국내 ETCS Level 2 열차제어시스템의 무선폐색센터성능검증에 관한 연구
A Study on Performance Verification of Radio Block Center (RBC) in Korea ETCS Level 2 Train Control System
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
This paper includes laboratory establishment and test for performance verification of RBC(Radio Black Center) in Korea ETCS level 2 train control system. The laboratory consists of LSU(local simulator unit), RBC, EVCSU(EVC simulator unit) and STU(safe transmission unit). In order to verify the performance of RBC, we should confirm that DMI(driver machine interface) display correct information on the screen. That information are generated by LSU and EVCSU, and transmitted to DMI through RBC. Also we should confirm that station information console and RBC supervision console display correct information (local, status, movement authority information). In this paper we establish a laboratory and verify performance of RBC by test using test sequence. As a result, we can confirm that DMI, station information console and RBC supervision console display correct information on each screen.
Abstract
This paper includes laboratory establishment and test for performance verification of RBC(Radio Black Center) in Korea ETCS level 2 train control system. The laboratory consists of LSU(local simulator unit), RBC, EVCSU(EVC simulator unit) and STU(safe transmission unit). In order to verify the performance of RBC, we should confirm that DMI(driver machine interface) display correct information on the screen. That information are generated by LSU and EVCSU, and transmitted to DMI through RBC. Also we should confirm that station information console and RBC supervision console display correct information (local, status, movement authority information). In this paper we establish a laboratory and verify performance of RBC by test using test sequence. As a result, we can confirm that DMI, station information console and RBC supervision console display correct information on each screen.
참고문헌 (6)
- P. Winter, "ETCS expanding in- and outside of Europe", CAETS, 2012, ~
- S.B. Lee, "Train Control System(ETCS Level 2) Development Status and Future Challenges", Conference of the Korean Society for Railway, pp.1066~1076 (2011)
- Y.K. Kim, "21세기 유럽의 열차제어 시스템", Journal of the Korean Society for Railway, 5(4), pp.16~24 (2002)
- (A)study on the operation and safety for applying ETCS level 2 to Korean railways, "M.C. Lee", Woosong University, 109~115 (2015)
- F. Senesi, "Italian Experience with ETCS L2", 10th UIC ERTMS World Conference (2012)
- M. Tirri, "Integration and Testing Process of the ERTMS", ETCS Level 2 in the Czech Republic Pilot Project, 2010, 502~508
