A Study on Main Factor for Improving the Mongolian Railway Industry: Using the Analytic Hierarchy Process(AHP)
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
This study evaluated the operation of Mongolia's railway sector, and the factors necessary for further improvement were studied. The research methodology used AHP (Analytic Hierarchy Process) and analyzed the factors affecting railway operation based on previous research. Four major factors were reviewed as major variables: logistics, infrastructure, operation, and cost, and 12 sub-factors related to these were selected. As a result of the research, effective cost management is an essential factor for the railway industry of Mongolia, and it is necessary to create competitiveness because it reduces costs and improves pricing policy. The cost criterion emphasizes ‘Operation cost’ as paramount(global weight 0.129, rank 1), while ‘Transportation cost’ and ‘Maintenance cost’ follow, holding ranks 5 and 4, respectively. The infrastructure category highlights ‘Transshipment and handling facilities’ as critical factors (global weight 0.120, rank 2). Followed closely by ‘Railway Infrastructure’ is showed (global weight 0.092, rank 3). Improvement of the railway infrastructure was found to be the following sub-important thing, and it was proved that the railway infrastructure's age and Mongolia's rolling stock affect the operation's profitability. For development, it is necessary to upgrade and modernize the infrastructure of the railways so that trains can be safe, fast, and reliable. Within the logistical criterion, ‘Multi-modal transportation connectivity’ and ‘Possibility of creating and developing rail’ are significant, with global weights of 0.064 and 0.075, respectively, and ranked 10th and 8th. Integrating transport links into a single rail, road, air, and sea transport network will allow the integrated cargo logistics to move smoothly and reduce transit time. Finally, operational efficiencies through streamlined processes such as customs clearance and shipping improve service availability and customer satisfaction and reduce delays and errors.
Abstract
This study evaluated the operation of Mongolia's railway sector, and the factors necessary for further improvement were studied. The research methodology used AHP (Analytic Hierarchy Process) and analyzed the factors affecting railway operation based on previous research. Four major factors were reviewed as major variables: logistics, infrastructure, operation, and cost, and 12 sub-factors related to these were selected. As a result of the research, effective cost management is an essential factor for the railway industry of Mongolia, and it is necessary to create competitiveness because it reduces costs and improves pricing policy. The cost criterion emphasizes ‘Operation cost’ as paramount(global weight 0.129, rank 1), while ‘Transportation cost’ and ‘Maintenance cost’ follow, holding ranks 5 and 4, respectively. The infrastructure category highlights ‘Transshipment and handling facilities’ as critical factors (global weight 0.120, rank 2). Followed closely by ‘Railway Infrastructure’ is showed (global weight 0.092, rank 3). Improvement of the railway infrastructure was found to be the following sub-important thing, and it was proved that the railway infrastructure's age and Mongolia's rolling stock affect the operation's profitability. For development, it is necessary to upgrade and modernize the infrastructure of the railways so that trains can be safe, fast, and reliable. Within the logistical criterion, ‘Multi-modal transportation connectivity’ and ‘Possibility of creating and developing rail’ are significant, with global weights of 0.064 and 0.075, respectively, and ranked 10th and 8th. Integrating transport links into a single rail, road, air, and sea transport network will allow the integrated cargo logistics to move smoothly and reduce transit time. Finally, operational efficiencies through streamlined processes such as customs clearance and shipping improve service availability and customer satisfaction and reduce delays and errors.
참고문헌 (20)
- Azadeh, A., "Integration of DEA and AHP with computer simulation for railway system improvement and optimization", Applied Mathematics and Computation, 195(2), pp.775~785 (2008)
- Byambaa, J., "A study on major factors for building hinterland of international airport in landlocked country : Case of Chinggis Khaan Airport", Korea Production and Operation Management Society, 34(4), pp.535~549 (2023)
- Cheng, Y. H., "An analysis of developing logistics strategy of conventional railway company : A case study of Taiwan railway administration", Journal of the Eastern Asia Society for Transportation Studies, 6, pp.385~397 (2005)
- Eldev-Ochir, E., "Logistics and transport challenges in Mongolia", The Northeast Asian Economic Review, 4(2), pp.21~36 (2016)
- Eukhtuya, D., "A study on factors for selecting location of urban consolidation center considering sustainability-Case of Ulaanbaatar Mongolia", Korea Logistics Review, 29(6), pp.13~23 (2019)
- Gansukh, U., "Analysis of the current situation of Mongolian railway and its future development", International Business Research, 11(5), pp.119~128 (2018)
- Goepel, K. D., "Implementation of an online software tool for the analytic hierarchy process (AHP-OS)", International Journal of the Analytic Hierarchy Process, 10(3), pp.469~487 (2018)
- Khaing, E. M., "AHP Analysis research to improve the Busan port ship supplies industry", Journal of Korea Port Economic Association, 40(2), pp.21~38 (2024)
- Kim, D. H., "A study on airport railroad operating improvement item of evaluation and application (Focusing on the Tools of AHP)", Proceedings Korea Railway Society Fall Conference in 2015, pp.1605~1611 (2015)
- Ministry of Road Transport, "Yearly statistics of transportation of Mongolia", ~ (2023)
- Mlinarić, T. J., "Evaluation framework for key performance indicators of railway ITS", Promet-Traffic & Transportation, 30(4), pp.491~500 (2018)
- Mohajeri, N., "Railway station site selection using analytical hierarchy process and data envelopment analysis", Computers & Industrial Engineering, 59(1), pp.107~114 (2010)
- Montesinos-Valera, J., "Selection of maintenance, renewal, and improvement projects in rail lines using the analytic network process", Structure and Infrastructure Engineering, 13(11), pp.1476~1496 (2017)
- Nasanjargal, K., "Tianjin port-hinterland connectivity to Mongolia: challenges and strategies", International Journal for Developing Country Studies, 8(3), pp.71~78 (2018)
- National Statistics Office of Mongolia, "Statistical Yearbook", ~ (2023)
- Nguyen, T. T., "The priorities of influencing determinants for dry port competitiveness in the north and the south of Vietnam–An AHP and IPA approach", International Journal of e-Navigation and Maritime Economy, 17, pp.026~035 (2017)
- Saaty, T. L., "Decision-making with the AHP : Why is the principal eigenvector necessary", European Journal of Operational Research, 145(1), pp.85~91 (2003)
- Saaty, T. L., "Decision making-the analytic hierarchy and network processes (AHP", ANP), 2004, pp.13, 1~35
- Song, L., "Using an AHP-ISM-based method to study the vulnerability factors of urban rail transit system", Sustainability, 9(6), pp.1065~ (2017)
- Tsegmid, M., "A study on the competitive factors for dry ports in Mongolia using AHP and IPA-focusing on the comparative analysis between northern and southern regions-", Master, Department of Trade, pp.2023
