Outfittings of offshore plants and high value-added vessels, such as FPSO, drillship, are much more than outfittings of general ships. So the complexity of the outfittings is increased and the importance of outfittings has also increased. But, there is no clear method to define the installation sequence of outfittings, yet. In this study, we developed the algorithm to define the installation sequence of outfittings by applying variables and constraints related to outfitting, such as process parameters, weighting coefficients, installation constraints. Also, we developed the application that applied the algorithm and compared cases by changing the weighting coefficients of process parameters. We verified the practicality of the algorithm by developing the application. The results of this study are that the accuracy of the outfitting planning is improved and efficient lead time can be predicted by defining the installation sequence of outfittings.
Abstract
Outfittings of offshore plants and high value-added vessels, such as FPSO, drillship, are much more than outfittings of general ships. So the complexity of the outfittings is increased and the importance of outfittings has also increased. But, there is no clear method to define the installation sequence of outfittings, yet. In this study, we developed the algorithm to define the installation sequence of outfittings by applying variables and constraints related to outfitting, such as process parameters, weighting coefficients, installation constraints. Also, we developed the application that applied the algorithm and compared cases by changing the weighting coefficients of process parameters. We verified the practicality of the algorithm by developing the application. The results of this study are that the accuracy of the outfitting planning is improved and efficient lead time can be predicted by defining the installation sequence of outfittings.
참고문헌 (8)
- 함동균, "해양플랜트 의장품 조달관리를 위한 배관 공정 리드타임 예측 모델에 관한 연구", 대한조선학회 논문집, 53(1), pp.29~36 (2016), 대한조선학회
- Hong, Y.G., "Generation of erection sequence In shipbuilding process planning", Journal of the Korean institute of Industrial Engineers, 10(1), pp.189~207 (1997)
- Kim, J.H., "A study on the methodology in assembly sequence for offshore plant topside spool", 2016 Spring Proceedings of Korean Institute of Industrial Engineers, pp.535~540 (2016)
- A proposal for offshore plant of Korea resource development, "Korea Energy Economics Institute", KEEI, ~ (2015)
- "The three heavy industries operating loss sharply" (2015)[URL]
- Rose, C, "Definition of ship outfitting as a resource availability cost problem and development of a heuristic solution", Journal of Ship Production and Design, 32(3), pp.154~165 (2015)
- Seo, J.Y., "Assembly sequence planning for ship and offshore structures considering welding distortion", Master, pp.2015
- Yan, W., "Automatic generation of assembly sequence for the planning of outfitting processes in shipbuilding", Journal of Ship Production and Design, 28(2), pp.49~59 (2012)