풍동시험을 활용한 10 MW급 부유식 해상풍력터빈 운송 및 설치 시 풍하중 예측
Wind load estimation of a 10 MW floating offshore wind turbine during transportation and installation by wind tunnel tests
1
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
As the generation capacity of floating offshore wind turbines increases, the wind load applied to each turbine increases. Due to such a high wind load, the capacity of transport equipment (such as tugboats or cranes) required in the transportation and installation phases must be much larger than that of previous small-capacity wind power generation systems. However, for such an important wind load prediction method, the simple formula proposed by the classification society is generally used, and prediction through wind tunnel tests or Computational Fluid Dynamics (CFD) is rarely used, especially for a concept or initial design stages. In this study, the wind load of a 10 MW class floating offshore wind turbine was predicted by a simplified formula and compared with results of wind tunnel tests. In addition, the wind load coefficients at each stage of fabrication, transportation, and installation are presented so that it can be used during a concept or initial design stages for similar floating offshore wind turbines.
Abstract
As the generation capacity of floating offshore wind turbines increases, the wind load applied to each turbine increases. Due to such a high wind load, the capacity of transport equipment (such as tugboats or cranes) required in the transportation and installation phases must be much larger than that of previous small-capacity wind power generation systems. However, for such an important wind load prediction method, the simple formula proposed by the classification society is generally used, and prediction through wind tunnel tests or Computational Fluid Dynamics (CFD) is rarely used, especially for a concept or initial design stages. In this study, the wind load of a 10 MW class floating offshore wind turbine was predicted by a simplified formula and compared with results of wind tunnel tests. In addition, the wind load coefficients at each stage of fabrication, transportation, and installation are presented so that it can be used during a concept or initial design stages for similar floating offshore wind turbines.
참고문헌 (12)
- "태풍 마이삭 강풍으로 양산 신불산 자락 풍력발전기1대 넘어져" (2020)[URL]
- Kim, C., "Wind Tunnel Test of the 2D Airfoil Turbine for the MW size Wind Turbine", Journal of Wind Energy, 2(2), pp.38~42 (2011)
- Ryu, K., "Wind Loads of 5MW Horizontal-Axis Wind Turbine Rotor in Parked Condition", Journal of the Wind Engineering Institute of Korea, pp.163~169 (2018)
- Korean Register, "Towing Survey of Barges and Tugboats (RB-12-K)", 7~8 (2022)
- Definition of the Semisubmersible Floating System for Phase II of OC4, "Robertson, A.", National Renewable Energy Laboratory, ~, pp.NREL (2014), TP-5000-60601
- Bak, C., "Design and performance of a 10 MW wind turbine", J. Wind Energy, 124 (2013)
- Müller, Kolja, "LIFES50+ D4.2: Public Definition of the Two LIFES50+ 10MW Floater Concepts", 8~9 (2018)
- Sim, I., "Experimental study on motions and towing stability of 10MW floating offshore wind turbine during transportation and installation in wind, wave and current conditions", International Journal of Naval Architecture and Ocean Engineering (2023)
- "MAS333" (2023)[URL]
- Abrahamsen, I. S., "Wind tunnel model testing of offshore platforms", Master, pp.2012
- Kim, Y., "Design and Performance Evaluation of Superstructure Modification for Air Drag Reduction of a Container Ship", Journal of the Society of Naval Architects of Korea, 52(1), pp.8~18 (2015)
- Jung, Youngin, "Wind Load and Flow Field Change with Respect to Various Configurations of a Drillship", Journal of the Society of Naval Architects of Korea, 52(3), pp.255~264 (2015)
