병원건축 마스터플랜의 제안 후 평가에 관한 연구
A Study on Post Proposal Evaluation of Master Plan in Hospital Architecture
0
조회
0
다운로드
0
인용
0
참고문헌
키워드
초록
Purpose: In recent years, since 2000 many hospitals have established a master plan. However, there are some hospitals proceeding in different way from the master plan while the process of execution plan. This is because the study of master plan has been incomplete yet and there is no feedback on the master plan. Therefore, the p`urpose of this study is to find the reasons why differences are occurred. Methods: Comparison analysis of five hospitals which have established master plans and constructed with execution plans and Questionnaire to an architect of execution plan have been conducted. Results: This study has found three points. The first one is the change in scope of business and the change of administrator. The second one is that administrator and staff of hospital have more demands for improvement in functional area rather than public area, like lobby. The last one is to check a possibility of the solution by architectural analysis. Implications: It is necessary to determine the cause of changes from master plan and execution plan, in order to reduce the change in advance.
Abstract
Purpose: In recent years, since 2000 many hospitals have established a master plan. However, there are some hospitals proceeding in different way from the master plan while the process of execution plan. This is because the study of master plan has been incomplete yet and there is no feedback on the master plan. Therefore, the p`urpose of this study is to find the reasons why differences are occurred. Methods: Comparison analysis of five hospitals which have established master plans and constructed with execution plans and Questionnaire to an architect of execution plan have been conducted. Results: This study has found three points. The first one is the change in scope of business and the change of administrator. The second one is that administrator and staff of hospital have more demands for improvement in functional area rather than public area, like lobby. The last one is to check a possibility of the solution by architectural analysis. Implications: It is necessary to determine the cause of changes from master plan and execution plan, in order to reduce the change in advance.
참고문헌 (14)
- Amold C.M Burger, "The new Martini Hospital : the need for Flexibility", ~ (2006)
- Burnaby Hospital High-Level Master Plan, "IBI Group", ~ (2013)
- 김은석, "국내 종합병원의 형태 유형 변화에 관한 연구", 한국실내디자인학회 논문집, 23(6), pp.195~203 (2014), 한국실내디자인학회
- 김은석, "체계 중심 병원건축계획을 위한 공간 깊이에 관한 연구", 한국실내디자인학회 논문집, 24(6), pp.221~228 (2015), 한국실내디자인학회
- Kim, Ha Jin, "A Study on the Architectural Remodeling Strategy of General Hospitals in Korea", Ph.D, pp.2004
- Makoto Nanbuya, "The economical, sustainable technique that utilized an existing building", ~ (2015)
- Queensland Government, "The Townsville Hospital Redevelopment", ~ (2010)
- Metro South Hospital and Health Service Strategic Master Plans, "Queensland Government", ~ (2015)
- "Seoul, 2003, Intelligent City Seoul 2006", ~ (2006)
- University of Oxford, "University of oxford radcliffe observatory quarter", ~ (2008)
- Yang, Nae Won, "A Case Study on the Remodeling of K Hospital in Korea Focused on K Hospital", Journal of the Korean Institute of Interior Design, pp.108~ (2001)
- A Study on the Architectural Planning for Growth and Change in Hospital, "Yu, Young Min", Architectural Institute of Korea, 3~12
- 국토해양부, "공공건축·공공공간 통합 마스터플랜 수립 매뉴얼", ~ (2011)
- "제3차 카리야시 도시계획 마스터플랜 전문", 아이치현 카리야시[URL]
