Productivity and Cost of Tree-length Harvesting Using Cable Yarding System in a Larch (Larix leptolepis) Clear-cutting Stand
1
조회
0
다운로드
2
인용
0
참고문헌
키워드
초록
The purpose of this study was to examine productivity and cost of tree-length harvesting using cable yarding system in a larch (Larix leptolepis) clear-cutting stand located in Pyeongchang-gun, Gangwon-do. We used tree-length harvesting method using cable yarding system with a tower yarder HAM300. The productivity was 17.6 m3/hr for felling, 12.4 m3/hr for delimbing, 4.2 m3/hr for yarding, and 8.1 m3/hr for processing. The total cost of the harvesting system was 48,381 won/m3, which was majorly composed of yarding operation cost, at 40,169 won/m3 (79.3%), while felling had the lowest cost at 1,154 won/m3 (4.1%). Major factors affecting felling and processing productivity was tree volume and the number and thickness of branches for delimbing productivity. In addition, we suggest that training and education for machine operators were critical to improve yarding productivity.
Abstract
The purpose of this study was to examine productivity and cost of tree-length harvesting using cable yarding system in a larch (Larix leptolepis) clear-cutting stand located in Pyeongchang-gun, Gangwon-do. We used tree-length harvesting method using cable yarding system with a tower yarder HAM300. The productivity was 17.6 m3/hr for felling, 12.4 m3/hr for delimbing, 4.2 m3/hr for yarding, and 8.1 m3/hr for processing. The total cost of the harvesting system was 48,381 won/m3, which was majorly composed of yarding operation cost, at 40,169 won/m3 (79.3%), while felling had the lowest cost at 1,154 won/m3 (4.1%). Major factors affecting felling and processing productivity was tree volume and the number and thickness of branches for delimbing productivity. In addition, we suggest that training and education for machine operators were critical to improve yarding productivity.
참고문헌 (19)
- Brinker RW, "Machine rates for selected forest harvesting machines. Alabama Agricultural Experiment Station", pp.32~ (2002), Auburn University
- 조구현, "낙엽송 간벌작업에서 전간수확시스템의 작업비용 분석", 한국산림과학회지, 104(2), pp.221~229 (2015), 한국산림과학회[DOI]
- 조민재, "Harvesting Cost and Productive of Tree-Length Thinning in a Pinus densiflora Stand Using the Tower Yarder (HAM300)", Journal of forest and environmental science, 32(2), pp.189~195 (2016), 산림과학연구소
- 조민재, "낙엽송 개벌 임분에서 타워야더를 이용한 전목수확시스템의 작업비용 분석", Journal of forest and environmental science, 30(1), pp.107~112 (2014), 산림과학연구소[DOI]
- Han WS., "Development of an Estimation Model for Timber Harvesting and Transportation Costs", PhD, pp.2009
- 한원성, "체인톱을 이용한 잣나무의 벌도작업 공정 분석", 한국산림과학회지, 98(4), pp.451~457 (2009), 한국산림과학회
- 한원성, "가선집재작업에서의 작업 생산성 및 비용 분석", 한국산림과학회지, 103(1), pp.87~97 (2014), 한국산림과학회[DOI]
- 한원성, "트랙터부착 집재기를 이용한 집재작업 분석-춘천집재기를 중심으로-", 한국산림과학회지, 97(6), pp.641~649 (2008), 한국산림과학회
- Kim MK., "An analysis on the productivity and cost of logging operation in whole-tree logging operation system", MS, pp.2010
- 김민규, "전목 및 단목 집재작업시스템에서 작업시간 및 공정 분석", 한국산림과학회지, 101(3), pp.344~355 (2012), 한국산림과학회
- 김민규, "전목 및 단목 집재작업시스템에서 작업비용 분석", 한국산림과학회지, 102(2), pp.229~238 (2013), 한국산림과학회
- Korea Forest Service., "2016 Statistical Yearbook of Forestry", 19~ (2016)
- Lee GT, "Analysis of process for the development of timber harvesting model", J Korean Soc For Eng, 4, pp.31~56 (2006)
- Lee JA., "Productivity and Cost Analysis of Whole-tree Harvesting System using Swing-yarder", MS, pp.2013
- Lee JW, "Work Load of Felling Work Using Chain Saw in Japanese Larch Plantation Site", J Korean For Soc, 87, pp.121~130 (1998)
- Determining Fixed and Operating Costs of Logging Equipment, "Miyata ES.", U.S. Department of Agriculture Forest Service, 16~, pp.U.S. Department of Agriculture Forest Service Gen. Tech. Report NC-55 (1980)
- 설아라, "Woodgrab을 이용한 단목집재와 가선집재방식에 의한 전목집재의 경제적 효율성 비교분석", 한국산림과학회지, 105(2), pp.231~237 (2016), 한국산림과학회[DOI]
- Woo BM, "A Study on Economical Analysis of Yarding Operation by Cable Crane", J Korean For Soc, 79, pp.413~418 (1990)
- You JW., "A case study for analyzing the problems of a nonproductive and high cost cable logging operation", MS, pp.2015
