해외건설 프로젝트 리스크 요인도출 및 지역별 인식차이 분석연구

Regional Differences in Construction Project Risk Perception: A Comprehensive Analysis of Major Risk Factors

2

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류공학일반

초록

Recently, the construction market has become increasingly uncertain due to such as COVID-19 and low interest rates. There is a growing need for the capability to identify risk factors that can affect the feasibility of construction projects in the early stages and to develop strategic management approaches. Particularly, as the importance of managing risks varies depending on the specific conditions and situations at the construction site, it is crucial to establish a risk management plan that reflects the uniqueness of the site during the initial phase of a projects. In this study, a classification system for key risk factors that can be considered in the process of overseas plant construction was established through a literature review. Risk assessments were conducted through surveys of construction experts in the Middle East, Asia, and the Arctic region. The results of the importance assessments revealed regional differences in the significance of the same risk factors. The findings of this study emphasize the need to derive risk factors considering the specificity of construction sites in the early stages of project execution and to build strategic management approaches accordingly.

Abstract

Recently, the construction market has become increasingly uncertain due to such as COVID-19 and low interest rates. There is a growing need for the capability to identify risk factors that can affect the feasibility of construction projects in the early stages and to develop strategic management approaches. Particularly, as the importance of managing risks varies depending on the specific conditions and situations at the construction site, it is crucial to establish a risk management plan that reflects the uniqueness of the site during the initial phase of a projects. In this study, a classification system for key risk factors that can be considered in the process of overseas plant construction was established through a literature review. Risk assessments were conducted through surveys of construction experts in the Middle East, Asia, and the Arctic region. The results of the importance assessments revealed regional differences in the significance of the same risk factors. The findings of this study emphasize the need to derive risk factors considering the specificity of construction sites in the early stages of project execution and to build strategic management approaches accordingly.

참고문헌 (19)

  1. 최기훈, "해외건설의 리스크요인이 사업성과에 미치는 영향분석 : 공사비용, 공사기간, 공사품질에 미치는 영향을 중심으로", 석사, 건축공학과, pp.2012
  2. Pinto, J. K, "The Causes of Project Failure", IEEE Transactions on Engineering Management, 37(4), pp.269~270 (1990)
  3. Thamhain, H. J., "Resource Estimating for Technology-Intensive Projects", AACEInternational Transactions, 2, pp.4~ (1992)
  4. Zhi, H., "Risk Management for Overseas Construction Projects", international Journal of Project Management, 13(4), pp.231~237 (1995)
  5. Bing, L., "Risk Management in International Construction", ~ (1999)
  6. Hastak Makarand, "ICRAM-1 Model forInternational Construction Risk Assessment", Journal of Managementin Engineering, 16(1), pp.59~69 (2000)
  7. Baloi, D, "Modeling Global Risk Factors Affecting Construction Cost Performance", International Journal of Project Management, 21, pp.261~265 (2003)
  8. 한승헌, "대형건설업체의 해외건설공사포트폴리오 리스크 관리에 관한 연구", 한국건설관리학회논문집, 2(6), pp.68~80 (2001)
  9. 김한힘, "실무적 차원의 해외건설 프로젝트 리스크 관리모델 연구", 석사, 토목공학, pp.2005
  10. 김두연, "해외건설공사의 리스크 분석에 기초한 수익성 예측모델에 관한 연구", 석사, 토목공학, pp.2005
  11. 차희성, "프로젝트 위험 요소가 비용성과에 미치는 영향도 인식 분석을 통한 위험 평가 방법론 개발", ~ (2006)
  12. 배성율, "해외 LNG플랜트 사업타당성 구성요소 도출 및 중요도 분석에 관한 연구", 석사, 시공관리, pp.2010
  13. 박의승, "해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안", 석사, 플랜트엔지니어링, pp.2011
  14. 안병호, "건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 분석", 석사, 초고층장대교량학과 건설관리전공, pp.2013
  15. 현철우, "남아프리카공화국 민자발전사업의EPC 수행 리스크", 석사, pp.2016
  16. 위왕복, "AHP를 활용한 러시아 LNG 액화 플랜트 설계프로젝트의 리스크 분석", 석사, pp.2016
  17. 이경수, "AHP 기법을 활용한 인도 발전사업 리스크 관리모델에관한 연구", 석사, pp.2018
  18. 최상주, "AHP 기법을 활용한 미얀마 독립민자발전사업(IPP)의 리스크관리 모델에 관한 연구", 석사, pp.2020
  19. 정우용, "중소·중견건설기업의 해외하도급사업 리스크관리 성과분석", 한국건설관리학회 논문집, 18(2), pp.71~80 (2017), 한국건설관리학회[DOI]

관련 논문AI추천

이 간행물의 다른 논문 (9건)