본문 바로가기
KERD
논문

Software for Simulating Open-pit Truck/Shovel Haulage Systems using Google Earth and GPSS/H

0

조회

0

다운로드

12

인용

0

참고문헌

키워드

주제분류자원공학

초록

This study presents new software, named Google Earth-based MIning SIMulation System(GEMISIMS), to simulate a truck/shovel haulage system in open-pit mines. System architecture using Google Earth, Keyhole Markup Language (KML), a modified least-cost path algorithm and the GPSS/H simulation language was suggested and used for the implementation of GEMISIMS. GEMISIMS allows users: (1) to determine optimal haulage routes of trucks between shovels and dumps(or ore stockpiles), (2) to optimize the number of trucks which will be allocated to each route and (3) to animate the movements of trucks using the 3D render window of Google Earth. This paper reports the concept and details of the software development and its application to an open-pit coal mine in Indonesia which revealed that GEMISIMS can support the better understanding of an open-pit truck/shovel haulage system.

Abstract

This study presents new software, named Google Earth-based MIning SIMulation System(GEMISIMS), to simulate a truck/shovel haulage system in open-pit mines. System architecture using Google Earth, Keyhole Markup Language (KML), a modified least-cost path algorithm and the GPSS/H simulation language was suggested and used for the implementation of GEMISIMS. GEMISIMS allows users: (1) to determine optimal haulage routes of trucks between shovels and dumps(or ore stockpiles), (2) to optimize the number of trucks which will be allocated to each route and (3) to animate the movements of trucks using the 3D render window of Google Earth. This paper reports the concept and details of the software development and its application to an open-pit coal mine in Indonesia which revealed that GEMISIMS can support the better understanding of an open-pit truck/shovel haulage system.

참고문헌 (43)

  1. Aksoy, M, "A computer program for open pit mine equipment selection: TruckMac", Mine Planning and Equipment Selection 2000, pp.493~503 (2000)
  2. Alarie, S., "Overview of solution strategies used in truck dispatching systems for open pit mines", International Journal of Surface Mining, Reclamation and Environment, 16(1), pp.59~76 (2002)
  3. Ballagh, L.M., "Representing scientific data sets in KML: methods and challenges", Computers & Geosciences, 37(1), pp.57~64 (2011)
  4. Blackwell, G.H., "Estimation of large open pit haulage truck requirements", CIM Bulletin, 92(1028), pp.143~149 (1999)
  5. Bonates, E.J.L., "Interactive truck haulage simulation program", Mine Planning and Equipment Selection 1996, pp.51~57 (1996)
  6. Boulos, M.N.K., "Web GIS in practice III: creating a simple interactive map of England's strategic health authorities using Google Maps API, Google Earth KML, and MSN Virtual Earth Map Control", International Journal of Health Geographics, 4(1), pp.22~ (2005)
  7. Chen, A., "Visualization of A-Train vertical profiles using Google Earth", Computers & Geosciences, 35(2), pp.419~427 (2009)
  8. Chien, N.Q., "Google Earth as a tool in 2-D hydrodynamic modeling", Computers & Geosciences, 37(1), pp.38~46 (2011)
  9. 최요순, "노천 채광장의 적재-운반 작업을 위한 시뮬레이션 소프트웨어 개발", 한국지구시스템공학회지, 48(4), pp.448~459 (2011), 한국지구시스템공학회
  10. Choi, Y., "Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm", AUTOMATION IN CONSTRUCTION, 20(7), pp.982~997 (2011), ELSEVIER SCIENCE BV
  11. 최요순, "대규모 노천광산의 채굴적 하단 저수지 설계를 위한 GIS 모델링", 한국지구시스템공학회지, 48(2), pp.165~177 (2011), 한국지구시스템공학회
  12. 최요순, "광해방지를 위한 대규모 석탄 노천광의 배수설계 최적화", 한국지구시스템공학회지, 43(5), pp.429~438 (2006), 한국지구시스템공학회
  13. Choi, Y., "Flood and gully erosion problems at the Pasir open pit coal mine, Indonesia: A case study of the hydrology using GIS", Bulletin of Engineering Geology and the Environment, 67(2), pp.251~258 (2008), Springer Verlag
  14. Choi, Y., "Multi-criteria evaluation and least-cost path analysis for optimal haulage routing of dump trucks in large scale open-pit mines", INTERNATIONAL JOURNAL OF GEOGRAPHICAL INFORMATION SCIENCE, 23(12), pp.1541~1567 (2009), TAYLOR FRANCIS LTD
  15. 최요순, "인도네시아 파시르 석탄 노천광산의 사면붕괴 위험도 평가를 위한 퍼지 이론과 계층분석절차 기법의 적용", 한국지구시스템공학회지, 46(1), pp.45~60 (2009), 한국지구시스템공학회
  16. 최요순, "노천광산의 관측점 선정 및 운반도로 가시거리 안전성 평가를 위한 GIS기반 가시구역 분석기법의 적용", 한국지구시스템공학회지, 45(3), pp.265~275 (2008), 한국지구시스템공학회
  17. 최요순, "대규모 노천광산의 운반 효율성 향상을 위한 덤프트럭의 최적 운반경로 분석", 한국지구시스템공학회지, 44(6), pp.477~491 (2007), 한국지구시스템공학회
  18. De Paor, D.G., "Geological and geophysical modeling on virtual globes using KML, COLLADA, and Javascript", Computers & Geosciences, 37(1), pp.100~110 (2011)
  19. Dijkstra, E.W., "A note on two problems in connection with graphs", Numerische Mathmatik, 1, pp.269~271 (1959)
  20. Ercelebi, S.G., "Optimization of shovel-truck system for surface mining", The Journal of the Southern African Institute of Mining and Metallurgy, 109, pp.433~439 (2009)
  21. Hauck, R.F., "Computer-controlled truck dispatching in open-pit mines, in Computer Methods for the 80's in the Mineral Industry", pp.735~742 (1979), Society of Mining Engineers of the American Institute of Minning, Metallurgical, and Petroleum Engineers
  22. Krause A., "Modelling open pit shovel-truck systems using the machine repair model", The Journal of the Southern African Institute of Mining and Metallurgy, 107, pp.469~476 (2007)
  23. Newman, A.M., "A review of operations research in mine planning", Interfaces, 40(3), pp.222~245 (2010)
  24. Niemann-Delius, C., "Computeraided simulation of loading and transport in medium and small scale surface mines", Mine Planning and Equipment Selection 2004, pp.579~584 (2004), Taylor & Francis Group
  25. Nieto, A., "Real time assisted driving in open pit mining operations using Google Earth", SME Mining Engineering, 62(2), pp.21~26 (2010)
  26. Oraee, K, "Fuzzy model for truck allocation in surface mines", Mine Planning and Equipment Selection 2004, pp.585~591 (2004), Taylor & Francis Group
  27. Osanloo, M., "Long-term open pit mine production planning: A review of models and algorithms", International Journal of Mining, Reclamation and Environment, 22(1), pp.3~35 (2008)
  28. Patterson, T. C., "Google Earth as a (not just) geography education tool", Journal of Geography, 106(4), pp.145~152 (2007)
  29. Postpischl, L., "Standardization of seismic tomographic models and earthquake focal mechanisms data sets based on web technologies, visualization with keyhole markup language", Computers & Geosciences, 37(1), pp.47~56 (2011)
  30. Sheppard, S.R.J., "The ethics of Google Earth: crossing thresholds from spatial data to landscape visualization", Journal of Environmental Management, 90(6), pp.2102~2117 (2009)
  31. Sturgul, J.R., "History of simulation in mining: 1961-1995", Proceedings of the First Internet Symposium on Mine Simulation via the Internet (1996)
  32. Sun, E., "GPS and Google Earth based 3D assisted driving system for trucks in surface mines", Mining Science and Technology, 20(1), pp.138~142 (2010)
  33. Sun, E., "An integrated information technology assisted driving system to improve mine trucks-related safety", Safety Science, 49(10), pp.1490~1497 (2010)
  34. Temeng, V.A., "A Computerized Model for Truck Dispatching in Open Pit Mines", 박사, pp.1997
  35. Tomaszewski, B., "Situation awareness and virtual globes: applications for disaster management", Computers & Geosciences, 37(1), pp.86~92 (2011)
  36. Topuz, E., "A survey of operations research applications in the mining industry", CIM Bulletin, 82(925), pp.48~50 (1989)
  37. Webley, P.W., "Virtual Globe visualization of ash-aviation encounters, with the special case of the 1989 Redoubt-KLM incident", Computers & Geosciences, 37(1), pp.25~37 (2011)
  38. Wernecke, J., "The KML handbook: Geographic visualization for the web", pp.368~ (2009), Addison-Wesley
  39. "OGC® KML, Open Geospatial Consortium, Document OGC 07-147r2" (2008)[URL]
  40. Wright, T.E., "Visualising volcanic gas plumes with virtual globes", Computers & Geosciences, 35(9), pp.1837~1842 (2009)
  41. Yamagishi, Y., "Visualization of geoscience data on Google Earth: development of a data converter system for seismic tomographic models", Computers & Geosciences, 36(3), pp.373~382 (2010)
  42. Yan, S., "An optimal scheduling model for ready mixed concrete supply with overtime considerations", Automation in Construction, 16(6), pp.734~744 (2007)
  43. Zhang, H., "Multi-objective simulation-optimization for earthmoving operations", Automation in Construction, 18(1), pp.79~86 (2008)

관련 논문AI추천

이 간행물의 다른 논문 (13건)