The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvestingsystem in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 m³/hr. The highest production activity was the felling 17.93 m³/hr, followed by the productivity of processing 15.62 m³/hr and then by the productivity of yarding 9.52 m³/hr. In addition the total stump-to-pile operational cost was 24,086 won/m³. The highest cost activity was the yarding 14,557 won/m³ (60.4% of the total cost), followed by the costs of processing 8,461 won/m³ (35.2%) and then by the costs of felling 1,068 won/m³.
Abstract
The productivity and cost of clear cutting operations were examined to broaden our knowledge on the harvestingsystem in a Larix leptolepis stand of Korea. The harvesting system was divided into tree operations which were chainsaw (STIHL MS440) felling, tower yarder (Koller301-4) yarding and harvester (WOODY H50) processing. The average cycle time of felling, yarding and processing were 98 s/cycle, 245 s/cycle and 150 s/cycle. The total stump-to-pile operational productivity was 43.07 m³/hr. The highest production activity was the felling 17.93 m³/hr, followed by the productivity of processing 15.62 m³/hr and then by the productivity of yarding 9.52 m³/hr. In addition the total stump-to-pile operational cost was 24,086 won/m³. The highest cost activity was the yarding 14,557 won/m³ (60.4% of the total cost), followed by the costs of processing 8,461 won/m³ (35.2%) and then by the costs of felling 1,068 won/m³.
참고문헌 (13)
- Han WS, "Development of an estimation model for timber harvesting and transportation costs", 박사, pp.2008
- 한원성, "체인톱을 이용한 잣나무의 벌도작업 공정 분석", 한국임학회지, 98(4), pp.451~457 (2009), 한국임학회
- Ji BY, "A time study on felling and bucking of Larix leptolepis stands", Proceedings of the Annual Meeting of Korean Forest Society, pp.95~96 (1997)
- 김민규, "전목 및 단목 집재작업시스템에서 작업시간 및 공정 분석", 한국임학회지, 101(3), pp.344~355 (2012), 한국임학회
- "Statistical yearbook of forestry" (2010)[URL]
- "Statistical yearbook of forestry" (2013)[URL]
- Lee JA, "Productivity and Cost Analysis of Whole-tree Harvesting System using Swing-yarder", 석사, pp.2012
- Determining fixed and operating costs of logging equipment, "Miyata ES", U.S. Department of Agriculture Forest Service Gen, 16~ (1980)
- Oh JH, "Productivity analysis of yarding operation with a swing-yarder", Proceedings of Annual Meeting of Korean Forest Society, pp.992~994 (2012)
- 박상준, "타워야더에 의한 집재작업시스템 분석", 한국임학회지, 93(3), pp.205~214 (2004), 한국임학회
- Park SJ, "An analysis of forest biomass amount and harvesting system", J Korea Soc For Eng Tech, 2, pp.13~29 (2004)
- Song TY, "Studies on the comparison of the working cost with skidding method far track - type mini skidder", Korean J For Econom, 6, pp.20~28 (1998)
- Woo BM, "A study on economical analysis of yarding operation by cable crane", J Korean For Soc, 79, pp.413~418 (1990)