility had a good influence on the feasibility with a positive countermeasure than REC purchase on the spot market or strategy of postponed fulfillment. To conclude, this study has suggested a method of reflecting the implementation capacity by transfer year of RPS from 2.0% in consecutive order. This researcher sees that it can reduce the excessive obligation burden on the power producers and can induce even investment on the renewable energy business in a long-term view rather than the investment on the specific facility to perform a duty in a short-term view.

Abstract

This study was to investigate to what extent RPS system affected the feasibility of LNG combined-cycle power project based on the PF. As a result, this study found out that the reflection of present carrying charge was applied as degradation factors offeasibility to such an extent that the business promotion became acutely difficult. It was reviewed as the secure strategy of REC through the self-construction of renewable energy facility had a good influence on the feasibility with a positive countermeasure than REC purchase on the spot market or strategy of postponed fulfillment. To conclude, this study has suggested a method of reflecting the implementation capacity by transfer year of RPS from 2.0% in consecutive order. This researcher sees that it can reduce the excessive obligation burden on the power producers and can induce even investment on the renewable energy business in a long-term view rather than the investment on the specific facility to perform a duty in a short-term view.

참고문헌 (14)

  1. 최효섭, "민간의 발전사업 참여가 전력시장에 미치는 영향에 관한 연구 : 우리나라 전력시장을 중심으로", 석사, 공기업정책학과, pp.2013
  2. "전력시장운영규칙", 한국전력거래소, ~ (2014)
  3. "민간발전사들 수익구조 악화심각", 전기신문, ~ (2014)
  4. 이창호, "신재생에너지 활성화를 위한 RPS・REC 수익전략과 RHO・RFS 신사업 설계 세미나 자료", 산업교육연구소, ~ (2015)
  5. "신재생에너지 정책심의회 개최 보도자료", 산업통상자원부, ~ (2014)
  6. 이용범, "RPS 제도 개정과 사업환경변화", 한국신용평가 PF Research, 8~ (2014)
  7. 황순현, "신재생에너지 의무할당제(RPS)시행에 따른 REC 가격 예측에 관한 연구", 2012년도 대한전기학회 하계학술대회 논문집, pp.18~20 (2012)
  8. 신재생에너지 의무할당제(RPS)국내운영방안 수립, "한국전기연구원", 191~ (2009)
  9. 산업자원부 제2차 전력수급기본계획, , 18~
  10. "에너지관리공단 신재생에너지센터 RPS, RPA 통합관리시스템", ~
  11. "RPS ‘12년 의무이행비용 정산 기준가격 확정 산업통상자원부 보도자료", ~ (2013)
  12. 서인천발전본부 구내 연료전지 건설타당성 조사용역 보고서, , 한국서부발전, ~ (2013)
  13. "발전, 민간에게 허용된 짧은 기회", 농협증권, ~ (2012)
  14. 발전부문 배출권거래제 이행비용 전가 및 대응방안 연구, , 민간발전협회, ~ (2014)

관련 논문AI추천

이 간행물의 다른 논문 (5건)