국제건설계약분쟁과 그 해결

Disputes in International Construction Contract and Resolution Thereof

0

조회

0

다운로드

5

인용

0

참고문헌

키워드

주제분류법학

초록

In this paper, we first examined the characteristics of international construction contracts and disputes therof. International construction contracts and the disputes thereof are large volume, long term and complex due to different cultures, languages, customs & laws of the parties and countries involved. Situation goes worse due to involvement of multi-party and intervention of the relevant governments. In order to resolve these disputes rapidly and efficiently, various mechanisms of dispute resolution procedure have been adopted between the Owner, Contractor and/or other related parties such as litigation, arbitration and other forms of alternative dispute resolution. Traditionally, arbitration has been frequently employed for resolution of disputes in international construction contracts. ICC has been well known for those arbitration cases. Although arbitration was better than litigation in resolving international disputes, still it was remote from the construction site and took long time to reach a conclusion. There have been efforts to streamline the court procedure for construction disputes. For example, in the UK the Technology and Construction Court was established to cope with the problems in resolving construction disputes by litigation, The TCC judge has proved the need of the special court and procedure. The most popular mechanism for dispute resolution of construction contract is the adjudication procedure which has been developed in England and widely used in common law countries. In adjudication procedure such as DAB or DRB adjudicators are appointed at the outset of the construction and follow up the development of the construction project. They frequently visit the site to become familiar with the project. Once a dispute arises, adjudicators easily find solutions and issue determinations which bind the parties. In comparison to litigation or arbitration procedure a decision of which is rendered by the judge or arbitrator who are appointed after arising disputes, adjudication has advantages since the adjudicators are selected at the time of the conclusion of contract before occurrence of conflicts. The parties to an international construction contract should find the best mechanism of dispute resolution depending upon the nature and the types of disputes. Further the parties are required to carefully design the mechanism which fit the contract and the dispute. Lessons from the mechanism for international dispute resolution will apply to the domestic dispute resolution, which is less sophisticated than the international counterpart.

Abstract

In this paper, we first examined the characteristics of international construction contracts and disputes therof. International construction contracts and the disputes thereof are large volume, long term and complex due to different cultures, languages, customs & laws of the parties and countries involved. Situation goes worse due to involvement of multi-party and intervention of the relevant governments. In order to resolve these disputes rapidly and efficiently, various mechanisms of dispute resolution procedure have been adopted between the Owner, Contractor and/or other related parties such as litigation, arbitration and other forms of alternative dispute resolution. Traditionally, arbitration has been frequently employed for resolution of disputes in international construction contracts. ICC has been well known for those arbitration cases. Although arbitration was better than litigation in resolving international disputes, still it was remote from the construction site and took long time to reach a conclusion. There have been efforts to streamline the court procedure for construction disputes. For example, in the UK the Technology and Construction Court was established to cope with the problems in resolving construction disputes by litigation, The TCC judge has proved the need of the special court and procedure. The most popular mechanism for dispute resolution of construction contract is the adjudication procedure which has been developed in England and widely used in common law countries. In adjudication procedure such as DAB or DRB adjudicators are appointed at the outset of the construction and follow up the development of the construction project. They frequently visit the site to become familiar with the project. Once a dispute arises, adjudicators easily find solutions and issue determinations which bind the parties. In comparison to litigation or arbitration procedure a decision of which is rendered by the judge or arbitrator who are appointed after arising disputes, adjudication has advantages since the adjudicators are selected at the time of the conclusion of contract before occurrence of conflicts. The parties to an international construction contract should find the best mechanism of dispute resolution depending upon the nature and the types of disputes. Further the parties are required to carefully design the mechanism which fit the contract and the dispute. Lessons from the mechanism for international dispute resolution will apply to the domestic dispute resolution, which is less sophisticated than the international counterpart.

참고문헌 (56)

  1. 김경배, "국제무역분쟁과 ADR" (2005), 무역경영사
  2. 윤재윤, "건설분쟁관계법" (2006), 박영사
  3. 최준선, "국제거래법" (2008), 삼영사
  4. 최준선, "로스쿨 국제거래법 - 이론과 사례" (2011), 박영사
  5. 현학봉, "해외 건설공사 계약관리와 클레임" (2009), (주)씨플러스 인터내셔널
  6. 山田 鐐一, "国際取引法" (2009), 有斐閣
  7. Derek Simmonds, "Statutory Adjudication: A Practical Guide" (2008), Blackwell Publishing
  8. I.N. Duncan Wallace, "Construction contracts: Principles and Policies in tort and contract" (1986), Sweet&Maxwell
  9. Jane Jenkins, "International Construction Arbitration Law" (2006), Kluwer Law International
  10. Jimmie Hinze, "Construction Contracts" (2010), McGraw-Hill
  11. John Uff, "Construction law; law and practice to the construction industry" (2009), Sweet&Maxwell
  12. Robert Knutson, "FIDIC-Analysis of the International Construction Contracts" (2005), Kluwer Law
  13. Wendy Kennedy Venoit, "International Construction Law" (2009), ABA
  14. 김갑유, "국내기업관련 ICC중재의 현황과 절차에서의 실무상 Check Point에 관한 검토", ~
  15. 김세연, "해외건설클레임과 국제중재", 2013. 5. 28. 국제거래법학회 세미나 자료집 (2013)
  16. 김승현, "프로젝트 파이낸스와 EPC", Turnkey 契約, 2004, pp.(58), 125~170[DOI]
  17. 해외건설 계약 및 클레임 관리 실태와 대응 방안, "김원태", 건설, ~, pp.건설이슈포커스 제12-14호 (2012)
  18. 손경한, "국제계약 체결기법", 경영법무, (3) (1994)
  19. 손경한, "전속적 재판관할합의의 유효요건", 중재, (29) (1998)
  20. 석광현, "전속적 국제재판관할합의의 유효요건", 법률신문, ~ (2004)
  21. 신현식, "국내기업의 FIDIC 이용실태와 유의사항", 2013. 5. 28. 국제거래법학회 세미나 자료집 (2013)
  22. 안강현, "UNIDROIT 국제상사계약원칙에 있어서의 Hardship", 상사법연구, 21(1), pp.7~221 (2002), 한국상사법학회
  23. 이종수, "New FIDIC 제정의 이해와 시사점", 건설산업동향, 16(1149) (2003)
  24. 조영준, "사전분쟁조정위원회(DRB)는 우리나라에 제대로 정착될 수 있을까", 건설관리, 10(1) (2009), 한국건설관리학회
  25. 韓忠洙, "국제재판관할합의에 관한 연구", 박사, 법학, pp.1997
  26. 한충수, "국제재판관할합의에 있어 전속적 관할합의의 유효요건 중 내국관련성 문제", 한국민사소송법학회지, 1(1) (1998)
  27. Anthony Dymond, "The Engineer’s Role in Contract Management", 세미나 자료집 (2013), 국제거래법학회
  28. 大西正光, "国際建設契約における契約紛争の発生構造", 土木学会論文集, (714) (2002)
  29. Christopher R. Seppälä, "Enforcement by an Arbitral Tribunal of a Binding but Not Final Engineer’s or DAB’s Decision under the FIDIC Conditions", I.C.L.R (2009)
  30. Daniel D. McMillan, "Dispute Review Boards: Key Issues, Recent Case Law, and Standard Agreements", The Construction Lawyer, 25(2) (2005)
  31. DR JJ Goudsmit, "The EIC (European International Contractors) Turnkey Contract (Conditions for Design and Construction Projects)", I.C.L.R, 12 (1995)
  32. Frederic Gillion, "Enforcement of DAB Decisions under the 1999 FIDIC Conditions of Contract: A Recent Development: CRW Joint Operation v. PT Peninsula Gas Negara (Persero) TBK", I.C.L.R (2011)
  33. Ghada Moustafa Gad, "Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts", 박사, pp.2012
  34. Gordon L Jaynes, "Turnkey Contracts: Japan’s Model Forms", I.C.L.R, 10 (1993)
  35. "Resolving international construction disputes-litigation or arbitration?"[URL]
  36. Hiromi Hoshi, "ENAA Model Form of Contract for Power Plant Construction", I.C.L.R, 14 (1997)
  37. "Choice of Governing Law in Construction Contracts and Architects Agreements"[URL]
  38. Kunihiko Furuya, "ENAA Revised Model Form of Contract (1992) Edition", I.C.L.R, 10 (1993)
  39. Marwan Sakr, "Turnkey Contracting under the ICC Model Contract for Major Projects: A Middle Eastern Law Perspective", I.C.L.R, 26 (2009)
  40. Mike Allen, "Global Construction Dispute : A Longer Resolution", Global Construction Disputes Report 2013 (2013)
  41. Nicholas Gould, "Comments on the ENAA Model Form International Contract for Process Plant Construction (Revised 1992)", I.C.L.R, 11 (1994)
  42. Nicholas Gould, "Dispute resolution in the construction industry : An overview", Construction Law seminar: Introduction to the basics (2004)
  43. Tore Wiwen-Nilsson, "A Brief Review of the 1992 Edition of the ENAA Model Form- International Contract for Process Plant Construction (Turnkey Lumpsum Basis)", I.C.L.R, 11 (1994)
  44. "행정중심복합도시건설청 전문시방서 총칙", ~
  45. "해외건설협회 해외건설종합정보서비스"[URL]

관련 논문AI추천

이 간행물의 다른 논문 (12건)