농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project

1

조회

0

다운로드

1

인용

0

참고문헌

키워드

주제분류농학

초록

After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Abstract

After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

참고문헌 (22)

  1. 조은정, "농촌 거점면 지역의 중심기능 이용성향 분석", 농촌계획, 15(4), pp.125~134 (2009), 한국농촌계획학회
  2. Choi, Y.W., "Designing Optimal Workload and Cost for Efficient Implementation of the Regional Community Reinforcement Project", pp.2015
  3. Kim, H.G., "Regional Unit Comprehensive Development Plan for Improving the Quality of Life in Rural Areas", pp.2013
  4. Kim, J.Y., "Local Activation and Cultivation of Small Towns, Urban Information Service", Urban Information Service, 249(1), pp.3~17 (2002), Korea Planning Association
  5. Kim, J.Y. et al., "Development Plan of Revitalization Policy of Rural Center according to Change of Policy Environment" (2010)
  6. "KRC"[URL]
  7. A Study on the Implementation Plan of Comprehensive Measures for Agriculture and Rural Areas, "KREI", ~ (2004)
  8. A Study on the Performance and Future Implementation Measures of Rural Settlement Region Development Project in Korea, "MAF.", ~ (2005)
  9. MAF., "Development Techniques for Rural Villages Renewal" (2007)
  10. MAFRA., "An Empirical Study on the Regeneration and Planning Techniques for Town Centers in Rural Areas" (2016)
  11. MAFRA, "2013 Rural Development Project Reference Material" (2013)
  12. MAFRA, "2015 Rural Development Project Presentation Document" (2013)
  13. A Study on the Activation Plan of Complete Region in Rural Development Project, "MAFRA", 25~26 (2014)
  14. MAFRA, "Rural Development Project Presentation Document" (2014)
  15. MAFRA, "Rural Development Project Presentation Document" (2015)
  16. 2019 Plan to Rural Development Project, "MAFRA", ~ (2017)
  17. MIFAFF, "2009-2014 Guidelines for the Implementation of the Agriculture, Forestry and Fisheries Projects"
  18. Song, M.R. et al., "Mapping Out a Policy Direction for the Development of "Basic Settlement Areas' Program" (2008)
  19. A Study on Policy Direction and Measures for Rural Central Places in Consideration of Transformation in National Spatial Structure, "Sung, J.I.", KREI, ~ (2008)
  20. Yu, J.K., "Agricultural and Rural Integrated Measures" (2004)
  21. Yu, S.K., "Achievements and Challenges of Korean Rural Development, KRC RRI", Rural and Environmental Engineering Joural, 98, pp.31~45 (2008)
  22. "8 study sites preliminary-master plan(Sangdong-myeon, Milyang-si; Sangmun-dong, Geoje-si; Burim-myeon, Uiryeong-gun; Donghae-myeon, Goseong-gun; Daebyeong-myeon, Hapcheon-gun; Dongbu-myeon, Geoje-si; Sangnam-myeon, Milyang-si; Hwajeong-myeon, Uiryeong-gun)", ~

관련 논문AI추천

이 간행물의 다른 논문 (13건)