지열원히트펌프를 활용한 도로융설시스템의 성능 평가 및 예측

An Evaluation and Prediction of Performance of Road Snow-melting System Utilized by Ground Source Heat Pump

0

조회

0

다운로드

6

인용

0

참고문헌

키워드

주제분류기타공학

초록

Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to 5℃, which is the design temperature of road snow-melting, after 2 hours’ operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ±0.4℃ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to 5℃ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to 0℃ after 2 hour and 40 minutes, and it does never increase to 5℃. And the roads paved by ascon and brick is maintained as below 0℃ after 12 hours geothermal circulation.

Abstract

Because of the climate changes and the development of building technologies, the cooling loads have been increased. Among the various renewable energies, geothermal energy is known as very useful and stable energy for heating and cooling of building. This study proposes a road snow-melting system of which heat is supplied from GSHP(Ground source heat pump) in viewpoint of the initial investment and annual running performance, which is also operating as a main facility of heating and cooling for common spaces. The results of this study is as followings. From the site measurement, it is found out that the road surface temperature above the geothermal heating pipe rose up to 5℃, which is the design temperature of road snow-melting, after 2 hours’ operation and average COP(Coefficient of performance) was estimated as 3.5. The reliability of CFD has confirmed, because the temperature difference between results of CFD analysis and site measurement is only ±0.4℃ and the trend of temperature variation is quite similar. CFD analysis on the effect of pavement materials clearly show that more than 2 hours is needed for snow-melting, if the road is paved by ascon or concrete. But the road paved by brick is not reached to 5℃ at all. To evaluate the feasibility of snow-melting system operated by a geothermal circulation which has not GSHP, the surface temperature of concrete-paved road rise up to 0℃ after 2 hour and 40 minutes, and it does never increase to 5℃. And the roads paved by ascon and brick is maintained as below 0℃ after 12 hours geothermal circulation.

참고문헌 (8)

  1. 황광일, "연구·사무용 건물에 적용된 수직형 지열 냉난방시스템의 계절별 성능평가", 대한건축학회논문집 계획계, 25(07), pp.345~352 (2009), 대한건축학회
  2. 황광일, "건물 기초 슬래브에 설치된 수평형 지열교환기 성능의 경년변화", 대한건축학회논문집 계획계, 23(5), pp.179~186 (2007), 대한건축학회
  3. Thomas H. Durkin, "Geothermal Central System", ASHRAE Journal, pp.42~48 (2007)
  4. ASHREA Handbook, "HVAC Application, Chapter 50" (2007), ASHREA
  5. 황광일, "복합용도 건물에 적용된 400RT급 수직형 지열시스템의 입주전 성능평가", 한국태양에너지학회 논문집, 28(3), pp.7~14 (2008), 한국태양에너지학회
  6. 신동걸, "지열원 히트펌프 시스템의 운전방식에 따른 시스템 효율 향상 방법 연구", 석사, pp.2009
  7. Frank P. Incropera, "Introduction to Heat Transfer,5th" (2009), Adrienne S. Lavine
  8. オンサイト型都市融雪システム研究会, "オンサイト型都市融雪システムの実際と計画" (2000), 理工図書