본문 바로가기
KERD
논문KCI 등재

피치 루프 개별 게인 스케줄링 기법을 통한 타워 하중 저감 제어

Tower Load Reduction Control by Pitch Loop Individual Gain Scheduling

2

조회

0

다운로드

10

인용

0

참고문헌

키워드

주제분류기타공학

초록

This paper deals with the NREL(National Renewable Energy Laboratory) 5 MW reference wind turbine for offshore system. The controller which include MPPT(Maximum Power Point Tracking) control to recover the maximum energy from wind and pitch control to limit the power output is applied to wind turbine. Conventional pitch loops have used the same sensitivity scheduling to the P gain signal and I gain signal(CPS, Collective Pitch gain Scheduling). However, this technique only focuses on power control without considering the load on the wind turbine. In addition, the stability of the system can not be guaranteed since the pitch control loop has a low phase margin. Therefore, this paper proposes a technique, which applies gain scheduling individually to the P gain signal and the I gain signal(IPS, Individual Pitch gain Scheduling) for load reduction. To verify the effect, electrical power and tower root moment DEL(Damage Equivalent Load) were set as performance indices. Simulations were performed for 600 seconds under the wind conditions of the normal turbulence model, the turbulence intensity of16 % and the wind speeds of 12~25 m/s. . The proposed IPS technique was found to reduce the fore-aft moment DEL of the tower up to 14.49 % than the existing collective pitch scheduling.

Abstract

This paper deals with the NREL(National Renewable Energy Laboratory) 5 MW reference wind turbine for offshore system. The controller which include MPPT(Maximum Power Point Tracking) control to recover the maximum energy from wind and pitch control to limit the power output is applied to wind turbine. Conventional pitch loops have used the same sensitivity scheduling to the P gain signal and I gain signal(CPS, Collective Pitch gain Scheduling). However, this technique only focuses on power control without considering the load on the wind turbine. In addition, the stability of the system can not be guaranteed since the pitch control loop has a low phase margin. Therefore, this paper proposes a technique, which applies gain scheduling individually to the P gain signal and the I gain signal(IPS, Individual Pitch gain Scheduling) for load reduction. To verify the effect, electrical power and tower root moment DEL(Damage Equivalent Load) were set as performance indices. Simulations were performed for 600 seconds under the wind conditions of the normal turbulence model, the turbulence intensity of16 % and the wind speeds of 12~25 m/s. . The proposed IPS technique was found to reduce the fore-aft moment DEL of the tower up to 14.49 % than the existing collective pitch scheduling.

참고문헌 (25)

  1. Bossanyi, E. A., "The Design of Closed Loop Controllers for Wind Turbines", Wind Energy: An International Journal for Progress and Applications in Wind Power Conversion Technology, 3(3), pp.149~163 (2000)
  2. Fernando, D. B., "Wind Turbine Control Systems: Principles, Modelling and Gain Scheduling Design (Advances in Industrial Control)" (2006), Springer
  3. Nam, Y., "Control of Wind Turbine System Control" (2013), GS Intervision
  4. Shan, W., "Gain Scheduling Pitch Control for Fatigue Load Reduction for Wind Turbines" (2016), BoD-Books on Demand
  5. Kim, J., "Control System Design of a MW-Class PMSG-type Wind Turbine", Journal of Wind Energy, 1(1), pp.44~50 (2010)
  6. 김관수, "Design and Validation of Demanded Power Point Tracking Control Algorithm of Wind Turbine", International Journal of Precision Engineering and Manufacturing-Green Technology, 5(3), pp.387~400 (2018), 한국정밀공학회[DOI]
  7. Aeroelastic Simulation of Offshore Wind Turbines in the Frequency Domain, Energy Research Center of the Netherlands, Tech. Rep, "Savenije, F. J.", ~ (2009)
  8. Dunne, F., "Adding Feedforward Blade Pitch Control to Standard Feedback Controllers for Load Mitigation in Wind Turbines", Mechatronics, 22(4), pp.628~690 (2011)
  9. Im, C., "Feed Forward Control of the MW Wind Turbine", Journal of Wind Energy, 2(1), pp.82~89 (2011)
  10. Nam, Y., "LQR Control of Wind Turbine", Journal of Wind Energy, 2(1), pp.74~81 (2011)
  11. 김철진, "풍력터빈 타워 하중 저감을 위한 타워 댐퍼 게인스케줄링 알고리즘 설계", 한국태양에너지학회 논문집, 38(2), pp.1~13 (2018), 한국태양에너지학회[DOI]
  12. 라요한, "NREL 5MW 풍력터빈의 블레이드 하중 저감을 위한 개별피치제어", 대한기계학회논문집 A, 36(11), pp.1427~1432 (2012), 대한기계학회
  13. 남윤수, "NREL 5MW 풍력 터빈 타워의 기계적 하중 완화", 대한기계학회논문집 A, 36(11), pp.1455~1462 (2012), 대한기계학회
  14. 김관수, "중형 풍력터빈의 출력 및 타워 하중저감제어기 설계", 한국태양에너지학회 논문집, 36(6), pp.1~12 (2016), 한국태양에너지학회
  15. Im, C., "A Reduction Control of Tower Loads for NREL 5MW Wind Turbine", pp.2013
  16. Shan, W., "Gain Scheduling Pitch Control Design for Active Tower Damping and 3p Harmonic Reduction", European Wind Energy Conference and Exhibition (2012)
  17. 오용운, "Control Algorithm of a Floating Wind Turbine for Reduction of Tower Loads and Power Fluctuation", International Journal of Precision Engineering and Manufacturing, 16(9), pp.2041~2048 (2015), 한국정밀공학회
  18. Definition of a 5-MW Reference Wind Turbine for Offshore System Development, "Jonkman, J.", National Renewable Energy Laboratory, ~, pp.Technical Report No. NREL (2009), TP-500-38060
  19. Bossanyi, E. A., "GH Bladed User Manual" (2009), Garrad Hassan
  20. Manwell, J. F., "Wind Energy Explained Theory, Design and Application" (2010), John Wiley & Sons
  21. Cho, J., "The Effects of Torque Schedule and Pitch Loop Bandwidth Change on the Performance & Mechanical Load of MW Wind Turbine", pp.2012
  22. 남윤수, "NREL 5MW 풍력터빈의 제어시스템 설계", 한국태양에너지학회 논문집, 32(5), pp.31~40 (2012), 한국태양에너지학회
  23. Franklin, G. F., "Feedback Control of Dynamic Systems (Vol. 3)" (1994), Addison-Wesley
  24. International Electrotechnical Commission, "Wind Turbines Part 1: Design Requirements, IEC 61400-1 Ed. 3", ~ (2006)
  25. Sutherland, H. J., "On the Fatigue Analysis of Wind Turbines" (1999)

관련 논문AI추천

이 간행물의 다른 논문 (4건)