유속계 심해계류 준비 및 유속계 회수 실패원인에 관한 고찰
Consideration on the Preparation of Current Meters for Deep-sea Mooring and Cause of Mooring Recovery Failures
2
조회
0
다운로드
1
인용
0
참고문헌
키워드
초록
An interest in deep-sea measurements has been gradually increased in association with global warming and the need for deep-sea resources development. Long-term mooring of current meters has been recently conducted primarily for these purposes. In general, current meters equipped on a mooring line are deployed and recovered for a planned period in the sea. This paper describes all the preparations for deepsea mooring. It also reviews the possible causes of the failures of recovery, which occasionally happens in the sea.
Abstract
An interest in deep-sea measurements has been gradually increased in association with global warming and the need for deep-sea resources development. Long-term mooring of current meters has been recently conducted primarily for these purposes. In general, current meters equipped on a mooring line are deployed and recovered for a planned period in the sea. This paper describes all the preparations for deepsea mooring. It also reviews the possible causes of the failures of recovery, which occasionally happens in the sea.
참고문헌 (7)
- 石井秀夫, "海流計測用海中ブイの設計及び取扱いに關する覺書", 九州大學校 應用力學硏究所報, 56, pp.101~119 (1982)
- 崎高茂, "單点繫留式海中ブイの2次元靜的計算法", 九州大學校 應用力學硏究所報, 56, pp.121~131 (1982)
- 황상철, "해류계 계류에 의한 해류관측: 전해계류", 바다, 7(4), pp.7~303 (2002), 한국해양학회
- 황상철, "1986년 동해심층해류 관측을 위한 유속계 계류보고", Ocean Res, 8(2), pp.63~74 (1986)
- Operating Manual. Aanderaa Instruments, "Aanderaa Instruments", Bergen. Technical Description, ~ (1993)
- Berteaux, H.O., "Buoy Engineering", John Wiley & Sons
- The Crosby Group, "General catalog: Blocks & fittings for wire rope & chain", pp.53~55 (1995), The Crosby Group
