궤도차량 변속기 누유 방지에 관한 연구
A Study on the Prevention of Leakage of Tracked Vehicle Transmission
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
Military tanks and armored vehicles use tracks with excellent mobility in rough terrain, the transmission, a key component of tracked vehicle driving performance, performs shifting, steering and braking functions of tracked vehicles. There was concern about the deterioration of the driving performance of the tracked vehicle due to the occurrence of oil leakage in the output part of the transmission that rotates the track of the vehicle. Throughㅇ failure mechanism analysis and characteristic factor analysis using 4M(Man, Machine, Material, Method) quality management, it was confirmed that the factor affecting oil leakage in the output part was damage to the output shaft coupling surface, which is the contact surface of the output part oil seal. Based on this, a quality improvement plan was derived by applying a protective cap to prevent damage to the coupling surface, increasing the coupling surface hardness to improve the oil seal sealing function, and revising the work standard throughout production, process movement and assembly stages. The effectiveness of the proposed improvement was verified through a single transmission test, a power pack test, and a track vehicle installation test, and the effectiveness was verified through follow-up observation. It is expected that the improvements derived from this study will be utilized in the future analysis of similar equipment quality problems.
Abstract
Military tanks and armored vehicles use tracks with excellent mobility in rough terrain, the transmission, a key component of tracked vehicle driving performance, performs shifting, steering and braking functions of tracked vehicles. There was concern about the deterioration of the driving performance of the tracked vehicle due to the occurrence of oil leakage in the output part of the transmission that rotates the track of the vehicle. Throughㅇ failure mechanism analysis and characteristic factor analysis using 4M(Man, Machine, Material, Method) quality management, it was confirmed that the factor affecting oil leakage in the output part was damage to the output shaft coupling surface, which is the contact surface of the output part oil seal. Based on this, a quality improvement plan was derived by applying a protective cap to prevent damage to the coupling surface, increasing the coupling surface hardness to improve the oil seal sealing function, and revising the work standard throughout production, process movement and assembly stages. The effectiveness of the proposed improvement was verified through a single transmission test, a power pack test, and a track vehicle installation test, and the effectiveness was verified through follow-up observation. It is expected that the improvements derived from this study will be utilized in the future analysis of similar equipment quality problems.
참고문헌 (9)
- J. Y. Kim, "Introduction of tracked vehicles and design features of military tracked vehicle suspension", Journal of the Korean Society of Automotive Engineers, 22(3), pp.23~27 (2000)
- H. H. Kim, "A Study on Leakage Mechanism Investigation of Hydraulic Fluid for ISU(In-arm hydropneumatic Suspension Unit)", Journal of the Korean Society of Mechanical Technology, 20(2), pp.246~252 (2018)
- C. K. Song, "Control factor of automatic transmission for military tracked vehicle", The Korean Society of Automotive Engineers, pp.612~615 (2010)
- J. W. Jeong, "Design Improvement of the driving bevel gear in transmissions of a Tracked Vehicle", Journal of the Korean Society of Manufacturing Process Engineers, 14(2), pp.1~6 (2015)
- T. S. Moon, "Improvement of Engine Stall by Load Increment on Tracked Armored Vehicles", Journal of the KIMST, 18(5), pp.492~497 (2015)
- D. M. Park, "A study on the selection of oil seals to prevent oil leakage-Focusing on cases in the automotive and defense sectors", The Korean Society of Mechanical Engineers, 2021(5), pp.14~15 (2021)
- S. Sh. Abedi, "Failure Analysis of SCC and SRB Induced Cracking of a Transmission Oil Products Pipeline", Engineering Failure Analysis, 14, pp.250~261 (2007)
- S. K. Cha, "Development of Production Resources(4M1E)Integraion in Real Time and Middleware for Autonomous Configuration", Journal of the Korean Society of Precision Engineering, 31(4), pp.303~309 (2014)
- N. S. Ahn, "Suggestion for Change in Risk Management Based Government Quality Assurance Activities of Military Supplies", Journal of the Kerea Academia-Industrial cooperation Society, 16(9), pp.5914~5923 (2015)
