Machines and facilities are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. By the result of degeneration, non-conforming products and malfunction of machine occur. Therefore a periodic preventive resetting the process is necessary. This type of preventive action is called ‘preventive maintenance policy.’ Preventive maintenance presupposes that the preventive (resetting the process) cost is smaller than the cost of failure caused by the malfunction of machine. The process mean shift problem is a field of preventive maintenance. This field deals the interrelationship between the quality cost and the process resetting cost before machine breaks down. Quality cost is the sum of the non-conforming item cost and quality loss cost. Quality loss cost is due to the deviation between the quality characteristics from the target value. Under the process mean shift, the quality cost is increasing continuously whereas the process resetting cost is constant value. The objective function is total costs per unit wear, the decision variables are the wear limit (resetting period) and the initial process mean. Comparing the previous studies, we set the process variance as an increasing concave function and set the quality loss function as Cpm+ simultaneously. In the Cpm+, loss function has different cost coefficients according to the direction of the quality characteristics from target value. A numerical example is presented.
Abstract
Machines and facilities are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. By the result of degeneration, non-conforming products and malfunction of machine occur. Therefore a periodic preventive resetting the process is necessary. This type of preventive action is called ‘preventive maintenance policy.’ Preventive maintenance presupposes that the preventive (resetting the process) cost is smaller than the cost of failure caused by the malfunction of machine. The process mean shift problem is a field of preventive maintenance. This field deals the interrelationship between the quality cost and the process resetting cost before machine breaks down. Quality cost is the sum of the non-conforming item cost and quality loss cost. Quality loss cost is due to the deviation between the quality characteristics from the target value. Under the process mean shift, the quality cost is increasing continuously whereas the process resetting cost is constant value. The objective function is total costs per unit wear, the decision variables are the wear limit (resetting period) and the initial process mean. Comparing the previous studies, we set the process variance as an increasing concave function and set the quality loss function as Cpm+ simultaneously. In the Cpm+, loss function has different cost coefficients according to the direction of the quality characteristics from target value. A numerical example is presented.
참고문헌 (20)
- Ahn, G.H., "Determination of Starting Value and the Resetting Time for a Production Process with Linear Shift in a Process Mean", Journal of the Korean Society for Quality Management, 26(4), pp.51~64 (1998)
- Arcelus, F.J., "Optimal Production Run for a Normally Distributed Quality Characteristics Exhibiting Non-Negative Shifts in Process Mean and Variance", IIE Transactions, 14(2), pp.90~98 (1982)[DOI]
- Boyles, R.A., "The Taguchi Capability Index", Journal of Quality Technology, 23(1), pp.17~26 (1991)[DOI]
- Chen, C.H., "Determining the optimum process mean based on Asymmetric Quality Loss Function and Rectifying Inspection Plan", IEEE : Industrial Engineering Management Conference, pp.1080~1084 (2004)
- Gibra, I.N., "Optimal Control Processes Subject to Linear Trends", The Journal of Industrial Engineering, 18(1), pp.35~41 (1967)
- Golhar, D.Y., "Determination of the Best Mean Contents for a Canning problem", Journal of Quality Technology, 19, pp.82~84 (1987)[DOI]
- Juran, J.M., "Quality Handbook" (1962), McGraw-Hill Companies, Inc.
- Kamat, S.J., "A Smoothed Bayes Control of a Variable Quality Characteristic with Linear Shift", Journal of Quality Technology, 8(2), pp.98~104 (1976)[DOI]
- 이도경, "손실함수를 적용한 공정평균 이동에 대한 조정시기 결정", 한국산업경영시스템학회지, 40(1), pp.165~172 (2017), 한국산업경영시스템학회
- 이재훈, "공정평균의 변화율이 정규분포인 제조공정의 최적 목표값", 품질경영학회지, 38(4), pp.540~548 (2010), 한국품질경영학회
- Lee, M.K., "Determination of the Optimal Target Values for a Canning Process with Linear Shift in the Mean", Journal of the Korean Institute of Industrial Engineers, 20(1), pp.3~13 (1994)
- Makis, V., "Optimal tool replacement with asymmetric quadratic loss", IIIE Transaction, 28(6), pp.463~466 (1996)[DOI]
- Manuele, J., "Control Chart for Determining Tool Wear", Industrial Quality Control, 1(6), pp.7~10 (1945)
- Pandit, S.M., "Time Series and System Analysis with Applications", pp.307~ (1983), John Wiely & Sons
- 박동근, "선삭가공에서의 인서트 팁의 마모분석과 칩의 형상에 관한 연구", 한국산학기술학회논문지, 16(4), pp.2430~2435 (2015), 한국산학기술학회[DOI]
- Quesenberry, C.P., "A SPG Approach to Compensating a Tool-Wear Process", Journal of Quality Technology, 20(4), pp.220~229 (1988)[DOI]
- Rahim, M.A., "Integrated Model for Determining the Optimal Initial Settings of the Process Mean and the Optimal Production Run Assuming Quadratic Loss Functions", International Journal of Production Research, 42(16), pp.3281~3300 (2004)
- Schneider, H., "Optimal Production Process Subject to AOQL Constraint", Naval Research Logistics Quarterly, 35(3), pp.383~396 (1988)[DOI]
- Springer, C.H., "A Method for Determining the Most Economic Position of a Process Mean", Industrial Quality Control, 8, pp.36~39 (1951)
- Sule, D.R., "Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines", AIIE Transactions, 11(1), pp.540~548 (1979)