As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.
Abstract
As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.
참고문헌 (9)
- Samsung Economics Research Institute (SERI) management note, "The Change of the Offshore Wind Competitive Paradigm", ~ (2011)
- Moon Seon Jeong, "The Offshore Wind Farm Feasibility Study based on the Analysis of Wind Conditions", Journal of The Korean Society of Marine Environmental Engineers (2010)
- Byung Sun Hwang, "An Understanding of Advanced Wind Turbines", ~ (2009)
- "Wind Energy Handbook", ~ (2006)
- 김현구, "풍력자원 계측자료 분석용 상용 소프트웨어 비교분석", 신재생에너지, 6(2), pp.5~11 (2010), 한국신·재생에너지학회
- "WindPRO 2.7 User Guide book", ~
- "IEC 61400-1 ed3", ~ (2007)
- Do-Hyung Kim, "The interior of a country Offshore feasibility study and promotion strategy", The Korean Institute of Electrical and Electronic Material Engineers, 24(3), pp.13~20
- "Korea Institute of Energy Research, Preparation of a Guide for Permitting and Enhancement of Public Acceptance of Wind Power Development in Korea", ~ (2006)