Study for Operation Method of Underwater Cable and Pipeline Burying ROV Trencher using Barge and Its Application in Real Construction
0
조회
0
다운로드
3
인용
0
참고문헌
키워드
초록
We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.
Abstract
We developed a heavy-duty work class ROV trencher named URI-T (Underwater robot it’s trencher) that can conduct burial and maintenance tasks for underwater cables and small diameter pipelines. It requires various supporting systems, including a dynamic positioning (DP) vessel, launch and recovery system (LARS), A-frame, and winch in order to perform burial tasks because of its dimensions (6.5 m × 5.0 m × 4.5 m, 20 t) and the tough working environment. However, operating a DP vessel has disadvantages as it is expensive to rent and operate and it is difficult to adjust the working schedule for some domestic coast construction cases. In this paper, we propose a method using a barge instead of a DP vessel to avoid the above disadvantages. Although burying the cable and pipeline using a barge has lower working efficiency than a DP vessel, it can save construction expenses and does not require a large crew. The proposed method was applied over two months at the construction of the water supply in Yokji-do, and the results were verified.
참고문헌 (8)
- 안승환, "해양환경특성에 따른 해저케이블 설치 및 보호방안", 해양환경안전학회지, 15(1), pp.25~32 (2009), 해양환경안전학회
- 조건래, "URI-T, 해저 케이블 매설용 ROV의 선수각 제어 및 실해역 검증", 한국해양공학회지, 33(2), pp.178~188 (2019), 한국해양공학회[DOI]
- 조건래, "해저 케이블 매설 로봇의 수중 매니퓰레이션을 위한 터치스크린 기반 원격 조종 어시스턴스 기술 개발", 한국정밀공학회지, 36(4), pp.349~361 (2019), 한국정밀공학회[DOI]
- Jang, I. -S., "Reporting: Korea Institute Ocean Science &Technology Underwater Construction Robotics R&D Center", Magazine of the Korean Society of Steel Construction, 26(2), pp.84~85 (2014)
- Jones, M., "A Novel ROV Developed for the Future Requirements of Cable Installation and Maintenance", Proceedings of Sub Optic 2001, pp.T6.3.4~ (2001)
- 강형주, "URI-T, 해저 케이블 매설용 ROV 트렌처 개발 및 실해역 성능 검증", 한국해양공학회지, 33(3), pp.300~311 (2019), 한국해양공학회[DOI]
- Li, J. H., "Conceptual Design of Optimal Thrust System for Efficient Cable Burying of ROV Trencher", 2014 Oceans-St. John's, IEEE (2014)
- 유재덕, "동아시아횡단 해저케이블 고장분석을 통한 보호방안", 한국전자통신학회 논문지, 5(3), pp.227~232 (2010), 한국전자통신학회