SCP-Matrix based shipyard APS design: Application to long-term production plan
2
조회
0
다운로드
3
인용
0
참고문헌
키워드
초록
A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.
Abstract
A shipyard is an Engineer To Order (ETO) company that designs and manufactures new products when orders are placed. Various tasks are concurrently performed, thereby making process management considerably important. It is particularly important to plan and control production activities because production constitutes the largest part of the overall process. Therefore, this study focuses on the development of a production planning system based on an Advanced Planning System (APS). An APS is an integrated planning system that targets supply chain processes in accordance with the principles of hierarchical planning. In this study, a Supply Chain Planning Matrix (SCP-Matrix), which is used as a guideline for APS development, is designed through analysis of shipyard cases. Then, we define the process in detail, starting from long-term production plan as the initial application, and design and implement a long-term production planning system using a component-based development.
참고문헌 (37)
- Adrodegari, F., "Engineer-to-Order (ETO) production planning and control: an empirical framework for machinery-building companies", Prod. Plan. Control, 26(11), pp.910~932 (2015)
- 백명기, "A study for production simulation model generation system based on data model at a shipyard", International Journal of Naval Architecture and Ocean Engineering, 8(5), pp.496~510 (2016), 대한조선학회
- Cho, K. K., "An integrated process planning and scheduling system for block assembly in shipbuilding", CIRP Ann. Manuf. Technol, 47(1), pp.419~422 (1998)
- Choi, H. S., "Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system", J. Intell. Manuf, 8(6), pp.505~515 (1997)
- Ennis, K. J., "Productoriented design and construction cost model", J. Ship Prod, 14(1), pp.41~58 (1998)
- Fast, K. R., "Development of a Shipbuilding Simulation Process Modeling Database", National Shipbuilding Research Program: DTIC Document, ~ (2000)
- Fleischer, M., "Marine supply chain management", J. Ship Prod, 15(4), pp.233~252 (1999)
- Fleischmann, B., "Planning hierarchy, modeling and advanced planning systems", Handb. Oper. Res. Manag. Sci, 11, pp.455~523 (2003)
- Fleischmann, B., "Supply chain Management and Advanced Planning", pp.81~106 (2008), Springer
- Gosling, J., "Engineer-to-order supply chain management: a literature review and research agenda", Int. J. Prod. Econ, 122(2), pp.741~754 (2009)
- Gosling, J., "Principles for the design and operation of engineer-to-order supply chains in the construction sector", Prod. Plan. Control, 26(3), pp.203~218 (2015)
- Hicks, C., "Supply chain management: a strategic issue in engineer to order manufacturing", Int. J. Prod. Econ, 65(2), pp.179~190 (2000)
- Kallestrup, K. B., "Decision support in hierarchical planning systems: the case of procurement planning in oil refining industries", Decis. Support Syst, 68, pp.49~63 (2014)
- Towards a Generic Productoriented Work Breakdown Structure for Shipbuilding, "Koenig, P. C.", The Society of Nav. Architects and Marine Engineers, ~ (1997)
- Kim, H., "Applying digital manufacturing technology to ship production and the maritime environment", Integr. Manuf. Syst, 13(5), pp.295~305 (2002)
- Lee, J. K., "DAS: intelligent scheduling systems for shipbuilding", AI Mag, 16(4), pp.78~94 (1995)
- Meyr, H., "Supply chain Management and Advanced Planning", pp.109~115 (2008), Springer
- Mello, M. H., "Supply chain management in the shipbuilding industry: challenges and perspectives", Proc. Inst. Mech. Eng. Part M J. Eng. Marit. Environ, 225(3), pp.261~270 (2011)
- ProductWork Breakdown Structure, "Okayama, Y.", MARITIME ADMINISTRATION, ~, pp.No. NSRP-SPCSP-2 (1980)
- Olhager, J., "The role of the customer order decoupling point in production and supply chain management", Comput. Ind, 61(9), pp.863~868 (2010)
- Park, K., "Modeling and solving the spatial block scheduling problem in a shipbuilding company", Comput. Ind. Eng, 30(3), pp.357~364 (1996)
- Rahman Abdul Rahim, A., "The need for a new product development framework for engineer-to-order products", Eur. J. Innov. Manag, 6(3), pp.182~196 (2003)
- Rudberg, M., "Centralised supply chain master planning employing advanced planning systems", Prod. Plan. Control, 20(2), pp.158~167 (2009)
- Sanderson, J., "The challenges of supply strategy selection in a project environment: evidence from UK naval shipbuilding", Supply Chain Manag. An Int. J, 13(1), pp.16~25 (2008)
- Sarder, M. B., "Managing material flow at the US shipbuilding industry", International Conference on Industrial Engineering and Operations Management (2010)
- Shin, J. G., "A modeling and simulation of production process in subassembly lines at a shipyard", J. Ship Prod, 20(2), pp.79~83 (2004)
- Sommerville, I., "Software Engineering" (2010), Addison-Wesley
- 송영주, "Research on a simulation-based ship production support system for middle-sized shipbuilding companies", International Journal of Naval Architecture and Ocean Engineering, 1(2), pp.70~77 (2009), 대한조선학회
- Sriram, P. K., "A concept for project manufacturing planning and control for engineer-to-order companies", IFIP International Conference on Advances in Production Management Systems, pp.699~706 (2012), Springer
- Stadtler, H., "Supply chain Management and Advanced Planning" (2008), Springer
- Staeblein, T., "Planning and scheduling in the automotive industry: a comparison of industrial practice at German and Japanese makers", Int. J. Prod. Econ, 162, pp.258~272 (2015)
- Vidoni, M. C., "A systemic approach to define and characterize Advanced Planning Systems (APS)", Comput. Ind. Eng, 90, pp.326~338 (2015)
- Vlachakis, N., "A methodology for analyzing shipyard supply chains and supplier selection", Benchmarking Int. J, 23(2), pp.443~455 (2016)
- Whitehead, K., "Component-based Development: Principles and Planning for Business Systems" (2002), Addison-Wesley
- Woo, J. H., "Development of the decisionmaking system for the ship block logistics based on the simulation", J. Ship Prod. Des, 26(4), pp.290~300 (2010)
- Woo, J. H., "Systematisation of ship production management and case study for ship block assembly factory", Int. J. Comput. Integr. Manuf, 27(4), pp.333~347 (2014)
- Zoryk-Schalla, A. J., "Modeling the planning process in advanced planning systems", Inf. Manag, 42(1), pp.75~87 (2004)