초록

This paper seeks to present a multi-control method that can contribute to effective control of the production line with multiple bottleneck processes. The multi-control method is the production system that complements shortcomings of CONWIP and DBR, and it is designed to determine the raw material input according to the WIP level of two bottleneck processes and WIP level of total process. The effectiveness of the production system developed by applying the multi-control method was verified by the following three procedures. Raw material input conditions of the multi-control method are as follows. First, raw materials are go into the production line when the number of the total process WIP is lower than established number of WIP in total process and first process is idle. Second, raw materials are introduced when the number of WIP of two bottleneck processes is lower than the established number of WIP of each bottleneck process. Third, raw materials are introduced when the first process and in front of bottleneck process are idle even if the number of WIP in the total process is less than established number of WIP of the total process. The production line with two bottleneck processes was selected as the condition for production environment, and the production process modeling of CONWIP, DBR and multi-control production method was defined according to the production condition. And the optimum limited WIP level suitable for each system was obtained by applying a genetic algorithm to determine the total limited number of WIP of CONWIP, the limited number of WIP of DBR bottleneck process, the number of WIP in the total process of multi-control method and the limited number of WIP of bottleneck process. The limited number of WIP of CONWIP, DBR and multi-control method obtained by the genetic algorithm were applied to ARENA modeling, which is simulation software, and a simulation was conducted to derive result values on the basis of three criteria such as production volume, lead time and number of goods in-progress.

Abstract

This paper seeks to present a multi-control method that can contribute to effective control of the production line with multiple bottleneck processes. The multi-control method is the production system that complements shortcomings of CONWIP and DBR, and it is designed to determine the raw material input according to the WIP level of two bottleneck processes and WIP level of total process. The effectiveness of the production system developed by applying the multi-control method was verified by the following three procedures. Raw material input conditions of the multi-control method are as follows. First, raw materials are go into the production line when the number of the total process WIP is lower than established number of WIP in total process and first process is idle. Second, raw materials are introduced when the number of WIP of two bottleneck processes is lower than the established number of WIP of each bottleneck process. Third, raw materials are introduced when the first process and in front of bottleneck process are idle even if the number of WIP in the total process is less than established number of WIP of the total process. The production line with two bottleneck processes was selected as the condition for production environment, and the production process modeling of CONWIP, DBR and multi-control production method was defined according to the production condition. And the optimum limited WIP level suitable for each system was obtained by applying a genetic algorithm to determine the total limited number of WIP of CONWIP, the limited number of WIP of DBR bottleneck process, the number of WIP in the total process of multi-control method and the limited number of WIP of bottleneck process. The limited number of WIP of CONWIP, DBR and multi-control method obtained by the genetic algorithm were applied to ARENA modeling, which is simulation software, and a simulation was conducted to derive result values on the basis of three criteria such as production volume, lead time and number of goods in-progress.

참고문헌 (12)

  1. Grosfeld-Nir, A., "Gated MaxWIP : a strategy for controlling multistage production system", International Journal of Production Research, 40(11), pp.2557~2568 (2002)[DOI]
  2. Grosfeld-Nir, A., "Push and pull strategies for controlling multistage production system", International Journal of Production Research, 38(11), pp.2361~2375 (2000)[DOI]
  3. Kim, H.N., "A Study on Optimization of Manufacturing Flow Line, Using TOC and Pull-Push System" (2008)
  4. 김정섭, "유전 알고리즘을 이용한 Work-In-Process 수준 최적화", 한국산업경영시스템학회지, 40(1), pp.79~86 (2017), 한국산업경영시스템학회
  5. 권치명, "생산 활동기간 기반 애로공정의 발견", 한국시뮬레이션학회 논문지, 22(3), pp.35~41 (2013), 한국시뮬레이션학회
  6. 이광형, "효율적인 후판 재고관리를 위한 RFID 스캐닝 로봇 시스템 개발", 한국산학기술학회논문지, 17(10), pp.1~8 (2016), 한국산학기술학회[DOI]
  7. Lee, G.H., "The performance Evaluation of DBR for An MTO Manufacturing with an Assembly Process" (2009)
  8. 이호창, "상수 공정 시간을 갖는 라인 생산 시스템에서 DBR과 CONWIP의 성능 비교 분석", 한국시뮬레이션학회 논문지, 21(4), pp.11~24 (2012), 한국시뮬레이션학회[DOI]
  9. Park, S.G., "Performance comparison of process control mechanism due to changes in the production environment", pp.2010
  10. Satya, S.C., "An evaluation of the DBR control mechcanism in a job shop environment", Omega, 29(4), pp.335~342 (2001)[DOI]
  11. Spearman, M.L., "CONWIP : a pull alternative to kanban", International Journal of Production Research, 28(5), pp.879~894 (1990)[DOI]
  12. Watson, K.J., "A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime", International Journal of Production Research, 46(7), pp.1869~1885 (2008)[DOI]

관련 논문AI추천

이 간행물의 다른 논문 (12건)