The purpose of this study is to present the problem and to improve the process of estimating the development gain of the structural enhancement project of industrial complexes. The current system is adopted as a development gain reinvestment by means of returning development gain. The two step procedures of estimating development gain as well as the profit of development between selling price and construction cost of the building are not obvious yet. This attempt is made to investigate problems aroused by five case studies. As a result, similar problems are proved. It is very difficult to exclude arbitrariness related to estimating profits from the sale of the building and total project costs by deducting the rise of land price due to land-use conversion. To reinforce the objectiveness in calculating development gain, the current procedure of estimation should be remedied. It is possible to simplify the current procedure by calculating development gain on the basis of one-time estimation of land profit only. It is expected to reduce the cost borne by developer and to resolve the ambiguity of calculating development gain.
Abstract
The purpose of this study is to present the problem and to improve the process of estimating the development gain of the structural enhancement project of industrial complexes. The current system is adopted as a development gain reinvestment by means of returning development gain. The two step procedures of estimating development gain as well as the profit of development between selling price and construction cost of the building are not obvious yet. This attempt is made to investigate problems aroused by five case studies. As a result, similar problems are proved. It is very difficult to exclude arbitrariness related to estimating profits from the sale of the building and total project costs by deducting the rise of land price due to land-use conversion. To reinforce the objectiveness in calculating development gain, the current procedure of estimation should be remedied. It is possible to simplify the current procedure by calculating development gain on the basis of one-time estimation of land profit only. It is expected to reduce the cost borne by developer and to resolve the ambiguity of calculating development gain.
참고문헌 (21)
- 권기철, "신도시 아파트 건설의 개발이익 분석에 관한 연구 : 분당신도시 사례를 중심으로", 박사, 지역개발, pp.2005
- 김윤상, "토지원리와 부동산 정책", 토지법학, (22), pp.231~258 (2006), 한국토지법학회
- 김정선, "부동산개발이익 환수부담금의 적합성평가", 박사, 부동산학, pp.2009
- 류해웅, "토지법제론" (2003), 부연사
- 박태원, "우리나라 산업단지 개발과정의 시계열 분류 및 특성 연구", 국토연구, 68통권 : 68, pp.99~120 (2011), 국토연구원
- 설지욱, "개발이익환수제도의 실효성 제고를 위한 연구 : 개발부담금제를 중심으로", 석사, 공법, pp.2007
- 이정전, "토지경제학" (1999), 남양문화사
- 국가균형발전을 위한 토지정책 방향에 관한 연구, "이정전", 한국토지공사, ~ (2005)
- 이차관, "부동산 개발이익 산정에 관한 연구 : 택지개발사업을 중심으로", 박사, 부동산학, pp.2008
- 김승종, "영국의 개발이익 환수제도에 관한 연구", 부동산연구, 15(1), pp.117~137 (2005), 한국부동산연구원
- 정희남, "일본과 영국의 개발이익환수제도" (2003), 국토연구원
- 정희남, "토지에 대한 개발이익 환수제도의 개편방안" (2003), 국토연구원
- 진정수, "開發利益의 發生規模와 影響要因 分析에 관한 硏究", 박사, 행정학, pp.1999
- 최완호, "공공가치의 실현을 위한 개발이익환수제도의 개선방안", 박사, 부동산학, pp.2011
- 하권찬, "산업단지 구조고도화사업에서의 민간참여 활성화 방안 연구", 도시행정학보, 25(2), pp.175~198 (2012), 한국도시행정학회
- 하권찬, "해외 산업단지 재정비사례 비교연구 -영국의 트래포드파크, 스페인의 포블레노우, 싱가포르 탕린홀트 사례를 중심으로-", 부동산연구, 22(1), pp.225~244 (2012), 한국부동산연구원
- 하영주, "개발이익환수제도의 위헌성에 관한 공법적 연구", 박사, 행정법, pp.2008
- "한국산업단지공단 종합국감 질의", ~ (2011)
- 황명찬, "개발이익의 사회적 환원", 도시문제, 15(6), pp.8~19 (1980), 대한지방행정공제회
- 홍준호, "산업단지 구조고도화 효율화 방안 사례연구", 한국도시설계학회 추계학술발표대회, pp.571~589 (2011), 한국도시설계학회
- 산업단지 구조고도화 사업의 효율적 추진 방안, "홍진기", 산업연구원, ~ (2008)