LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.
Abstract
LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.
참고문헌 (10)
- 김은일, "신ㆍ재생에너지원 발전전력 차액지원을 위한 현행 기준가격의 재산정", 한국 태양에너지학회 학술대회 논문집, pp.281~286 (2008), 한국 태양에너지학회
- 김중영, "실물옵션모형을 활용한 부동산 개발가치 평가에 관한 연구", 감정평가학논집, 7(2), pp.1~18 (2008), 한국감정평가학회
- 박수억, "지속가능한 태양광발전시스템의 경제성 분석", 한국신재생에너지학회, 1(3), pp.35~41 (2005)
- 어성윤, "국내 태양광보급사업의 평가 : 발전차액 지원제도를 기준으로", 석사, 에너지시스템학, pp.2010
- 최봉하, "Sunbelt 지역의 태양광발전 경제성분석" (2006), 신재생에너지학회
- 황재룡, "태양광발전의 균등화 비용" (2012), 과학기술정보연구원
- 한국전력공사 경제연구소, "발전원가와 전원개발계획 II, 전력경제론(38)", 월간전기기술, 1, pp.91~96 (2000)
- The Impact of Different Economic Performance Metrics on the Perceived Value of Solar Photovoltaics, "Easan Drury", NREL, ~, pp.Technical Report TP-6A20-52197 (2011)
- Lux Research, Inc, "The Slow Dawn of Grid Parity" (2009)
- Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables, "Karlynn Cory", NREL, ~