본문 바로가기
KERD
논문KCI 등재

신제품개발을 위한 프론트로딩 요소 우선순위 도출 :자동차부품 설계단계 중심으로

Prioritize Front-Loading Factors Analysis for New Product Development : Focus on Automobile Parts Design Stage

0

조회

0

다운로드

1

인용

0

참고문헌

키워드

주제분류산업공학

초록

The purpose of this study is to provide the priority of the front-loading factors in the design stage of the automotive parts development process in order to efficiently and effectively respond to the demands of the car maker (customer). Front-loading is defined as a strategy in order to improve development performance by shifting the identification and solving of design problems to earlier phases of a product development process. Two approaches of the front-loading are project-to-project knowledge transfer and rapid problem solving. For the study, a survey was conducted on the R&D department in the automobile parts company and analyzed by AHP (Analytic Hierarchy Process) method. The result of the survey shows the cost savings is the highest weight in terms of front-loading effect and in terms of front-loading factors, it gives priorities as “the problems of past project” first, “Design Review” second, “CAE (Computer Aided Engineering)” third, “FMEA (Failure Mode and Effects Analysis)” fourth, “benchmarking” and SR (Sourcing of Requirements). The results of the study will be helpful to provide practical value for improving product design of component development.

Abstract

The purpose of this study is to provide the priority of the front-loading factors in the design stage of the automotive parts development process in order to efficiently and effectively respond to the demands of the car maker (customer). Front-loading is defined as a strategy in order to improve development performance by shifting the identification and solving of design problems to earlier phases of a product development process. Two approaches of the front-loading are project-to-project knowledge transfer and rapid problem solving. For the study, a survey was conducted on the R&D department in the automobile parts company and analyzed by AHP (Analytic Hierarchy Process) method. The result of the survey shows the cost savings is the highest weight in terms of front-loading effect and in terms of front-loading factors, it gives priorities as “the problems of past project” first, “Design Review” second, “CAE (Computer Aided Engineering)” third, “FMEA (Failure Mode and Effects Analysis)” fourth, “benchmarking” and SR (Sourcing of Requirements). The results of the study will be helpful to provide practical value for improving product design of component development.

참고문헌 (25)

  1. Booz, Allen, "New product management for the 1980s" (1982), Booz Allen Hamilton
  2. Chang, W.S, "Improvement of competitiveness of Korea automobile industry", VIP Report, 722, pp.1~12 (2018)
  3. Cho, G. T., "Hierarchical analytical decision making of leading leaders" (2003), Dong Hyun Publishing Co
  4. Choi, S. G., "A Comparative analysis of the mathods of estimating weights of AHP", pp.1996
  5. Cooper, R. G., "Determinants of timeliness in product development", Journal of Product Innovation Management, 11(5), pp.381~396 (1994)
  6. Fujimoto, T., "Toyota Evolution ability" (2005), Gasan Boos
  7. Goffin, K, "Innovation management :effective strategy and implementation" (2016), Macmillan International Higher Education
  8. Han, S. H., "Frontloading with Korean companies" (2009), BB Media
  9. 허필우, "기술지주회사 자회사의 기술사업화 애로요인 분석 - 부산지역을 중심으로 -", 한국혁신학회지, 14(1), pp.61~94 (2019), 한국혁신학회[DOI]
  10. Huang, G. Q., "The DFX shell : A generic framework for developing design for X tools", Robotics and Computer-Integrated Manufacturing, 13(3), pp.271~280 (1997)
  11. 황두희, "혁신클러스터의 진화 : 대덕연구개발특구를 중심으로", 기술혁신학회지, 21(4), pp.1207~1236 (2018), 한국기술혁신학회
  12. Imai, N., "Management of Innovation Strategy in Japanese Companies", pp.131~143 (2017)
  13. Jang, H.J., "The Effect of Working Hours Reduction on Employee’s Motivation, Job Involvement and Job Performance", Master’s, pp.2019
  14. 김태수, "AHP에 의한 한국자동차부품제조사의 제조성과기준의 중요도 평가", 한국산업경영시스템학회지, 34(3), pp.115~122 (2011), 한국산업경영시스템학회
  15. Kim, T.Y., "Analysis of success factor tor educe the new car developing period by automobile industry", Master’s, pp.2010
  16. A study on the improvement of management environment for automobile industry due to Environmental Changes, "Lee, B.H.", The Korean Society for Quality Management, 127~133 (2018)
  17. 이현욱, "신제품 개발 프로세스 변환의 성공 요인에 관한 사례연구 : IT제품에서 Automotive 제품으로", 한국IT서비스학회지, 15(4), pp.175~191 (2016), 한국IT서비스학회[DOI]
  18. Morgan, J., "The Toyota product development system : integrating people, process, and technology" (2006), Productivity press
  19. Sheremata, W. A., "Finding and solving problems in software new product development", Journal of Product Innovation Management : An International Publication on of The Product Development & Management Association, 19(2), pp.144~158 (2002)
  20. Stalk, G., "Time the next source of competitive advantage", Harvard Business Review, 66(4), pp.41~51 (1988)
  21. Takeuchi, H., "The new product development game", Harvard Business Review, 64(1), pp.137~146 (1986)
  22. Thomke, S., "The effect of ‘front-loading’problem-solving on product development performance", Journal of Product Innovation Management, 17(2), pp.128~142 (2000)
  23. Thomke, S. H., "Managing experimentation in the design of new products", Management Science, 44(6), pp.743~762 (1998)
  24. Tuna, S., "Efficient front-loading through knowledge integration", International Journal of Product Development, 19(5-6), pp.286~306 (2014)
  25. Does product design really determine 80% of manufacturing cost?, "Ulrich, K.T.", Sloan School of Management, MIT, ~, pp.Working Paper 3601-93-MSA (1993)

관련 논문AI추천

이 간행물의 다른 논문 (22건)