Factors Affecting Delayed Implementation of Railway Station Projects: Case Studies in Indonesia
2
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
Purpose: This research aims to identify risk indicators of delays in critical scheduling activities of a railway station construction project from the service provider's perspective. It aims to help prepare and respond to potential delays, ensuring project success and boosting economic growth and national connectivity in Indonesia. Design/methodology/approach: A literature study was conducted to identify variable risk information on project delays in a railway station project. Expert validation was done using Delphi methods or structured interviews. Focus group discussion (FGD) was used to identify the most dominant risks in each critical scheduling activity. The study revealed 51 risk variables influencing project delays, with 22 dominant risks identified in a case study project. FGD surveys were conducted on each critical activity, and data from five experts was evaluated using descriptive techniques and elimination techniques to determine the most influential risk. The results were that there were 9 critical activities and 6 most dominant risks. Findings: The study reveals that delays in completing the railway station project are primarily due to issues with issuing permits, which is the most significant risk factor for the three critical activities. Other risks include working on the active track, adjusting train operation patterns, dependencies between phases and work packages, long decision- making processes by the project owner, and complicated construction authorization procedures. Research limitations/implications: Further comprehensive investigation is required to ascertain the impact of project risk assessment on the expenses and caliber of additional railway projects, in addition to projects with broader scopes like other transportation construction projects. Originality/value: This study analyzes and identifies the most dominant risks to critical activities of railway station projects, and investigates their impact on project completion time optimization.
Abstract
Purpose: This research aims to identify risk indicators of delays in critical scheduling activities of a railway station construction project from the service provider's perspective. It aims to help prepare and respond to potential delays, ensuring project success and boosting economic growth and national connectivity in Indonesia. Design/methodology/approach: A literature study was conducted to identify variable risk information on project delays in a railway station project. Expert validation was done using Delphi methods or structured interviews. Focus group discussion (FGD) was used to identify the most dominant risks in each critical scheduling activity. The study revealed 51 risk variables influencing project delays, with 22 dominant risks identified in a case study project. FGD surveys were conducted on each critical activity, and data from five experts was evaluated using descriptive techniques and elimination techniques to determine the most influential risk. The results were that there were 9 critical activities and 6 most dominant risks. Findings: The study reveals that delays in completing the railway station project are primarily due to issues with issuing permits, which is the most significant risk factor for the three critical activities. Other risks include working on the active track, adjusting train operation patterns, dependencies between phases and work packages, long decision- making processes by the project owner, and complicated construction authorization procedures. Research limitations/implications: Further comprehensive investigation is required to ascertain the impact of project risk assessment on the expenses and caliber of additional railway projects, in addition to projects with broader scopes like other transportation construction projects. Originality/value: This study analyzes and identifies the most dominant risks to critical activities of railway station projects, and investigates their impact on project completion time optimization.
참고문헌 (69)
- Abadie, R., "Correcting the course of capital projects plan ahead to avoid time and cost overruns down the road" (2013), PWC network
- Abdou, A. H., "Boosting the organizational performance : Ethical climate as a moderator for optimizing risk management practices in the Saudi public sector", Global Business & Finance Review, 29(3), pp.42~56 (2024)[DOI]
- Adam, A., "Implications of cost overruns and time delays on major public construction projects", Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate, pp.747~758 (2015)
- Alifen, S., "Analisa what if sebagai metode antisipasi keterlambatan durasi proyek", Civil Engineering Dimension, 1(2), pp.103~113 (1999)
- Andrić, J., "Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: A case study of belt and road projects", Sustainability, 11(5) (2019)
- Aswathi, R., "Development of a delay analysis system for a railway construction project", International Journal of Innovative Research in Science, Engineering and Technology, 2(1), pp.531~541 (2013)
- "Jumlah Penumpang berdasarkan Moda Transportasi Kereta Api - Tabel Statistik - Badan Pusat Statistik Indonesia" (2024)[URL]
- Chapman, R., "The rules of project risk management:Implementation guidelines for major projects" (2014), Routledge
- Chapman, R. J., "The controlling influences on effective risk identification and assessment for construction design management", International Journal of Project Management, 19(3), pp.147~160 (2001)
- Chen, L., "A Bayesian-driven Monte Carlo approach for managing construction schedule risks of infrastructures under uncertainty", Expert Systems with Applications, 212, pp.118810~ (2023)
- Danisworo, B., "Estimation model of Jakarta MRT phase 1 project cost overrun for the risk-based next phase project funding purpose", IOP Conference Series: Earth and Environmental Science, 258(1), pp.012049~ (2019), IOP Publishing
- Das, S., "Applicability of risk assessment tools and techniques for a construction project", Journal of Research in Infrastructure Designing, 4(3), pp.1~18 (2021)
- Dedi Hermawan, D. H., "Critical risk factors associated with schedule delays in gas processing facility projects : Case study in Indonesia", Global Business and Finance Review, 29(6), pp.60~73 (2024)[DOI]
- "Ditjen Perkeretaapian" (2023)[URL]
- Elawi, G., "Owners' perspective of factors contributing to project delay: Case studies of road and bridge projects in Saudi Arabia", Procedia Engineering, 145, pp.1402~1402 (2016)
- Febrianti, D., "The critical path method in construction project rescheduling", IOP Conference Series: Earth and Environmental Science, 832(1), pp.012009~ (2021), IOP Publishing
- Fentahun Kassa, Y., "Determinants of infrastructure project delays and cost escalations: The cases of federal road and railway construction projects in Ethiopia", Technology, and Sciences (ASRJETS) American Scientific Research Journal for Engineering, 63(1), pp.102~136 (2020)
- Flyvbjerg, B., "Survival of the unfittest: why the worst infrastructure gets built and what we can do about it", Oxford Review of Economic Policy, 25(3), pp.344~367 (2009)
- Flyvbjerg, B., "Megaprojects and risk: An anatomy of ambition" (2003), Cambridge University Press
- Flyvbjerg, B., "Megaprojects and risk: An anatomy of ambition" (2003), Cambridge University Press
- Galloway, P. D., "Survey of the construction industry relative to the use of CPM scheduling for construction projects", Journal of Construction Engineering and Management, 132(7), pp.697~711 (2006)[DOI]
- Gashaw, T., "Developing a fuzzy synthetic evaluation model for risk assessment : A case of Addis-Djibouti railway construction project", Innovative Infrastructure Solutions, 7(2) (2022)[DOI]
- Gashaw, T., "Developing a fuzzy synthetic evaluation model for risk assessment : A case of Addis-Djibouti railway construction project", Innovative Infrastructure Solutions, 7(2), pp.1~15 (2022)[DOI]
- Gashaw, T., "Developing a fuzzy synthetic evaluation model for risk assessment : A case of Addis-Djibouti railway construction project", Innovative Infrastructure Solutions, 7(2), pp.1~15 (2022)[DOI]
- Gebrehiwet, T., "Analysis of delay impact on construction project based on RII and correlation coefficient:Empirical study", Procedia Engineering, 196, pp.366~377 (2017)
- Gündüz, M., "Quantification of delay factors using the relative importance index method for construction projects in Turkey", Journal of Management in Engineering, 29(2), pp.133~139 (2013)[DOI]
- Hamzaoui, F., "Evolutive Risk Breakdown Structure for managing construction project risks : Application to a railway project in Algeria", European Journal of Environmental and Civil Engineering, 19(2), pp.238~262 (2015)[DOI]
- Han, S. H., "Analyzing schedule delay of the mega project : Lessons learned from Korea train express", IEEE Transactions on Engineering Management, 56(2), pp.243~256 (2009)[DOI]
- Hartonol, B. D., "Penilaian Risiko Pelaksanaan Proyek Light Rail Transit (LRT) Jabodebek" (2018), Trisakti University Collection of Scholarly and Academic Pa
- Hegazy, T., "Critical path segments scheduling technique", Journal of Construction Engineering and Management, 136(10), pp.1078~1085 (2010)[DOI]
- Hong, N. T. H., "The effects of enterprise risk management on the performance and risk of Vietnamese listed firms : Evidence from abnormal enterprise risk management index", Global Business and Finance Review, 28(5), pp.122~136 (2023)[DOI]
- Jang, Y. J., "Building restaurant customers' trust amidst Covid-19 crisis through value-and performance-based information : Risk perception as a moderator", Global Business and Finance Review, 26(3), pp.111~123 (2021)[DOI]
- Jati, D. B., "Development of risk-based standardized Work Breakdown Structure (WBS) to improve time performance on high-speed railway construction projects", IOP Conference Series: Materials Science and Engineering, 930(1), pp.012065~ (2020), IOP Publishing
- Jati, D. B., "Development of risk-based standardized Work Breakdown Structure(WBS)to improve time performance on high-speed railway construction projects", IOP Conference Series: Materials Science and Engineering, 930(1) (2020)
- "Tren Volume Pengguna Naik 2%, Pengguna Harian KRL Jabodetabek Tembus 655 Ribu Lebih Orang" (2024)[URL]
- Karabulut, M., "Application of Monte Carlo simulation and PERT", CPM techniques in the planning of construction projects : A case study, 2017, pp.5(3), 408~420
- "Pembangunan Stasiun Manggarai Baru Untuk Layanan Publik Lebih Baik Kementerian Perhubung an Republik Indonesia" (2021)[URL]
- "Peraturan Presiden Perpres 109 tahun 2020" (2020)[URL]
- Khan, R., "Assessment of delay factors in Saudi Arabia railway", metro construction projects, 2020, pp.11(2), 225~233
- "Ini Alasan Stasiun Manggarai Dijadikan Stasiun Sentral pada 2023" (2022)[URL]
- Koulinas, G. K., "Schedule delay risk analysis in construction projects with a simulation-based expert system", Buildings, 10(8), pp.134~ (2020)[DOI]
- Kumar, R., "Research methodology : A step-by-step guide for beginners (", pp.4~41 (2010), SAGE Publications
- Leśniak, A., "Risk assessment of additional works in railway construction investments using the Bayes network", Sustainability, 11(19), pp.5388~ (2019), MDPI[DOI]
- Liberatore, M. J., "Project management in construction : Software use and research directions", Journal of Construction Engineering and Management, 127(2), pp.101~107 (2001)[DOI]
- Macura, D., "Risk analysis model with interval type-2 fuzzy FMEA-A case study of railway infrastructure projects in the Republic of Serbia", Acta Polytechnica Hungarica, 19(3), pp.2022~2103 (2022)[DOI]
- "Revitalisasi Stasiun Manggarai Jadi Stasiun Terbesar di Indonesia Tinggal 40" (2022)[URL]
- Mittal, Y., "Identification of critical factors for delay in metro rail projects in India", International Journal of Students' Research in Technology Management, 6(1), pp.30~39 (2018)[DOI]
- Munang, A., "Evaluasi dan Perencanaan Mitigasi Resiko Proyek Pembangunan Jalur Ganda Kereta Api Semarang-Bojonegoro", Teknoin, 22(2) (2016)
- Nikjow, M. A., "Triggers of delays in international projects using engineering procurement and construction delivery methods in the belt and road initiative : Case study of a high-speed railway projects", Sustainability, 13(17), pp.9503~ (2021)[DOI]
- Nikjow, M. A., "Triggers of delays in international projects using engineering procurement and construction delivery methods in the belt and road initiative : A case study of high-speed railway projects", Sustainability (Switzerland), 13(17) (2021)[DOI]
- Oh, K., "Effects of working capital management on small and medium-sized enterprises'profitability from the continue ity of supply chain relationships", Global Business and Finance Review, 28(5), pp.51~66 (2023)[DOI]
- Patil, M., "Risk management in railway projects", International Research Journal of Engineering and Technology, 4(6), pp.1811~1817 (2017)[DOI]
- Paz, J. C., "A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks", Construction Economics and Building, 18(2), pp.41~69 (2018)[DOI]
- "Foundational Standards. PMBOK Guide" (2017)[URL]
- Prihantoro, A., "Evaluasi faktor-faktor penyebab keterlambatan pekerjaan(studi kasus : Pembangunan jalur kereta api bandara new yogyakarta international KM. 1+ 435 S", D KM. 3+ 142), 2022, pp.1(2), 26~31
- Ramli, M. Z., "Ranking of railway construction project delay factors in Malaysia by using relative importance index(RII)", AIP Conference Proceedings, 2339(1) (2021)
- Sahrial, S., "Analisis Faktor-Faktor yang Mempengaruhi Keterlambatan Proyek Peningkatan Jalan Rel Kereta Api Medan-Binjai", Jurnalmahasiswa. Uma. Ac. Id, 1(1), pp.13~24 (2022)[DOI]
- Sharma, M. K., "Monte Carlo Simulation applications for construction project management", International Journal of Civil Engineering and Technology, 11(2), pp.88~100 (2020)[DOI]
- Shrivastava, R., "Critical risk factors causing the time and cost overruns of Indian railway projects in India", Journal of Engineering and Advanced Technology(IJEAT), 9(1), pp.5395~5401 (2019)[DOI]
- Smith, N., "Managing risk in construction projects", ~ (2014)
- Steininger, B. I., "Cost overruns and delays in infrastructure projects : The case of Stuttgart 21", Journal of Property Investment and Finance, 39(3), pp.256~282 (2021)[DOI]
- Sufren, Y., "Belajar Otodidak SPSS Pasti Bisa" (2014), Elex Media Komputindo
- Sugiyono, "Metode Penelitian kuantitatif, kualitatif dan R & D" (2014), Alfabeta
- "Upaya Peningkatan Daya Saing Indonesia Melalui Pembangunan Infrastruktur Berkelanjutan" (2022)[URL]
- Tavassolirizi, M., "Factors affecting delays in rail transportation projects using Analytic Network Process : the case of Iran", International Journal of Construction Management, 22(14), pp.2712~2723 (2022)[DOI]
- Widiyanti, A., "Public value Penggunaan Transportasi Umum Kai Commuter Line Jabodetabek Di Stasiun Manggarai", Journal of Public Policy and Management Review, 13(3), pp.1059~1079 (2024)
- Yurianto, Y., "Identifikasi Faktor-Faktor Yang Mempengaruhi Keterlambatan Proyek Infrastruktur Kereta Cepat Jakarta-Bandung", Indonesian Journal of Construction Engineering and Sustainable Development (Cesd), 3(1), pp.35~41 (2020)
- Zakiyya, A., "Pembangunan Infrastruktur di Indonesia dalam Kerja Sama Indonesia-Tiongkok tahun 2010-2018", Padjadjaran Journal of International Relations, 4(2), pp.92~108 (2018)
- Zhang, D., "Causes of delay in the construction projects of subway tunnel", Advances in Civil Engineering, 2020(1), pp.8883683~ (2020)[DOI]