During the planning and overhaul of the PWR steam generator, a study was conducted to implementa highly accurate dose map. In the overhaul period, the worker is exposed to the CRUD on the inner surface of thesteam generator chamber, and the coolant source remains in the pipe. A dose map was generated by performingMCNP computational analysis with the CRUD and coolant source term derived from the theoretical calculation. Asa result of comparison with the measurement results, an average of 42% underestimation was confirmed. Based onthe measurement results before and after the nozzle dam was installed at the maximum dose rate point of the steamgenerator’s water chamber, the result of the computational analysis that corrected the influence of the CRUD andcoolant source term was overestimated by 14% compared to the measurement results. In conclusion, due to correctingand evaluating the source term based on the field measurement data, the accuracy improved by 28% compared to thecase without correcting.

Abstract

During the planning and overhaul of the PWR steam generator, a study was conducted to implementa highly accurate dose map. In the overhaul period, the worker is exposed to the CRUD on the inner surface of thesteam generator chamber, and the coolant source remains in the pipe. A dose map was generated by performingMCNP computational analysis with the CRUD and coolant source term derived from the theoretical calculation. Asa result of comparison with the measurement results, an average of 42% underestimation was confirmed. Based onthe measurement results before and after the nozzle dam was installed at the maximum dose rate point of the steamgenerator’s water chamber, the result of the computational analysis that corrected the influence of the CRUD andcoolant source term was overestimated by 14% compared to the measurement results. In conclusion, due to correctingand evaluating the source term based on the field measurement data, the accuracy improved by 28% compared to thecase without correcting.

관련 논문AI추천

Dose Reduction Factors for High-Exposure Tasks at Korean Pressurized Water Reactors공태영, 김성준, 김용권, 김지웅, 김희근, 박재옥, 손진호, 송창주, 정형권(사)한국방사선산업학회 · 방사선산업학회지2024 · 제18권 제1호원전종사자 피폭에 기여하는 선원항 고찰 및 감마상수를 활용한 방사선원항 간략 산출에관한 연구김명호, 김민수, 정형권, 최건규(사)한국방사선산업학회 · 방사선산업학회지2025 · 제19권 제2호원전 고피폭 작업의 예측 피폭선량 정확도 개선을 위한 전산코드 시나리오 보정인자 도출 방법론공태영, 김용권, 김지웅, 김희근, 박재옥, 송창주, 조승호(사)한국방사선산업학회 · 방사선산업학회지2024 · 제18권 제3호고피폭 예상 불균일 방사선장하에서 복수선량계를 이용한 피폭방사선량 평가에 대한 고찰공태영, 김희근, 동경래, 신지윤, 최은진(사)한국방사선산업학회 · 방사선산업학회지2017 · 제11권 제4호국내 원자력발전소 방사선작업에 대한 피폭 분석 및 대표 고 피폭 작업 선정김광표, 이찬양, 임영기(사)한국방사선산업학회 · 방사선산업학회지2024 · 제18권 제2호High-radiation-exposure work in Korean pressurized water reactors공태영, 김성준, 김용권, 김지웅, 김화평, 김희근, 박재옥, 손진호, 송창주한국원자력학회 · Nuclear Engineering and Technology2024 · 제56권 제5호

이 간행물의 다른 논문 (13건)