설계자료와 모니터링 자료 분석을 통한 지열히트펌프의 지열에너지 이용량 비교
A Comparison of Geothermal Energy Utilized by GSHP between Real Monitoring Data and the Design Criteria
0
조회
0
다운로드
3
인용
0
참고문헌
키워드
초록
We analyze the heating and cooling energy loads of the buildings in the geothermal utilization report submitted to Korea Energy Management Corporation (KEMCO) and extract the capacity factor (CF) according to building types. The estimated geothermalenergy through the World Geothermal Congress (WGC) criteria based on the CF is compared with the heating energy load of the building. It is also compared with the values predicted by means of statistics used in Korea which are annually published as the New & Renewable Energy Statistics. The geothermal heating energy estimated by means of WGC criterion is 91% of the designed thermal load of the buildings. But the estimated average heating geothermal energy predicted by means of statistics used in Korea is 307% of the designed load of the buildings. We also compared monitoring results of a ground source heat pump (GSHP) system from 24 January to 14 September 2014 with the design data of the geothermal utilization report submitted to KEMCO. The energy produced by the GSHP system under operation is analyzed and is compared with the values predicted by means of statistics used in Korea. The designed energy load of the building is just 48% of the estimated energy by the means of statistics of Korea. The energy produced in the load part and source part is 59% and 36% of the estimated energy, respectively. Therefore, it is needed to devise a reasonable criterion of estimating geothermal energy production through GSHP system in Korea.
Abstract
We analyze the heating and cooling energy loads of the buildings in the geothermal utilization report submitted to Korea Energy Management Corporation (KEMCO) and extract the capacity factor (CF) according to building types. The estimated geothermalenergy through the World Geothermal Congress (WGC) criteria based on the CF is compared with the heating energy load of the building. It is also compared with the values predicted by means of statistics used in Korea which are annually published as the New & Renewable Energy Statistics. The geothermal heating energy estimated by means of WGC criterion is 91% of the designed thermal load of the buildings. But the estimated average heating geothermal energy predicted by means of statistics used in Korea is 307% of the designed load of the buildings. We also compared monitoring results of a ground source heat pump (GSHP) system from 24 January to 14 September 2014 with the design data of the geothermal utilization report submitted to KEMCO. The energy produced by the GSHP system under operation is analyzed and is compared with the values predicted by means of statistics used in Korea. The designed energy load of the building is just 48% of the estimated energy by the means of statistics of Korea. The energy produced in the load part and source part is 59% and 36% of the estimated energy, respectively. Therefore, it is needed to devise a reasonable criterion of estimating geothermal energy production through GSHP system in Korea.
참고문헌 (20)
- 송윤호, "지열에너지자원 활용의 통계작성 및 파급효과 산출방안", 한국자원공학회지, 47(3), pp.277~282 (2010), 한국자원공학회
- F. Ruiz-Calvo, "Reference data sets for validating GSHP system models and analyzing performance parameters based on a five-year operation period", Geothermics, 51, pp.417~428 (2014)
- EU, "Official Journal of the European Union", DIRECTIVE (2009, EC), pp.2009, ~
- A. Michopoulos, "Operation characteristics and experience of a ground source heat pump system with a vertical ground heat exchanger", Energy, 51, pp.349~357 (2013)
- Francesco Madonna, "Annual performances of reversible air-to-water heat pumps in small residential buildings", Energy and Buildings, 65, pp.299~309 (2013)
- T. Magraner, "Comparison between design and actual energy performance of a HVAC- ground coupled heat pump system in cooling and heating operation", Energy and Buildings, 42, pp.1394~1401 (2010)
- 김병수, "그린스쿨 교실에 적용된 지열원 히트펌프 시스템의 냉난방에너지 성능평가분석", 대한건축학회논문집 계획계, 26(02), pp.267~274 (2010), 대한건축학회
- 남유진, "지역 기후 특성에 따른 지열시스템의 도입경제성 차이에 관한 연구", KIEAE Journal, 14(4), pp.127~131 (2014), 한국생태환경건축학회[DOI]
- 손병후, "수평형 지열 히트펌프 시스템의 냉난방 성능 분석", 설비공학 논문집, 24(3), pp.230~239 (2012), 대한설비공학회
- 손병후, "업무용 건물의 지열 히트펌프 시스템에 대한 성능 예측", 설비공학 논문집, 26(9), pp.409~415 (2014), 대한설비공학회[DOI]
- 이일규, "LCC 분석을 통한 도시가스와 지열 냉‧난방설비의 경제성 평가", 대한건축학회논문집 구조계, 27(10), pp.161~168 (2011), 대한건축학회
- 장재철, "지열히트펌프의 성능 확인을 위한 실험적 연구 및 냉방에너지 분석에 관한 연구", 대한설비공학회 하계학술발표대회 논문집, pp.473~476 (2011)
- 황광일, "연구·사무용 건물에 적용된 수직형 지열 냉난방시스템의 계절별 성능평가", 대한건축학회논문집 계획계, 25(07), pp.345~352 (2009), 대한건축학회
- 홍부표, "물 대 물 방식 수직 밀폐루프 지열원 히트펌프시스템의 냉방성능에 대한 실험적 연구", 한국태양에너지학회 논문집, 34(1), pp.58~63 (2014), 한국태양에너지학회
- "EPA Website"[URL]
- John W. Lund, "Direct utilization of geothermal energy 2010worldwide review", Geothermics, 40, pp.159~180 (2011)
- 제2차 에너지기본계획, "산업통상자원부", ~ (2014)
- 제4차 신・재생에너지 기본계획, "산업통상자원부", ~ (2014)
- 에너지관리공단, "2013년 신・재생에너지 보급통계", ~ (2014)
- EU, "Official Journal of the European Union", DECISION (2013, EU), pp.2013, ~
