이동식 목욕차량의 조립시스템에 대한 시뮬레이션 분석

A Simulation Analysis on the Assembly System of Mobile Bath Vehicles

0

조회

0

다운로드

1

인용

0

참고문헌

키워드

주제분류산업공학

초록

The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle’s top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system’s adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.

Abstract

The purpose of this study is to analyze the adequacy of production capacity of the assembly process system of mobile bath vehicle’s top box panel and process design through a simulation analysis. Towards this end, the layout of the facility designed with pre-verification job using a simulation modeling and an experiment, and facility, logistics process, and personnel input method were made into a simulation model, and the design system’s adequacy was evaluated through an experiment. To produce 120 mobile bath vehicles annually, it was analyzed that 14 general workers and seven skilled workers were adequate through the experiment. It was also identified that three painting process lines carried out through outsourcing were adequate. Production lead time was 201.7 hours on average and it was 230 hours maximum. To meet customer delivery service level of 95% within the deadline when establishing a customer order and vehicle delivery plan, it was analyzed that more than 215 hours of lead time is needed minimum. If the process cycle time is reduced to 85% upon system stabilization and skillfulness improvement, it was analyzed that annual output of 147 vehicles can be achieved without additional production line expansion.

참고문헌 (12)

  1. Drobouchevitch, I. G., "Throughput Optimization in Robot Cells with Input and Output Machine Buffers : A Comparative Study of Two Key Models", European Journal of Operational Research, 206, pp.623~633 (2010)
  2. Fowler, J.A., "Grand Challenges in Modeling and Simulation of Complex Manufacturing System", Simulation, 80(9), pp.469~476 (2004)
  3. Gultekin, H., "Scheduling in Three Machine Robotic Flexible Manufacturing Cell", Computers & Operations Rearch, 34, pp.2463~2477 (2007)
  4. Kim, W.C, "Introduction to Statistics", pp.105~128 (1995), Young-Ji Publication Company
  5. Krajewski, L.J., "Operation Management", pp.177~195 (2010), Prentice Hall Publication Company
  6. Lee, S.Y., "Reliability Engineering", pp.37~51 (1996), Hyung-sul Publication Company
  7. 문덕희, "3D 시뮬레이션을 활용한 렌즈모듈 자동화조립시스템 개발", 한국시뮬레이션학회 논문지, 16(2), pp.65~74 (2007), 한국시뮬레이션학회
  8. Savsar, M., "Modeling of Machine Failures in a Flexible Manufacturing Cell with Two machines Served by a Robot", Reliability Engineering and System Safty, 93, pp.1551~1562 (2008)
  9. "Simulation : The Practice of Model Development and Use Stewart Robinson", Warwick Business School
  10. Song, Y. J., "A Simulation Study for Evaluation of Alternative Plan and Making the Upper-limit ofr Improvement in productivity of Flow-shop with Considering a Work-wait Time", Journal of Korea Society for Simulation, 16(2), pp.63~73 (2007)
  11. "Witness Technology for Knowing, Training Manual", Dynamic soft, ~
  12. 윤정익, "FMC 반송용 로봇의 선견형 운영방법", 한국시뮬레이션학회 논문지, 17(4), pp.249~257 (2008), 한국시뮬레이션학회

관련 논문AI추천