건축턴키 공사 입찰 · 계약 단계에서의 클레임 예방을위한 클레임요인 분석 및 대응방안에 관한 연구
A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim inBidding and Contracting Stage for Architectural Turn-Key Project
0
조회
0
다운로드
2
인용
0
참고문헌
키워드
초록
Abstract
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
참고문헌 (9)
- "건설관련 계약서류 선진화 방안"" (1996)
- "건설산업기본법령집" (2000)
- "상거래분쟁과 상사중재" (2000)
- "클레임 사례분석을 통한 설계ㆍ시공 일괄입찰 공사 계약조건의 개선", 19(1) (1999)
- "건설 계약관리와 클레임 해결" (2001), 연세대학교 출판부
- "협상을 감안한 건설분쟁해결제도의 발전방안" (2002), 한국건설관리학회
- "건설공사 계약관리와 클레임" (1998), 건설산업연구원
- "Are Contract Disputes Predictable?" (1995), ASCE.
- "Structural Equation Model of Construction Contract Dispute Potential" (2000), ASCE.
