건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구- 턴키공사 사례 중심으로 -
A Study on Analyzing Effect of Claim Factor to Prevent Claim in Early Stage for Construction Project
0
조회
0
다운로드
1
인용
0
참고문헌
초록
Abstract
In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.
참고문헌 (8)
- "건설경영공학" (2003), 기문당
- "건설 계약관리와 클레임 해결" (2001), 연세대학교 출판부
- "건설산업 기본법령집", 건설산업 기본법령 (2000), 대한건설협회
- "상거래 분쟁과 상사중재" (2000)
- "클레임 사례분석을 통한 설계시공 일괄입찰공사 계약조건의 개선", 191(1) (1999)
- "협상을 감안한 건설분쟁해결제도의 발전방안" (2002)
- "Predicting Construction Contractor Failure Prior to Construct Award" (1992)
- "Generic Methodology for Analyzing Delay Claims" (1999)