프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구
A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project
0
조회
0
다운로드
3
인용
0
참고문헌
초록
Abstract
Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.
참고문헌 (15)
- "건설관련 계약서류 선진화 방안" (1996)
- "건설산업기본법령집" (2000)
- "상거래분쟁과 상사중재" (2000)
- "동시발생 공기지연을 포함한 건설공사 공기지연 클레임의 분석방법", 18(1) (1998)
- "건설경영공학" (2003)
- "건설 클레임으로 인한 계약 금액조정에 관한 연구" (2000)
- "건설클레임론" (1997), 대한건설협회
- "건설계약관리와 클레임 해결" (2001), 연세대학교 출판부
- "협상을 감안한 건설분쟁해결제도의 발전방안" (2002), 한국건 설관리학회
- "이 재 섭 95 건설공사 공기지연 클레임 분석모형의 구축방안에 관한 연구" (1995)
- "계약클레임론" (2003), C&R 연구소
- "건설공사 계약관리와 클레임" (1998), 건설산업연구원
- "Are Contract Disputes Predictable?" (1995), ASCE.
- "Management's Perception of key Performance Indicators for Construction" (2003), ASCE.
- "Model for Predicting Performance of Architects and engineers" (2002), ASCE.