본문 바로가기
KERD
논문KCI 등재

TOC 기법을 적용한 ERP 표준시간 검증 및 MES 공정실적개선

Verification of ERP Standard Time Using TOC Technique and Improvement of MES Routing Point

1

조회

0

다운로드

4

인용

0

참고문헌

키워드

주제분류산업공학

초록

Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.

Abstract

Recently domestic manufacturing companies have been experiencing worsening profitability and stunted growth due to the long-term economic recession and the rapid rise of developing countries such as China and Southeast Asia. These difficulties force many companies to concentrate their core competencies on new value creation and innovation in order to gain momentum for new growth. Enterprise Resource Planning (ERP) has been considered as one of viable solutions. Among the various modules in ERP, shop floor control function in the production management module is rather limited. In order to overcome this problem, Manufacturing Execution System (MES) has been used as a subsystem which has a strong information gathering power and flexibility. Both systems interact closely with each other. In particular, ERP requires fast, accurate shop floor information at MES. This paper describes how to synchronize relevant information between ERP and MES with theory of constraints (TOC). The processing time information transmitted from the MES workplace is received at the ERP workplace. In the process, the received processing time is causing information distortion in ERP, when the information gathering standard of MES is different from the ERP information interpretation standard. The Drum-Buffer-Rope theory of TOC was applied to resolve this problem, therefore, information synchronization between both systems was made. As a precondition, the standard time of the upper ERP system was rearranged according to the capacity constraints resource. As a result, standard time restructuring has affected changes in labor costs. Standard labor costs have come close to actual ones, and information synchronization of MES transmission data has improved the reliability of standard product costs, such that it enabled various company-wide restructuring actions to be much more effective.

참고문헌 (35)

  1. Denisa, F., "Bottleneck management in discrete batch production", Journal of Competitiveness, 4(2), pp.161~171 (2012)
  2. Gattiker, T. F., "What happens after ERP implementation:Understanding the impact of interdependence and differentiation on plant-level outcomes", MIS Quarterly, 29(3), pp.59~585 (2005)
  3. Golmohammadi, D., "A study of scheduling under the theory of constraints", International Journal of production Economics, 165, pp.38~50 (2015)
  4. Hong, M.S., "Determining CCR by considering facility cost", Journal of the Korean Operations Research and Management Society, pp.387~391 (2004)
  5. 황종호, "활동기반 업무처리를 위한 객체기반 정보화", 한국IT서비스학회지, 12(1), pp.309~321 (2013), 한국IT서비스학회[DOI]
  6. Izmailov, A., "Effective Project Management with Theory of Constraints", Procedia-Social and Behavioral Sciences, 229, pp.96~103 (2016)
  7. Jang, S.Y., "State-of-the-Art of DBR Scheduling Methodology", Journal of the Korean Institute of Industrial Engineers, pp.654~661 (2003)
  8. Jee, Y.J., "TOC", JIT, Journal of the Korean Institute of Industrial Engineers, pp.2004[DOI]
  9. Jung, N.G., "A Study of APS System Design based on the TOC DBR", Journal of the Korean Operations Research and Management Society, pp.532~535 (2001)
  10. 강다연, "국내 기업 ERP 시스템 도입의 정성적ㆍ정량적 성과 비교", 한국콘텐츠학회 논문지, 9(4), pp.142~153 (2009), 한국콘텐츠학회
  11. 김병주, "TOC-DBR 기반의 스마트공장 레이아웃 설계에 관한 연구", 대한산업공학회지, 43(1), pp.12~18 (2017), 대한산업공학회[DOI]
  12. 김승권, "제약공정변수를 통한 자원소요계획(Resource Planning)에 대한 연구: 반도체조립공정 S사 사례를 중심으로", 대한경영학회지, 26(5), pp.1341~1356 (2013), 대한경영학회
  13. Kim, S.K., "An Application Case of TOC Theory on Semi-Conductor Assembly Process", Journal of The Korean Operations Research And Management Society, pp.657~662 (2010)
  14. Kim, W, "Production Management System Constr-uction based on TOC-the case of Hwacheon Machine Tool", pp.2009
  15. Kwak, T, "An Analysis on Important Factors for Selection of Constraint Resource based on Theory of Constraints", pp.2015
  16. Lea, B. -R., "Management accounting in ERP integrated MRP and TOC environments", Industrial Management & Data Systems, 107(8), pp.1188~1211 (2007)
  17. Lee, J.G., "Financial Analysis of the Effect of the ERP System Implementation and the Productivity Paradox", Journal of The Korean Academic Society of Business Administration, pp.1~23 (2008)
  18. Lee, S. H., "Application of Information Technology using Theory of Constraint", Journal of Society of Korea Industrial and Systems Engineering, 19(37), pp.271~278 (1996)
  19. 임규찬, "ERP도입의 성공요인과 시스템 정보특성간의 적합성이 시스템 성과에 미치는 영향분석", 한국콘텐츠학회 논문지, 6(2), pp.136~145 (2006), 한국콘텐츠학회
  20. Lowalekar, H., "Revolutionizing blood bank inventory management using the TOC thinking process : An Indian case study", International Journal of Production Economics, 186, pp.89~122 (2017)
  21. "Ministry of Science, ICT and Future Planning, February 6", 2015 Press Release, 3~ (2015)
  22. Na, C.H., "A Study on the Improvement of JIT", MRP System with Constraint, The Graduate School of Gachon University, 2015
  23. Ock, Y.S., "Development of the DBR Scheduling system using UML and the Visual Basic", Proceedings of the Korea Contents Association Conference, 4(2), pp.31~36 (2006)
  24. Okutmus, E., "Using theory of constraints for reaching optimal product mix :an application in the furniture sector", Intellectual Economics, 9(2), pp.138~149 (2015)
  25. 박민선, "제약이론을 이용한 택트공정관리 개선에 관한 연구", 대한건축학회논문집 구조계, 22(6), pp.139~146 (2006), 대한건축학회
  26. 신현식, "ERP에 대한 전형적 인식 오류에 관한 연구", 한국IT서비스학회지, 9(2), pp.107~127 (2010), 한국IT서비스학회
  27. Sukalovaa, V., "Application of The Theory of Constraints Instrument in The Enterprise Distribution System", Procedia Economics and Finance, 23, pp.134~139 (2015)
  28. Umble, M., "Integrating enterprise resources planning and theory of constraints :a case study", Production and Inventory Management Journal, 42(2), pp.43~48 (2001)
  29. Wen, Z., "Research on a scheduling mechanism in a complex system based on TOC", Chaos, Solitons & Fractals, 89, pp.335~347 (2016)
  30. Wu, H. -H., "A two-level replenishment frequency model for TOC supply chain replenishment systems under capacity constraint", Computers and Industrial Engineering, 72, pp.52~159 (2014)
  31. Yok, Y.S., "Chassis Module assembly process of the production performance method of Acquisition research", Journal of the Korean Operations Research And Management Society, pp.2493~2500 (2013)
  32. 윤건구, "TOC와 통계적 분석에 의한 플라스틱보트 제조공정 개선에 관한 연구", 한국산업경영시스템학회지, 39(1), pp.130~139 (2016), 한국산업경영시스템학회
  33. 요시다 아쯔노리, "복수 DBR 기법을 이용한 PCB 생산라인의 효율적인 생산계획 시스템 개발", 한국산학기술학회논문지, 10(10), pp.2935~2944 (2009), 한국산학기술학회
  34. Yoshida, A., "Improvement of Lead Time at A PCB Manufacturing Line Using TOC Methodology", Korea Industrial Engineering Association spring joint conference, pp.927~932 (2006)
  35. Zhou, Z., "A bottleneck detection and dynamic dispatching strategy for semiconductor wafer fabrication facilities", Simulation Conference(WSC), Proceedings of the 2009 Winter (2009), IEEE

관련 논문AI추천

이 간행물의 다른 논문 (26건)