일반농산어촌개발 지역역량강화사업비의 적정요율 산정
An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project
0
조회
0
다운로드
6
인용
0
참고문헌
키워드
초록
The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. ① In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. ② Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.
Abstract
The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. ① In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. ② Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.
참고문헌 (14)
- 강황선, "공공시설의 합리적인 운영방안에 관한 연구 : 요율산정을 중심으로", 지방정부연구, 13(3), pp.179~205 (2009), 한국지방정부학회
- 김승근, "농촌마을종합개발사업을 통해 본 주 민참여와 진행과정의 문제점과 개선방향", 한국농촌 건축학회 춘계학술대회 주제발표, pp.57~64 (2009)
- 김양현, "투입인력 기반 건설사업관리 대가산정 프로세스 개선방안", 석사, 건축공학, pp.2005
- 변분희, "소프트웨어 사업대가기준 보정계수의 유도 및 민감도 분석", 정보처리학회논문지D, 15(1), pp.61~72 (2008), 한국정보처리학회
- 농림축산식품부, "2013년도 농산어촌지역개발 사업 관계자 워크숍 자료", 3~28 (2013)
- 박경, "농촌발전을 위한 지역 역량강화 방안", 열린 충남, 통권 : 39, pp.33~57 (2007), 충남발전연구원
- 오승영, "농촌관광정책사업 마을리더의 핵심역량에 관한 실증 연구 : 농촌전통테마마을을 중심으로", 박사, 행정학, pp.2009
- 농어촌정비법 위탁요율 산정 연구, "이승택", 농업기반공사, ~ (2003)
- 이종용, "주요국 설비제공대가 산정방식에 대 한 사례 분석", 한국해양정보통신학회 춘계종합학술 대회, pp.565~568 (2004)
- 이주용, "자율적 농어촌지역개발사업 평가지표 연구", 박사, 지역건설환경공학, pp.2011
- 조상필, "농식품부 포괄보조사업 계획의 효율 적인 수립방안", 녹색전남, 통권 : 66, pp.84~103 (2010), 전남발전연구원
- 진경호, "설계 등 용역 사업의 실비정액가산방 식 도입현황", 건설관리, 10(1), pp.337~339 (2009)
- 허주열, "농촌마을종합개발사업에 있어서 주민참여 수준과 만족도에 관한 연구 : 경상북도 농촌마을종합개발사업 지구를 중심으로", 석사, 지역개발및부동산, pp.2009
- "30개 권역 기본계획서", ~