해체용이성 설계 관련 규제요건 및 국내 원전 설계 반영 사례 고찰
Review of the Regulatory Requirements and Design Cases of Domestic Nuclear Power Plant Considering Decommissioning
2
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
The decommissioning of nuclear facilities should minimize the worker exposure, thegeneration of radioactive waste and its impact on environment, and should reduce costs by optimizingthe decommissioning process. For safe and economical decommissioning, it is necessary to design inconsideration of decommissioning-related matters such as minimization of facility and environmentalcontamination and the minimization of radioactive waste in preparation for decommissioning fromthe design stage. Therefore, this paper reviewed the regulatory requirements for consideringdecommissioning at the design stage, which should be considered to prepare for future decommissioningand not expected to affect the operational safety of nuclear facilities, and the design cases reflected ondomestic nuclear power plants when designing nuclear facilities. This is accomplished by reviewing theregulatory requirements, and analyzing the composition of a preliminary decommissioning plan. Thereflection of the design of domestic nuclear power plants was reviewed, with emphasis on the APR1400Design Control Document and Preliminary decommissioning plan for Shin-Kori Unit 56.
Abstract
The decommissioning of nuclear facilities should minimize the worker exposure, thegeneration of radioactive waste and its impact on environment, and should reduce costs by optimizingthe decommissioning process. For safe and economical decommissioning, it is necessary to design inconsideration of decommissioning-related matters such as minimization of facility and environmentalcontamination and the minimization of radioactive waste in preparation for decommissioning fromthe design stage. Therefore, this paper reviewed the regulatory requirements for consideringdecommissioning at the design stage, which should be considered to prepare for future decommissioningand not expected to affect the operational safety of nuclear facilities, and the design cases reflected ondomestic nuclear power plants when designing nuclear facilities. This is accomplished by reviewing theregulatory requirements, and analyzing the composition of a preliminary decommissioning plan. Thereflection of the design of domestic nuclear power plants was reviewed, with emphasis on the APR1400Design Control Document and Preliminary decommissioning plan for Shin-Kori Unit 56.
참고문헌 (9)
- IAEA, "Decommissioning Facilities. IAEA safety standards, No. GSR Part 6", ~ (2014)
- IAEA, "Considerations for Waste Minimization at the Design Stage of Nuclear Facilities" (2007)
- U.S.NRC, "Standard for Protection Against Radiation. 10 CFR 20", ~
- U.S.NRC, "Minimization of Contamination and Radioactive Waste Generation: Life-Cycle Planning. Regulatory Guide 4.21", ~ (2008)
- NEI, "Generic FSAR Template Guidance for Life Cycle Minimization of Contamination. NEI 08-08A", ~ (2009)
- "Article 4 of the Enforcement Ordinance of The Nuclear Safety Act Article 4", ~
- "Ministerial Ordinance of Technical Requirements Applying to the Nuclear Installations, Nuclear Safety and Security Commission, administrative rule 30", ~ (2021)
- KOREA ELECTRIC POWER CORPORATION, "APR1400-K-XFS-14002-NP. APR1400 Design Control Document Tier 2", ~ (2018)
- Korea Hydro & Nuclear Power Co., Ltd, "Shin-Kori Units 5&6 Preliminary Decommissioning Plan" (2017)