원전 중대사고 시 WinMACCS와 RASCAL 전산코드를 이용한 소외 사고결말평가
Off-site Consequence Analysis of Nuclear Power Plant Severe Accident Using WinMACCS and RASCAL Computer Codes
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
After the Fukushima nuclear power plant accident in March 2011, the importance ofevaluating the consequence of the accident is increasing. Accordingly, in South Korea, the law onsubmission of accident management plans including severe accidents was revised in June 2016 toassess accident management capability through probabilistic safety assessment. In this study, werecognized the necessity of verifying the results of the level 3 probabilistic safety assessment andcompared the accident consequence through probabilistic and deterministic methods to confirmthe similarity. In this study, the offsite accident consequence was evaluated for the severe accidentscenario of the US Surry nuclear power plant. For each accident scenario, the radiation source termand the meteorological data of the site of Surry nuclear power plant were used. For the probabilisticconsequence assessment, the WinMACCS computer code was used. For the deterministicconsequence assessment, the RASCAL computer code was used. As a result of the offsiteconsequence assessment, the ratio of the result of the RASCAL computer code to the WinMACCScomputer code was evaluated. In the case of LTSBO, it was 0.53~4.24 times. In the case of STSBO,it was 0.57~3.73 times. In the case of ISLOCA, it was 0.24~2.39 times. In the case of TISGTR, itwas 0.16~1.08 times. These differences were due to the differences in the radiation source term,meteorological data, and exposure modeling methods. The results of offsite consequence assessmentwere evaluated at the same order. It was 0.16 times in minimum, 4.24 times in maximum. Therefore,it is expected that the validity and reliability of probabilistic safety assessment can be judgedeconomically. The results of this study can be used as a basis for establishing a domestic level 3probabilistic safety assessment system.
Abstract
After the Fukushima nuclear power plant accident in March 2011, the importance ofevaluating the consequence of the accident is increasing. Accordingly, in South Korea, the law onsubmission of accident management plans including severe accidents was revised in June 2016 toassess accident management capability through probabilistic safety assessment. In this study, werecognized the necessity of verifying the results of the level 3 probabilistic safety assessment andcompared the accident consequence through probabilistic and deterministic methods to confirmthe similarity. In this study, the offsite accident consequence was evaluated for the severe accidentscenario of the US Surry nuclear power plant. For each accident scenario, the radiation source termand the meteorological data of the site of Surry nuclear power plant were used. For the probabilisticconsequence assessment, the WinMACCS computer code was used. For the deterministicconsequence assessment, the RASCAL computer code was used. As a result of the offsiteconsequence assessment, the ratio of the result of the RASCAL computer code to the WinMACCScomputer code was evaluated. In the case of LTSBO, it was 0.53~4.24 times. In the case of STSBO,it was 0.57~3.73 times. In the case of ISLOCA, it was 0.24~2.39 times. In the case of TISGTR, itwas 0.16~1.08 times. These differences were due to the differences in the radiation source term,meteorological data, and exposure modeling methods. The results of offsite consequence assessmentwere evaluated at the same order. It was 0.16 times in minimum, 4.24 times in maximum. Therefore,it is expected that the validity and reliability of probabilistic safety assessment can be judgedeconomically. The results of this study can be used as a basis for establishing a domestic level 3probabilistic safety assessment system.
참고문헌 (22)
- 원자력안전위원회, "사고관리계획서 작성방법에 관한 규정", 원자력안전위원회고시 제 2016-3호, ~ (2016)
- 이관엽, "MACCS2 코드를 이용한 연구용원자로 ‘하나로’ 설계기준사고시 비상대응조치 효과분석", 방사선방어학회지, 39(2), pp.109~117 (2014), 테스트학회[DOI]
- 전호준, "MACCS II 코드를 이용한 국내 경수로 및 중수로형 원전의 소외결말분석", 한국안전학회지, 26(5), pp.105~109 (2011), 한국안전학회
- Haste T, "MELCOR", MACCS simulation of the TMI-2 severe accident and initial recovery phases, off-site fission product release and consequences, 2005, pp.236(10), 1099~1112
- Recommendations of the international commission on radiological protection, "ICRP", ICRP, ~, pp.ICRP Publication 26 (1977)
- Recommendations of the international commission on radiological protection, "ICRP", ICRP, ~, pp.ICRP Publication 60 (1990)
- Conversion coefficients for use in radiological protection against external radiation, "ICRP", ICRP, ~, pp.ICRP Publication 74 (1996)
- Josip V, "Radiation doses estimation for hypothetical NPP Krško Accidents Without And With PCFV Using RASCAL Software", ~ (2014)
- MELCOR accident consequence code system (MACCS), "NRC", ~, pp.NUREG (1990), CR-4691
- Severe accident risks: an assessment for five U.S. nuclear power plants, "NRC", ~, pp.NUREG-1150 (1990)
- NRC, "Code manual for MACCS2: volume 2, preprocessor codes COMIDA2, FGRDCF, IDCF2", NUREG, 1998
- NRC, "WinMACCS, a MACCS2 interface for calculating health and economic consequences from accidental release of radioactive materials into the atmosphere", ~ (2007)
- RASCAL 4: Description of models and methods, "NRC", ~, pp.NUREG-1940 (2012)
- State-of the-art reactor consequence analyses (SOARCA) Report, "NRC", NUREG, ~ (2012)
- State-of-the-art reactor consequence analyses project volume 1: Peach bottom integrated analysis(vol. 1), "NRC", NUREG, ~, pp.NUREG (2013), CR-7110
- State-of-the-art reactor consequence analyses project volume 2: Surry integrated analysis (vol. 2), "NRC", NUREG, ~, pp.NUREG (2013), CR-7110
- MACCS best practices as applied in the state of the art reactor consequence analyses (SOARCA) project, "NRC", ~, pp.NUREG-7009 (2014)
- RASCAL 4.3: Description of models and methods, "NRC", ~, pp.NUREG-1940 Supplement 1 (2015)
- Rocchi F, "Evaluation of the Fukushima accident source term throught the fast running code RASCAL 4.2: Methods & Results", ~ (2014)
- Sahin S, "Emergency planning zones estimation for Karachi-2 and Karachi-3 nuclear power plants using Gaussian puff model", Sci. Technol. Nucl. Install, 2016(1), pp.1~8 (2016)
- Salem EF, "Assessment of offsite consequences due to severe nuclear accident according to release pathway reduction mechanisms using computer code", Int. J. Sci. Qual. Anal, 2(2), pp.19~23 (2016)
- Borhan Uddin Gazi Muhammad, "Nuclear Emergency Management using Accident Consequence Analysis Code", 한국방재학회논문집, 19(4), pp.215~225 (2019), 한국방재학회[DOI]
