Scheduling optimization of hull block assembly line using constraint programming and discrete-event simulation

2

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류조선공학

초록

Scheduling of a block assembly line in a shipyard is commonly known as the Permutation Flow-shop Scheduling Problem (PFSP) in Operation Research (OR), which has been extensively studied in various papers since the 1950s. However, existing solutions often involve simplifying real-world problems with certain assumptions, limiting their practical applicability. In recent times, Constraint Programming (CP) has emerged as a strong alternative to exact algorithms and has been successfully applied to various PFSP problems, addressing the limitations of exact algorithms. In light of this, our study proposes a two-step optimization process to overcome these limitations. First, a new PFSP problem, Multi-Objective PFSP with hard due date constraint (MOPFSP-hd) is introduced. The problem is solved with CP algorithm. Next, the feasibility and objective value of the optimized solution is validated using Discrete-Event Simulation (DES). Two industrial cases are conducted to evaluate the performance of our proposed framework. The experimental results from both cases demonstrated a significant improvement in makespan compared to manually planned schedule. Additionally, the solutions derived from our proposed model are reported to be feasible, while the manually planned schedules are often infeasible by not satisfying all the constraints or encountering delays. Finally, the difference between the objectives calculated from CP and DES model is analyzed quantitatively using Critical Path Method (CPM).

Abstract

Scheduling of a block assembly line in a shipyard is commonly known as the Permutation Flow-shop Scheduling Problem (PFSP) in Operation Research (OR), which has been extensively studied in various papers since the 1950s. However, existing solutions often involve simplifying real-world problems with certain assumptions, limiting their practical applicability. In recent times, Constraint Programming (CP) has emerged as a strong alternative to exact algorithms and has been successfully applied to various PFSP problems, addressing the limitations of exact algorithms. In light of this, our study proposes a two-step optimization process to overcome these limitations. First, a new PFSP problem, Multi-Objective PFSP with hard due date constraint (MOPFSP-hd) is introduced. The problem is solved with CP algorithm. Next, the feasibility and objective value of the optimized solution is validated using Discrete-Event Simulation (DES). Two industrial cases are conducted to evaluate the performance of our proposed framework. The experimental results from both cases demonstrated a significant improvement in makespan compared to manually planned schedule. Additionally, the solutions derived from our proposed model are reported to be feasible, while the manually planned schedules are often infeasible by not satisfying all the constraints or encountering delays. Finally, the difference between the objectives calculated from CP and DES model is analyzed quantitatively using Critical Path Method (CPM).

관련 논문AI추천

Research on scheduling and optimization under uncertain conditions in panel block production line in shipbuilding신종계, Chong Wang, Puxiu Mao, Yunsheng Mao대한조선학회 · International Journal of Naval Architecture and Ocean Engineering2016 · 제8권 제4호System development for establishing shipyard mid-term production plans using backward process-centric simulationHuiqiang Shen, Jong Gye Shin, Saenal Sung, Suheon Ju, Yong-Kuk Jeong대한조선학회 · International Journal of Naval Architecture and Ocean Engineering2020 · 제12권 Simulation-based deep reinforcement learning for multi-objective identical parallel machine scheduling problem남소현, 우종훈, Young-in Cho대한조선학회 · International Journal of Naval Architecture and Ocean Engineering2024 · 제16권 Optimization of long-term planning with a constraint satisfaction problem algorithm with a machine learning곽동훈, 우종훈, Choe Sung Won, Cho Young In, Kwon Hyun Joo대한조선학회 · International Journal of Naval Architecture and Ocean Engineering2022 · 제14권 Automation of block assignment planning using a diagram-based scenario modeling method김영민, 신종계, 이동균, 황인혁대한조선학회 · International Journal of Naval Architecture and Ocean Engineering2014 · 제6권 제1호조선소 병렬 기계 공정에서의 납기 지연 및 셋업 변경 최소화를 위한 강화학습 기반의 생산라인 투입순서 결정남소현, 우종훈, 조영인대한조선학회 · 대한조선학회 논문집2023 · 제60권 제3호

이 간행물의 다른 논문 (70건)