자동시험장비(ATE) 양산을 위한 시험장비의 설계 및 구현
Design and Fabrication of Test Equipment for mass production of Automatic Test Equipment(ATE)
3
조회
0
다운로드
4
인용
0
참고문헌
키워드
초록
In this paper, we proposed the test equipment that can perform separate performance tests to mass-produce the Automatic Test Equipment. Until now, the performance test of the ATE has been performed after it has been assembled perfectly. It is possible to perform the performance test only when the external device manufacturing and setting of measurement resources and the internal wiring work have been completed. So we have been studying test equipment that separately tested the switching devices that played a key role in the performance of the ATE. To build the test equipment, we reviewed the circuit card assemblies that make up the switching devices. We designed a test equipment that satisfies the performance test and apply the completed test equipment to the actual production process to analyze whether it was effective in improving the time and workability of the performance test. The test equipment has the advantage that it can be used universally in the mass production process of ATE with the same type of switching device.
Abstract
In this paper, we proposed the test equipment that can perform separate performance tests to mass-produce the Automatic Test Equipment. Until now, the performance test of the ATE has been performed after it has been assembled perfectly. It is possible to perform the performance test only when the external device manufacturing and setting of measurement resources and the internal wiring work have been completed. So we have been studying test equipment that separately tested the switching devices that played a key role in the performance of the ATE. To build the test equipment, we reviewed the circuit card assemblies that make up the switching devices. We designed a test equipment that satisfies the performance test and apply the completed test equipment to the actual production process to analyze whether it was effective in improving the time and workability of the performance test. The test equipment has the advantage that it can be used universally in the mass production process of ATE with the same type of switching device.
참고문헌 (8)
- W. K. Kim, "Design and Implementation of the multi-function switching system for Automatic Test Equipment(ATE)", Journal of the Graduate School of Industry Kumoh National Institute of Technology (2012)
- 윤영호, "무기체계 양산단계 자동화 시험장비(ATE) SW신뢰성 향상 방안 연구", 전자공학회논문지 - SC, 47(6), pp.19~26 (2010), 대한전자공학회
- 최경진, "사격통제장치 시스템 시험의 신뢰성 향상을 위한 생산시험장비에 관한 연구", 전자공학회논문지, 53(11), pp.139~147 (2016), 대한전자공학회
- 김동준, "무기체계 오류 검증을 위한 실시간 시스템 병렬시험 기법", 전자공학회논문지, 53(11), pp.130~138 (2016), 대한전자공학회
- 이상명, "생산성향상을 위한 회로카드조립체 시험장비에 관한 연구", 한국정보통신학회논문지, 16(12), pp.2808~2814 (2012), 한국정보통신학회[DOI]
- 양광모, "품질안전개선을 위한 공정능력지수의 연구", 대한안전경영과학회지, 8(4), pp.11~25 (2006), 대한안전경영과학회
- J. G. Kim, "On the Six-sigma Approach in Dependability Management System IEC60300", Proceedings of the Safety Management and Science Conference, pp.639~649 (2010)
- S. H. Hong, "Basic Statistics and MINITAB Usage for Six Sigma", KOREAN STANDARDS ASSOCIATION, ~ (2012)
