System development for establishing shipyard mid-term production plans using backward process-centric simulation
2
조회
0
다운로드
3
인용
0
참고문헌
키워드
초록
In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a oneyear period.
Abstract
In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a oneyear period.
참고문헌 (20)
- Cho, K. K., "An integrated process planning and scheduling system for block assembly in shipbuilding", CIRP Annal, 47(1), pp.419~422 (1998)
- Jeong, K. Y., "Conceptual frame for development of optimized simulation-based scheduling systems", Expert Syst. Appl, 18(4), pp.299~306 (2000)
- 정용국, "공정 중심 시뮬레이션 모델링 방법론을 이용한 조선소 생산시뮬레이션 시스템: 중일정계획 검증 시뮬레이션모델 구축 사례를 중심으로", 한국CDE학회 논문집, 21(2), pp.204~214 (2016), 한국CDE학회[DOI]
- Kim, H., "A model for a simulation-based shipbuilding system in a shipyard manufacturing process", Int. J. Comput. Integr. Manuf, 18(6), pp.427~441 (2005)
- Koenig, P. C., "Lean production in the Japanese shipbuilding industry", J. Ship Prod, 18(3), pp.167~174 (2002)
- Kutanoglu, E., "Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop", J. Manuf. Syst, 20(4), pp.264~279 (2001)
- Lee, J. K., "Das : Intelligent scheduling systems for shipbuilding", AI Mag, 16(4), pp.78~94 (1995)
- Lee, J. K., "Developing scheduling systems for Daewoo Shipbuilding : DAS project", Eur. J. Oper. Res, 97(2), pp.380~395 (1997)
- Lee, D. K., "Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards", Int. J. Adv. Manuf. Technol, 71(1-4), pp.621~633 (2014)
- Liu, Z., "Aggregate production planning for shipbuilding with variation-inventory trade-offs", Int. J. Prod. Res, 49(20), pp.6249~6272 (2011)
- Lynch, N., "Forward and backward simulations", Inf. Comput, 121(2), pp.214~233 (1995)
- Musselman, K., "Supply chain planning: the role of simulation in advanced planning and scheduling", Proc. 2002 Winter Simul. Conf, pp.1825~1830 (2002)
- SeungHoon Nam, "SCP-Matrix based shipyard APS design: Application to long-term production plan", International Journal of Naval Architecture and Ocean Engineering, 10(6), pp.741~761 (2018), 대한조선학회
- Implementation of PC-Based Project Management in an Integrated Planning Process (The National Shipbuilding Research Program), "Neumann, R. J.", National Steel And Shipbuilding Co, ~, pp.No. NSRP-0340 (1991)
- Park, B. C., "Simulation based planning and scheduling system for TFT-LCD fab", Proc. 2002 Winter Simul. Conf, pp.2271~2276 (2008)
- Seo, J. C., "Backward capacity-filtering for electronics Fabs", Prod. Plann. Contr, 27(11), pp.925~933 (2016)
- cheduling Methods for Ship Build Strategy Development, "Spicknall, M. H.", Literature Search and Research, ~ (1997)
- Watson, E. F., "Order-release planning using variable lead times based on a backward simulation model", Int. J. Prod. Res, 33(10), pp.2867~2888 (1995)
- 우종훈, "디지털 조선소 구축을 위한 물류 모델 프레임워크", 대한조선학회 논문집, 42(2), pp.165~174 (2005), 대한조선학회
- Zhu, D. F., "Intelligent optimization-based production planning and simulation analysis for steelmaking and continuous casting process", Int. J. Iron Steel Res, 17(9), pp.19~30 (2010)
