자원배분 전략에 따른 국방핵심기술 과제 협약일정에 미치는 영향 분석

Analysis of the Impact of Resource Allocation Strategy on the Scheduling of Core Defense Technology Project Agreements

1

조회

0

다운로드

0

인용

0

참고문헌

키워드

주제분류산업공학

초록

There is a demand for introducing a challenging and innovative R&D system to develop new technologies to generate weapon system requirements. Despite the increasing trend in annual core technology development tasks, the infrastructure expansion, includ- ing personnel in research management institutions, is relatively insufficient. This situation continuously exposes difficulties in task planning, selection, execution, and management. Therefore, there is a pressing need for strategies to initiate timely research and development and enhance budget execution efficiency through the streamlining of task agreement schedules. In this study, we propose a strategic model utilizing a flexible workforce model, considering constraints and optimizing workload distribution through resource allocation to minimize bottlenecks for efficient task agreement schedules. Comparative analysis with the existing operational environment confirms that the proposed model can handle an average of 67 more core technology development tasks within the agreement period compared to the baseline. In addition, the risk management analysis, which considered the probabilistic uncertainty of the fluctuating number of core technology research and development projects, confirmed that up to115 core technology development can be contracted within the year under risk avoidance.

Abstract

There is a demand for introducing a challenging and innovative R&D system to develop new technologies to generate weapon system requirements. Despite the increasing trend in annual core technology development tasks, the infrastructure expansion, includ- ing personnel in research management institutions, is relatively insufficient. This situation continuously exposes difficulties in task planning, selection, execution, and management. Therefore, there is a pressing need for strategies to initiate timely research and development and enhance budget execution efficiency through the streamlining of task agreement schedules. In this study, we propose a strategic model utilizing a flexible workforce model, considering constraints and optimizing workload distribution through resource allocation to minimize bottlenecks for efficient task agreement schedules. Comparative analysis with the existing operational environment confirms that the proposed model can handle an average of 67 more core technology development tasks within the agreement period compared to the baseline. In addition, the risk management analysis, which considered the probabilistic uncertainty of the fluctuating number of core technology research and development projects, confirmed that up to115 core technology development can be contracted within the year under risk avoidance.

참고문헌 (19)

  1. Blazewicz, J., "Scheduling subject to resource constraints : Classification and complexity", Discrete Applied Mathematics, 5, pp.11~24 (1983)
  2. DAPA, "National Defense Research & Development Work Processing Guideline", ~ (2023)
  3. Gerard, C., "Matching supply with demand: An introduction to operations management" (2014), McGraw-Hill Custom Pub
  4. Gonen, A., "Simulation results on project completion time", PICMET'08-2008 Portland International Conference on Management of Engineering & Technology, pp.1462~1465 (2008), IEEE
  5. Hartmann, S., "An updated survey of variants and extensions of the resource-constrained project scheduling problem", European Journal of Operational Resear, 297(1), pp.1~14 (2022)
  6. Hartmann, S., "Project scheduling with resource capacities and requests varying with time: A case study", Flexible Services and Manufacturing Journal, 25(1-2), pp.74~93 (2013)
  7. Hopp, W. J., "Factory physics" (2011), Waveland Press
  8. KRIT, "Core Technology Research & Development Project Management Guideline", ~ (2022)
  9. KRIT, "Intoduction to Main business of Korea Research Insititute for defense Technology planning and advancement", ~ (2023)
  10. Budget System Improvement Plan To Enhance Defense R&D Effectiveness, "Lim, S. H.", KISTEP, ~ (2023)
  11. Naber, A., "MIP models for resourceconstrained project scheduling with flexible resource profiles", European Journal of Operational Research, 239(2), pp.335~348 (2014)
  12. Naber, A., "Resource-constrained project scheduling with flexible resource profiles in continuous time", Computers & Operations Research, 84, pp.33~45 (2017)
  13. Pritsker, A. A. B., "Multiproject scheduling with limited resources : A zero-one programming approach", Management Science, 16, pp.93~107 (1969)
  14. Republic of Korea, "Defense Science and Technology Innovation Promotion ACT, No. 17163", ~ (2020)
  15. Republic of Korea, "Enforcement Decree of The Defense Science and Technology Inovation Promotion ACT, No. 31557", ~ (2021)
  16. Republic of Korea, "National finance ACT, No. 31557", ~ (2023)
  17. Schwindt, C., "Handbook on project management and scheduling vol. 1" (2015), Springer International Publishing
  18. Schwindt, C., "Handbook on project management and scheduling, vol. 2" (2015), Springer International Publishing
  19. Stevenson, W. J., "Operations management", pp.182~ (2014), McGraw-Hill Education

관련 논문AI추천

이 간행물의 다른 논문 (20건)