RPS제도 시행에 따른 의무이행 현황 분석 및 개선방안연구
A Study on the Present State of Duty Performance According to the RPS System and Improvement Plan
0
조회
0
다운로드
9
인용
0
참고문헌
키워드
초록
At the moment, in Korea, over 90% of energy resources depend on imports, and nearly 60% of electric energy is produced using fossil fuel. Therefore, the government adopted the Climatic Change Convention and has implemented the RPS system since 2012 to actively cope with the dependence on imported energy, and to grow and expand the new renewable energy industry. This study examined the performance results of mandatory supply of solar photovoltaic energy and non-solar photovoltaic energy assigned to providers and the present state after implementation of the RPS system. As a result, the achievement rate in 2012 was 64.7%. Especially, solar photovoltaic energy showed a high achievement rate of 95.7%, whereas non-solar photovoltaic energy showed a low achievement rate of 63.3% due to several problems and was highly dependent on the government. In 2013, the burden of each provider has increased due to more mandatory supply and addition of unfulfilled supply of 2012, and the separate mandatory supply of solar photovoltaic energy established for protection of the solar photovoltaic market is restricting investment. Therefore, there is a need to assign mandatory supply in consideration of the available amount of each new renewable energy.
Abstract
At the moment, in Korea, over 90% of energy resources depend on imports, and nearly 60% of electric energy is produced using fossil fuel. Therefore, the government adopted the Climatic Change Convention and has implemented the RPS system since 2012 to actively cope with the dependence on imported energy, and to grow and expand the new renewable energy industry. This study examined the performance results of mandatory supply of solar photovoltaic energy and non-solar photovoltaic energy assigned to providers and the present state after implementation of the RPS system. As a result, the achievement rate in 2012 was 64.7%. Especially, solar photovoltaic energy showed a high achievement rate of 95.7%, whereas non-solar photovoltaic energy showed a low achievement rate of 63.3% due to several problems and was highly dependent on the government. In 2013, the burden of each provider has increased due to more mandatory supply and addition of unfulfilled supply of 2012, and the separate mandatory supply of solar photovoltaic energy established for protection of the solar photovoltaic market is restricting investment. Therefore, there is a need to assign mandatory supply in consideration of the available amount of each new renewable energy.
참고문헌 (6)
- Sin Seongryoung, "A study of policies for the development of renewable portfolio standards (RPS)", 석사, pp.2011
- 김종겸, "비대칭 전압 불평형에 의한 커패시터 동작 특성", 전기학회 논문지 P권, 59(1), pp.18~23 (2010), 대한전기학회
- So Byeonguk, "A Study on analysis photovoltaic business under Renewable Portfolio Standard (RPS)", 석사, pp.2012
- "A guide for mandatory supply of new and renewable energy(RPS)", Ministry of Trade, Industry & Energy, Korea Energy Management Corporation, ~ (2013)
