본문 바로가기
KERD
논문KCI 등재

Lean Manufacturing for Tsukiden Electronics Philippines, Inc.: a Six Sigma Approach

0

조회

0

다운로드

2

인용

0

참고문헌

키워드

초록

To remain competitive, manufacturing organizations like Tsukiden Electronics Philippines, Inc. (TEPI) has addressed productivity and efficiency goals through manufacturing waste elimination. In this case-experimental research for TEPI the paper proposes a process improvement technique for inventory management. Six Sigma methodology using Lean manufacturing tools were used to address the problem of TEPI in inventory management. Current state analysis and first level Pareto analysis revealed the highest contributor to the total loss of TEPI. Second level Pareto analysis showed that among the factors that contributed to losses, it was the missing/ uncounted parts that contributed the highest to the total losses. The Ishikawa diagram and why-why analysis revealed that almost all the problems that arise in TEPI’s inventory activities were caused by the inability of the operator to do multitasking, lack of visual display and parts’ sensitivity. Potential problems were identified using PFMEA and a control plan was made for inventory control using counter checker with proximity sensor and visual display to ensure the smooth flow of the processes.

Abstract

To remain competitive, manufacturing organizations like Tsukiden Electronics Philippines, Inc. (TEPI) has addressed productivity and efficiency goals through manufacturing waste elimination. In this case-experimental research for TEPI the paper proposes a process improvement technique for inventory management. Six Sigma methodology using Lean manufacturing tools were used to address the problem of TEPI in inventory management. Current state analysis and first level Pareto analysis revealed the highest contributor to the total loss of TEPI. Second level Pareto analysis showed that among the factors that contributed to losses, it was the missing/ uncounted parts that contributed the highest to the total losses. The Ishikawa diagram and why-why analysis revealed that almost all the problems that arise in TEPI’s inventory activities were caused by the inability of the operator to do multitasking, lack of visual display and parts’ sensitivity. Potential problems were identified using PFMEA and a control plan was made for inventory control using counter checker with proximity sensor and visual display to ensure the smooth flow of the processes.

참고문헌 (27)

  1. Matathil, A., "Reduction of scrap in an electronic assembly line using DMAIC approach", Sastech Journal, 11(2), pp.000~000 (2012)
  2. Berardinelli, C. F., "To DMAIC or not to DMAIC?", Quality Progress, 45(11), pp.72~ (2016)
  3. Brett, C., "Streamlining enterprise records management with lean six sigma", Information Management Journal, 39(6), pp.58~62 (2005)
  4. Brewer, P. C., "Using Six Sigma to improve the finance function : Here are some tips for success", Strategic Finance, 85(5), pp.27~33 (2005)
  5. Breyfogle III, F. W., "Implementing six sigma" (2003), John Wiley & Sons, Inc
  6. Canel, C., "Just-in-time is not just for manufacturing : a service perspective", Industrial Management & Data Systems, 100(2), pp.1~60 (2000)
  7. Carlson, C. S., "Which FMEA mistakes are you making?", Quality Progress, 47(9), pp.36~41 (2014)
  8. Deb, S. K., "Effects of lean tools in small scale enterprises", Drishtikon: A Management Journal, 2(1) (2010)
  9. Diaz, H. V. A., "Integration of knowledge management and change management to implement lean manufacturing" (2013), Hochschule Ansbach
  10. Estrada, A., "The audit answer", Quality Progress; Milwaukee, 45(6), pp.36~43 (2012)
  11. George, M. L., "Lean Six Sigma: Combining Six Sigma Quality and Lean Speed" (2002), The McGraw-Hill Companies, Inc
  12. Gupta, P., "Six sigma business scorecard" (2004), McGraw-Hill
  13. Gutierrez, H., "Control estadistico de calidad y seis sigma" (2006), McGraw-Hill
  14. Hines, P., "The seven value stream mapping tools", International Journal of Operations & Production Management, 17(1), pp.46~64 (1997)
  15. Hunter, S. L., "Lean production in the furniture industry : The double D assembly cell", Forest Products Journal, 54(4), pp.32~38 (2004)
  16. Imai, M., "Gemba Kaizen, a Common Sense, Low-Cost Approach to Management" (1997), McGraw-Hill, Inc.
  17. Kindlarski, E., "Ishikawa diagrams for problem solving", Quality Progress, 17(12), pp.26~ (1984)
  18. Linderman, K., "Six sigma : a goal-theoretic perspective", Journal of Operations Management, 21(2), pp.193~203 (2003)
  19. "The many sides of gemba walk" (2011)[URL]
  20. Melton, T., "The benefits of lean manufacturing; What lean thinking has to offer the process industries", Trans IChemE, Part A, Chemical Engineering Research and Design, 83(A6), pp.662~673 (2005)
  21. "Modeling lean six sigma in the small packaging industry in India" (2011)[URL]
  22. "Control plan" (2013)[URL]
  23. Snee, R., "When worlds collide : lean and six sigma", Quality Progress, 38(9), pp.63~ (2005)
  24. Talib, F., "Pareto analysis of total quality management factors critical to success for service industries", International Journal for Quality Research(IJQR), 4(2), pp.155~168 (2010)
  25. Thanki, S. J., "Status of lean manufacturing practices in Indian industries and government initiatives : a pilot study", Journal of Manufacturing Technology Management, 25(5), pp.655~675 (2014)
  26. Continuous Quality Improvement Based on Lean Six Sigma in Manufacturing Small and Medium Sized Enterprises, "Timans, J. W. J.", The University of Gronigen, ~ (2014)
  27. Womack, J. P., "The machine that changed the world", pp.11~ (1990), Rawson Associates

관련 논문AI추천

이 간행물의 다른 논문 (6건)