This study was conducted to analyze the characteristics of three high-exposure tasks performed byradiation workers in Korean pressurized water reactors (PWRs) and to identify factors that reduce their exposureduring work. Three high-exposure tasks were selected based on a previous study. In this previous study, nozzle daminstallation and removal, eddy current testing, and manway opening and closing were determined as high-exposuretasks through normalization (radiation dose per unit time). Based on the analysis of the characteristics of the highexposuretasks in this study, the high-exposure tasks were steam generator-related tasks performed inside and outsidethe water chamber. This study analyzed the reduction factors for high-exposure tasks and suggested improvements interms of time, distance, and shielding. The use of the characteristics of high-exposure tasks and their dose reductionfactors enables Korean PWRs to optimize radiation protection for workers who receive relatively high doses.
Abstract
This study was conducted to analyze the characteristics of three high-exposure tasks performed byradiation workers in Korean pressurized water reactors (PWRs) and to identify factors that reduce their exposureduring work. Three high-exposure tasks were selected based on a previous study. In this previous study, nozzle daminstallation and removal, eddy current testing, and manway opening and closing were determined as high-exposuretasks through normalization (radiation dose per unit time). Based on the analysis of the characteristics of the highexposuretasks in this study, the high-exposure tasks were steam generator-related tasks performed inside and outsidethe water chamber. This study analyzed the reduction factors for high-exposure tasks and suggested improvements interms of time, distance, and shielding. The use of the characteristics of high-exposure tasks and their dose reductionfactors enables Korean PWRs to optimize radiation protection for workers who receive relatively high doses.
참고문헌 (20)
- "Nuclear Power Plant Status" (2023)[URL]
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2013)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2014)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2015)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2016)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2017)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2018)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2019)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2020)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2021)
- Annual Report of Occupational Exposure in Nuclear Power Plants, "Korea Hydro and Nuclear Power", KHNP, ~ (2022)
- Song C, "High-radiation-exposure work in Korean pressurized water reactors", Nuclear Engineering and Technology (2024)[DOI]
- Development of Occupational Radiation Exposure Reduction Technology at Nuclear Power Plant, "Korea Hydro and Nuclear Power", KHNP, ~ (2005)
- Radiation Exposure Analysis Report, "Korea Electric Power Corporation", KEPCO KPS, ~ (2022)
- Lee DH, "Managerial Factors Influencing Dose Reduction of the Nozzle Dam Installation and Removal Tasks Inside a Steam Generator Water Chamber", J Ergon Soc Korea, 36(5), pp.559~568 (2017)[DOI]
- Kim HG, "An Effects of Radiation Dose Assessment for Radiation Workers and the Member of Public from Main Radionuclides at Nuclear Power Plants", Journal of Radiation Protection, 35(1), pp.12~20 (2010)
- Kim GH, "Selection of the Most Appropriate Two-Dosemeter Algorithm for Estimating Effective Dose Equivalent during Maintenance Periods in Korean Nuclear Power Plants", Radiation Protection Dosimetry, 140(2), pp.171~181 (2010)[DOI]
- Lee DH, "Performance Evaluation of Experts Predicting the Delay Factors and the Delay Time of the Nozzle Dam Installation and Removal Tasks", J Ergon Soc Korea, 37(2), pp.155~168 (2018)[DOI]
- Chae GS, "Review on the Working Hours of the Radiation Work Plan for ECT through In-service Inspection", J Korea Asso Radiat Prot, 29(1), pp.57~63 (2004)
- Oh HC, "Methodology to Reduce Occupational Dose in NPP Design. K", Korean Nuclear Society Conference (1999)