보완 다중 활동 분석표와 시뮬레이션을 이용한 작업자 운영 전략 분석
Analysis of Workforce Scheduling Using Adjusted Man-machine Chart and Simulation
0
조회
0
다운로드
2
인용
0
참고문헌
키워드
초록
Determining the number of operators who set up the machines in a human-machine system is crucial for maximizing the benefits of automated production machines. A man-machine chart is an effective tool for identifying bottlenecks, improving process efficiency, and determining the optimal number of machines per operator. However, traditional man-machine charts are lacking in accounting for idle times, such as interruptions caused by other material handling equipment. We present an adjusted man-machine chart that determines the number of machines per operator, incorporating idleness as a penalty term. The adjusted man-machine chart efficiently deploys and schedules operators for the hole machining process to enhance productivity, where operators have various idle times, such as break times and waiting times by forklifts or trailers. Further, we conduct a simulation validation of traditional and proposed charts under various operational environments of operators’ fixed and flexible break times. The simulation results indicate that the adjusted man-machine chart is better suited for real-world work environments and significantly improves productivity.
Abstract
Determining the number of operators who set up the machines in a human-machine system is crucial for maximizing the benefits of automated production machines. A man-machine chart is an effective tool for identifying bottlenecks, improving process efficiency, and determining the optimal number of machines per operator. However, traditional man-machine charts are lacking in accounting for idle times, such as interruptions caused by other material handling equipment. We present an adjusted man-machine chart that determines the number of machines per operator, incorporating idleness as a penalty term. The adjusted man-machine chart efficiently deploys and schedules operators for the hole machining process to enhance productivity, where operators have various idle times, such as break times and waiting times by forklifts or trailers. Further, we conduct a simulation validation of traditional and proposed charts under various operational environments of operators’ fixed and flexible break times. The simulation results indicate that the adjusted man-machine chart is better suited for real-world work environments and significantly improves productivity.
참고문헌 (15)
- Álvarez, E., "Efficient shift scheduling with multiple breaks for full-time employees: A retail industry case", Computers & Industrial Engineering, 150 (2020)
- Asefeh, H. G., "novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines", Social and Behavioral Sciences, 62 (2012)
- Brann, D.B., "Human interaction with lights-out automation: A field study", Proceedings Third Annual Symposium on Human Interaction with Complex Systems, HICS’96, pp.276~283, IEEE
- Cheon, S. K., "Simulation Modeling of Automotive Componet Manufacturing Plant Using ARENA" (2004)
- Choi, K. S., "A Methodology for Productivity Improvement using Simulation Technique in Small and Medium Enterprise", Journal of Industrial Economics and Business, 24(4), pp.1969~1987 (2020)
- Kang, S. H., "Simulation-based scheduling for small-batch, multi-product production processes", pp.2021
- Kim, B. S., "A S simulation evaluation of aisle design and operation policies for an automated storage and retrieval system with narrow-", wide-width racks, 2023, pp.46(1), 68~75
- Kim, Y. B., "A study of ubiquitous-RTLS system for worker safety", The Journal of Korea Information and Communications Society, 37(1), pp.1~7 (2012)
- Moon, D.H., "A Case Study about a Man", Multiple Machine Working Analysis Using Simulation, 2003, pp.12(1), 21~34
- Oh, Y. G., "Modeling and Implementation of the Affordance-based Human-Machine Collaborative System", Journal of the Korean Institute of Industrial Engineering, 41(1), pp.34~42 (2015)
- Pandey, P., "Determining optimal workforce size and schedule at the retail store considering overstaffing and understaffing costs", Computers & Industrial Engineering, 161, pp.107656~ (2021)
- Shin, D., "Formal model of human material-handling tasks for control of manufacturing systems", IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, 36(4), pp.685~696 (2006)
- Tompkins, J. A., "Facilities Planning", pp.47~63 (2010), WILEY
- Turgut Aykin, "Optimal shift scheduling with multiple break windows", Management Science, 42(4), pp.591~602 (1996)
- Vineyard, M., "Failure rate distributions for flexible manufacturing systems : An empirical study", European Journal of Operational Research, 116(1), pp.139~155 (1999)
