This research developed ultra-pressure pump main body by using ductile cast iron FCD500,conducted quantitative analysis on following phenomenon of flow or solidification processing in castprocessing for improvement of cast device, after extracting model from cast concluded as follows bybrinel hardness test. after selecting the ideal condition of cast and it applied to cast of real productshape, discovered the ideal filling processing under the condition that temperature of molten metal wasbetween 1300℃ and 1280℃. and after finishing filling, solidification was commenced rapidly whenpercentage of solidification completion was between 40%~50%, at that moment, the termperature wasmeasured 1100℃. moreover under the condition of temperature below 900℃, keeping temperature on thecenter of parts for a certain period of time brings stability of stabilization of heat in parts andorganizational stabilization of ductile cast iron. As the results of the casting method design, it was thatthe ductile cast parts of pump main body was obtained as the maximum HB of 220 was recorded andgood test results were achieved
Abstract
This research developed ultra-pressure pump main body by using ductile cast iron FCD500,conducted quantitative analysis on following phenomenon of flow or solidification processing in castprocessing for improvement of cast device, after extracting model from cast concluded as follows bybrinel hardness test. after selecting the ideal condition of cast and it applied to cast of real productshape, discovered the ideal filling processing under the condition that temperature of molten metal wasbetween 1300℃ and 1280℃. and after finishing filling, solidification was commenced rapidly whenpercentage of solidification completion was between 40%~50%, at that moment, the termperature wasmeasured 1100℃. moreover under the condition of temperature below 900℃, keeping temperature on thecenter of parts for a certain period of time brings stability of stabilization of heat in parts andorganizational stabilization of ductile cast iron. As the results of the casting method design, it was thatthe ductile cast parts of pump main body was obtained as the maximum HB of 220 was recorded andgood test results were achieved
참고문헌 (7)
- 박경민, "하이브리드 상용트럭 에어 브레이크 챔버 요소부품의 구조적 해석 연구", 한국기계기술학회지, 15(5), pp.717~723 (2013), 한국기계기술학회
- A. Jackson, "Extrusion Limit Diagrams : Effect of Homogenising Conditions and Extension to Productivity Analysis", Materials science and technology, 13, pp.61~68 (1997)
- O. Reiso, "The Effect of Billet Preheating Practice on Extrudability of AlMaSi Alloys", Preceeding of the fourth Int'l aluminum extrusion technology seminar, 1, pp.287~295 (1988)
- 이동렬, "발전용 터빈의 형상에 대한 성능 해석", 한국기계기술학회지, 16(2), pp.1249~1254 (2014), 한국기계기술학회
- Aboutalebi, M, "Coupled Turbulent Flow, Heat, and Solute Transport in Continuous Casting Processes", Metallurgical and Materials Transactions B, 28B, pp.731~744 (1995)
- N. S. Kim, "An investigation of flow characteristics onsidering the effect of viscosity variation in the thixoforming process", Journal of material processing technology, 103, pp.237~ (2000)
- C. Mitterer, "Application of hard coatings in aluminium die casting-soldering, erosion and thermal fatigue behaviour", surface and Coatings T echnology, 125, pp.233~ (2000)